Thomas Leung
Senior Architect @ CLP
About
• Over 13 year experience in architectural design & building industry • Focused on public sector, eager to join as in-house project management. • Hands on experience in overseeing the entire lifecycle from schematic design to completion stage including developing master programme, statutory submissions timelines, coordinating resources, and monitoring construction progress to ensure that all works stays on track and within budget. • Strong in designing architectural plans, collaborating with clients & stakeholders of all levels, sustainable architecture, contract & tender admin and staying current with building regulations and related codes. • Motivated, organized, attention to details, problem solver & strong team player.
Hong Kong SAR
Hong Kong
Architecture & Planning
Design and Build, Architectural Project Management, Minor works, Material Selection, Claims Resolution, Value Engineering, Contract Adminstration, Commerial building , Retail Design, Wholesale conversion, Contract Administration , Residential Design, High Rise Residential, Architects, Sport facility , Design Management, Transportation, Digital Project Management, Communication, Presentations
Experience

Assistant Manager
Hong Kong SAR
• Acted as a team leader for architectural and interior design • Coordinated with site team for construction/ statutory submission programme and site operation phasing plans • Monitored and reviewed of design consultants’ performance • Conducted Design Interface Coordination Meeting as a host and liaise with the Client, relevant government bodies, parties and consultants for all design activities • Reviewed all design drawings & submissions for Client Approval • Monitored the work progress of BIM Models • Assisted Design Manager to manage the consultancy contracts and review of payments • Prepared the proposals to Lands Department for land grant boundary and maintenance matrix with underground utilities • Liaised with Quantity Surveyor to execute procurement process • Collaborated quantity surveyors for budget plans to ensure cost-sufficient design within Contract and Specification requirements • Prepared the submission for Claims and Extension of Time with in-house quantity surveyors to preserve the right to cover additional costs caused by client’s requests or contract disputes Achievements: • Lead teams of Architects, interior designer & engineers and managed projects • Archived significant Saving by Value Engineering under client requirements through enhancement of façade design, interior design, material selection, work sequence, etc Key Projects: • Automated Car Park A at HK Boundary Crossing Facilities Island, The Airport Authority Hong Kong (Design & Build Project to construct car parking facilities adopting automated parking systems (APS) at the Island of Hong Kong-Zhuhai-Macao Bridge (HZMB) for accommodating cross-boundary inbound private cars. It is providing 1,800 parking spaces for drop-off & pick-up areas, and provide waiting lounges with check-in facilities for passengers with flight departures from Airport.)

Project Architect
Hong Kong SAR
• Assisted Chief Architects to manage a Design and Building Project and facilitated the role of local architect • Managed the statutory submission documents and drawings • Prepared the construction drawings and coordinating with Main Contractor and Subcontractor • Coordinated the detail designs and handling design submissions for Approval from Home and Youth Affair Bureau • Handled the Beam Plus Assessment procedure Achievements: • Lead 2 Architectural Assistants and Draftsmen to handle the local statutory submission with BIM system etc. Key Projects: • Kai Tak Sports Park - Main Stadium, Kai Tak Sports Park Ltd. (With a seating capacity of 50,000 boasts a retractable roof, the Stadium has been designed to meet the standards of major international events with customizable staging and host a wide range of international events in any weather. A vast activity platform sets against a panoramic glass wall that provides exceptional views toward Victoria Harbor.)

Project Architect
Hong Kong
• Responded to Chief Architects and handle the project as project architect • Involved to the residential towers design • Managed the statutory submission documents and Drawings • Drafted sales brochure under Client’s Legal Department Key Projects: • St Michel, 33 To Shek Street, Sha Tin, Sun Hung Kai Properties (Developed in 2 phases. The residential Development offers 335 units across 5 blocks with 19 storeys and 3 storeys podium. The Date of Occupation starts from Jan 2022.)

Architectural Assistant
Hong Kong
• Assisted Authorized Person and Project Architect • Conducted the regular project and design meetings as a host and coordinated between Client, Consultants & Construction Team • Handled statutory submissions with other consultants • Prepared tender documents and drawings • Liaised with Quantity Surveyor to execute procurement process • Reviewed tender return & prepared Client tender recommendations • Monitored site safety site work progress and quality of works as an AP’s TCP • Reviewed contractor’s submissions • Monitor contract execution as contract administrator • Prepared the payment certificate and routine documentation management • Assessed the Contractor’s Submission for extension of time Key Projects: • Magnet Place Tower 1 & Tower 2, Kwai Fong, Hong Kong Tai Hung Fai Enterprise Co. Ltd. (Commercial project involved the revitalization of two 16-storey industrial buildings built in 1978 into commercial and office space under the Wholesale Conversion of Industrial Buildings Scheme, converted to shopping arcades with new linking bridge connecting between 2 towers. Structural alterations and demolition at upper towers were involved. The approximate area of the renovation works is about 33,400m2.)

Architectural Assistant (Year-out)
Andrew Lee King Fun & Associates Ltd.
Hong Kong
• Assisted Chief Architects to managing a Design and Building under Main Contractor and facilitate the role of Local Architect • Managed the statutory submission documents and Drawings • Prepared tender documents and drawings • Prepared the construction drawings and coordinating with Main Contractor Key Projects, Refurbishment of: • Park at Ngoi Man Street, Shau Kei Wan • Public Toilet at 28 Tung Hei Road, Shau Kei Wan • Exhibition Galleries of Hong Kong Central Library • Aberdeen Jockey Club Clinic, Aberdeen

Architectural Assistant (Year-out)
Hong Kong
• Assisted Authorized Person and Project Architect • Liaised with Client’s representative to capture design requirements • Prepared the façade design proposal and tender documents for procurement and the fitting out design proposal and drawings for procurement • Coordinated with MEP engineer for building service design Key Projects: • The Hemispheres, Causeway Bay H-Collection by Henderson Land Development Company (consists of 119 units, having 31 stories including 3 levels of podium, which the clubhouse is located on the 2F, and F&B occupied GF respectively) • High-West, Sai Wan H-Collection by Henderson Land Development Company (A signature property group for Henderson Land having 28 stories with the clubhouse located on G/F.)
Thomas Leung's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




