
ahmed bakr
senior electro-mechanical engineer
About
hassan mansour. Electrical Engineer at Consolidated Contractors International Company. amr mahmoud. Senior Electrical Engineer at Alshams For construction...
egypt
egypt
construction
commissioning, electrical engineering, project engineering, construction, autocad, contractors, electricity, engineering, inspection, mep, power distribution, submittals, ms project, construction drawings, plc, water pumps
Experience

senior electrical engineer
the arab contractors saudi arabia
* 1- Commissioning of the Electrical items for one Tunnel & three Bridges in Jeddah & Riyadh. The electrical scope of work includes (Lighting Stations 160-300 KVA. & High Masts & Lighting Poles & Under Bridge Luminaries (HPS+LED) and L.V power cables) * 2- Preparing the RFI & Technical Submittals for the Consultant. * 3- Preparing all the procurement Procedures for the Electrical items until the receiving of the materials. * 4- Preparing Shop Drawings.

maintenance engineer
suez canal authority
Responsible of the dredger maintenance

electrical engineer
al-khodari sons co
* A- Infrastructure for Housing Projects in the Regions of the Kingdom * Main responsibilities:- ( Technical Office Engineer ) * 1-Review and revising of all electrical drawings and BOQ. * 2- Preparing technical Submittals. * 3-Procurement of required materials for the whole project. * Electrical scope of work in project includes:- * Six M.V networks 33 K.V & 13.8 K.V (74 Unit Substations, R.M.U and 40 Km of M.V cables) * Six L.V Networks (L.V.D.P, Mini pillars and L.V cables) * Six large Lighting networks (Lighting poles, Lighting Panels and cables) * 16 Pumping Stations (M.C.Cs, Control panels and Pumps range from 32 K.W – 260 K.W) * B- Electrical Maintenance Engineer for Hafr Al Batin water wells station (Station manager)

site electro-mechanical engineer
the arab contractors
Commissioning of waste water stations

electrical site engineer
the arab contractors
1-Supervising Installation of the extension of Ismailia wastewater treatment station which was executed by the Americans (mainly consist of 20 single speed aerators with motors of 60 hp, 20 aerators of double speed, 4 MCC each feeds 10 motors, 4 Transformer kiosks each of 750 KVA, underground duct system, lighting system and chlorine feeding machines) 2- Testing & Commissioning of (7) wastewater pumping stations (Electrical & Mechanical Systems) 3- Operation & maintenance of (1) wastewater pumping stations with 3 main pumps each one with 200 K.W motor. (Electrical & Mechanical Systems) 4- Operation & maintenance of (5) wastewater pumping stations & one wastewater treatment station until the final hand over. (Includes Control of the workers shifts & providing their requires in time)

senior electro-mechanical engineer
the arab contractors
Project Manager of Pumping Stations.
Education
cairo university
electrical engineering
ahmed bakr's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

