Venkateswara Rao Kedarisetty
Head (Track & Claims) @ GMR Group
About
IRSE Officer with 29+ Years’ experience in Indian Railways (Joined IRSE service in 1990). Constructed about 400 Km of Track (in Doubling and Gauge Conversion) which include Track Bed, Bridges, Track, Stations etc as Chief Engineer and Dy Chief Engineer on Indian Railways Rendered Inspection Services to Hyderabad Metro Construction & commissioned 30 Km of metro. (Nov-2013 to Apr 2018) Planned and Manged construction of over 150 Road Over/Under Bridges on Railways. 20 such bridges commissioned in 2019-20. Increased Turnover of Secunderabad unit of RITES Ltd from Rs 18 Cr to 100 Cr in 3 years (2015 to 2018). Fattened the order book of the unit from Rs 17 Cr to 700 Cr during this period. Accordingly turned around the profits from negative to positive (to Rs 35 Cr) in three years. Planned and executed rail connectivity to Oil Companies, Power Companies and Ports in South India. (Clients: BPCL, CONCOR, APGENCO, TSGENCO, Chennai Port, Visakha Port etc). Made a blue print for Sub-Urban Rail system for Bengaluru. This got all round appreciation from Govt of Karnataka and Ministry of Railways. This led to sanction of Sub-Urban Rail Project at Rs 8999 Cr. Maintained Track, Bridges, Buildings etc for over 10 Years. Secured all India 8th rank in Engineering Services Exam – 1988. Secured 99.99 percentile in GATE-1988. Consistently topped College/University since School Days. Currently authoring a book "Bhagavad Gita - The Myths & Facts" to bring the treasure of Management Skills to the Professionals.
India
Surat
Construction
Training, British Standards, Design Drawings, Client Requirements, Analytical Skills, Civil Construction, Subcontracting, Microsoft Office, Construction, Contract Negotiation, Construction Management, Track Construction, Contract Management, Claims Management, Project Planning, Engineering, Construction Project Management, Finance Management, AutoCAD, Microsoft Excel
Experience

General Manager
Secunderabad - India
Increased Turnover of the unit from Rs 18 Cr to 100 Cr in 3 years Rendered inspection services to Hyderabad Metro for construction of metro and commissioned 30 Km. Drafted Bid document and fixed executing agency for doubling of track (90 Km) in a record time of 180 days. Planned and implemented rail connectivity to BPCL, APGENCO, TSGENCO, CONCOR and various sea ports in South India. Constructed 3 lakh sft industrial/laboratory/office space in 2 years. Made blue print for sub urban rail system for Bengaluru which resulted in sanction of the Ts 8999 Cr sub-urban rail project by Govt.

Sr Divisional Engineer / Co-Ord
Guntur and Guntakal of Andhra Pradesh
Headed Civil Engineering Department of the Division. Maintained the Track and Bridges of the Division. Cleared all Track Maintenance arrears pending over 5 years. (Like Track Renewals, Ballast Procurement etc). Reduced the Accidents and enhanced the Safety performance of the Division.

Dy Chief Engineer and Divisional Engineer
Various places in South Central Railway
Planned and Constructed about 400 Km of track (Doubling and Gauge Conversion) which include Track bed, Bridges, Track, Stations etc. Commissioned the projects (from concept to commissioning) in a record span of 2 Years.
Venkateswara Rao Kedarisetty's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




