Yudhono Prakoso
Chief Engineer, ModADA Remote Sensing @ Freeport Indonesia
About
I am a graduate of Geodesy and Geomatics Engineering from Universitas Gadjah Mada, where I completed both my Bachelor's and Master's degrees through a fast-track program in less than 5 years, earning the cum laude distinction. With a strong background in the mining industry, I have been working in this field since late 2016. Currently, I hold the position of Chief Engineer in the Tailings and River Management Project at PT. Freeport Indonesia. Throughout my career, I have gained extensive experience in managing various aspects related to Surveying, Remote Sensing, and Geographic Information System (GIS). I have successfully leveraged my skills in these areas to contribute to the success of projects. In addition, I have been entrusted with developing my expertise in Project Management and Control, particularly in the implementation of the Fiber Optics Monitoring System for levee stability and Geotube Structure project to optimize tailing utilization and improve tailing retention. I have also obtained a professional engineer certification, further supporting my abilities in managing diverse projects.
Indonesia
Jakarta
Mining & Metals
TUNAMI, Matlab, Fortran, ArcGIS, AutoCAD, PostgreSQL, Global Mapper, Borland C++, SVG, Remote Sensing, Microsoft Office, Spatial Analysis, maptek
Experience

FGDP - Mine Survey and GIS Engineer
East Borneo Province, Indonesia
Project : Indominco Coal Mining Project, Bontang Dept. Engineering Sect. Mine Survey Customer : PT. Indominco Mandiri an ITM Subsidiary (BANPU Group, Thailand) Responsibilities: 1. Full fill the learning objective in order to complete Fresh Graduate Development Program – Mine Survey Engineer. 2. Assist Mine Survey Section Head and Chief Surveyor to co-ordinate Surveyor and Instrument Man in order to collect survey data: a. Daily (loader position, sump elevation, deformation monitoring, coal getting progress). b. Weekly (weekly map, sampling vessel, sampling front both coal and overburden, and aerial mosaic photo). c. Monthly (End of Month measurement of overburden and coal). 3. Assist Mine Survey Section Head and Chief Surveyor to provide excellence survey services for: a. Short Term Mine Plan Engineer (stake out monthly pit and waste dump design). b. Long Term Mine Plan Engineer (stake out land clearing boundary). c. Mine Infrastructure and Geotechnical Engineer (stake out infrastructure design and provide deformation point movement). d. Drill and Blast Engineer (stake out drill pad plan, pick up borehole coordinate, and actual blasting boundary). 4. Knowledge sharing to enhance survey skills performance of surveyor and instrument man.
Education
Yudhono Prakoso's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




