Ola Often

Ola Often

Vice President Technology @ Fram Marine AS

About

Records of experience, skills and trainingKey experience: 35 years experience in offshore engineering, naval, subsea, drilling and riser disciplines, including engineering management, offshore installation, software development, product development, marketing and management Specialties: conversion, dolphin, engineering, english, german, marketing, norwegian, personnel, portuguese, production, scientific, software development, specification, technical support,

Country

Norway

City

Oslo

Industry

Oil & Energy

Skill

Engineering, Offshore Drilling, Subsea Engineering, Drilling, Pipelines, Contract Management, Finite Element Analysis, Maritime, FPSO, Energy, Petroleum, Project Engineering, Gas, Instrumentation, Marine Engineering, Electricians, Engineering Management, EPC, Completion, Oil & Gas Industry

Experience

Fram Marine AS

Vice President Technology

Fram Marine AS

LinkedIn
2009-3 - Present · 17 yrs 7 mos

Oslo Area, Norway

Fram Marine Services AS, Oslo, Norway Technical Director Project management for various engineering projects including BP Skarv workover/completion riser system, floating wave energy converter system (Langlee) and floating wind turbine system (Hywind), including infield cable routing and seabed preparation requirements. Offshore subsea installation engineering including survey requirements, sealines routing, power cable installation, trenching and rock installation specifications. Lead engineer Alke subsea study, offloading system (CNG export through STL system) Lead engineer for Scana offloading systems delivery to Engevix, Brazil (6 off), including floating hose supply and structural/fatigue analysis of reel and pedestals. Senior Advisor for verification analyses of offloading hoses for Goliat. Fatigue analysis and verification of power cable fatigue, including specification and follow-up of power cable testing. Advisory for licence partner for FPU upgrade project and subsea developments including ESP installations. Technical Director Hurtigruten, including technical operation of existing and planning and specification for newbuild polar explorer vessels. Current assignment Technical Advisor Hurtigruten explorer ships newbuild project.

2006-2009	FPS Ocean

Vice President Engineering and Technology

2006-2009 FPS Ocean

2006-9 - 2009-2 · 2 yrs 6 mos

Technology Technical specification and development of DeeP Producer 1 DP FPSO, including new disconnectable turret and riser system, process and topsides systems. Technical verification and engineering support up to MC complete. Technical specification and development of DeeP Producer 2 DP WO FPSO, including riser handling/WO system.

Fred.Olsen Energy ASA

Manager Technology

Fred.Olsen Energy ASA

2002-2 - 2006-8 · 4 yrs 7 mos

2002-2006 Fred. Olsen Energy ASA Manager Technology Responsible for drilling rig renewal surveys, life extension projects, new developments. Project Manager for design development and conversion of moored deepwater drilling semi, including complete drilling and subsea (riser & BOP) packages. Technical support to 16" slender drilling marine riser project and weak link verification of riser and well system for completion operation with DP drillship Belford Dolphin.

PGS Offshore Technology

Subsea/R&D Manager

PGS Offshore Technology

1998-1 - 2002-1 · 4 yrs 1 mo

Subsea/ R&D Manager Responsible for development of patented deepwater dry tree semisubmersible production platform, including buoyancy tensioned rigid production risers.

Seanor Engineering

Principal Engineer

Seanor Engineering

1990-1 - 1996-1 · 6 yrs 1 mo

later Marketing Manager and Development Manager Responsible for development of new technology. Pipeline and riser engineering including offshore installation. Turret system development and engineering. Satellite tie-in project for Norsk Hydro.

Brasnor AS/Petrobras/Pag

Flex Principal Engineer

Brasnor AS/Petrobras/Pag

1987-1 - 1990-1 · 3 yrs 1 mo

Flexible pipe technology and products, including software development (laystress and cross section analysis

Kongsberg Engineering

Engineer

Kongsberg Engineering

1983-1 - 1987-1 · 4 yrs 1 mo

Engineer Subsea and riser technology, including development of flexible riser analysis package based on the general non-linear FEM system FENRIS. 1983 NTH, Dep. Marine Structures Scientific Assistant Marine Structures. 1979 Wilh. Wilhelmsen Roustabout On drilling semisubmersible Treasure Seeker.

Education

Norwegian University of Science and Technology (NTNU)

Norwegian University of Science and Technology (NTNU)

LinkedIn

Marine Technology

1977 - 1982 · 5 yrs

Ola Often's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.