Tatag Setiawan
Senior Project Manager @ VINCI Energies
About
Over 20 years experience in Oil & Gas Well head / Production Facilities Projects both Onshore and Offshore. Involved and have good knowledge in Project Management starting from Commercial & Tendering Process; Contract Review and Negotiation; Project Execution Process: Detail Engineering, Procurement, Subcontracting, Fabrication, Inspection, Construction, Installation, Hook-up, Pre-commissioning, Commissioning and Start-up, Final Documentation and Project Closed out. Acts as the central point for all project activities including engineering, procurement, construction, commissioning (as applicable) and retains the final responsibility for the execution of the Project. Represents the Company towards the Client and resolves all issues related to the implementation of the Project activities. Performs an in depth review of the contract, the tender and bid documents. Also experience in Multiple Projects Coordination, Control and Interfacing; have excellent interpersonal, written, and oral communication skills and superior planning and organizational skills.
Indonesia
Jakarta Metropolitan Area
Oil & Energy
Senior Program Management, Project Management, Procurement, Construction Management, Engineering Management, Tender Management, Multiple Project Coordination, Project Control, Engineering, Offshore Drilling, Inspection, Electricians, Gas, Factory
Experience

Senior Project Manager
Greater Jakarta Area, Indonesia
As Senior Project Manager for several projects such as: . PT Pertamina Hulu Energi Offshore North West Java (PT PHEONWJ) for NGLB and OWTP Platforms Fire & Gas Detection System Upgrade Project. EPCI for F&G Detection System Upgrade for 2 Offshore Platforms (2011). . PT PHEONWJ BRAVO Flow station Compressor Control System Upgrade Project. EPCI for Upgrading Compressor Control System (2 trains - 4 unit Compressors) at Bravo Flow station (Off Skid Contractor; 2011-2012). . PT ADARO Indonesia Kelanis Optimization of Hopper 1 to 7 Electrical Facility Development Project. EPCI for Kelanis Coal Loading & Storage Plant Electrical Works Development and Upgrade (2011-2012). . PT PHEONWJ LIMA and ECHO Flow Stations Fire and Gas Detection System Upgrade Project. EPCI for F&G Detection System Upgrade for 8 Offshore Platforms at Lima & Echo Flow stations (including HVAC’s Unit and ducting replacement); (2012-2013). . PT PHEONWJ FOXTROT Turbine Compressor Train A&B Control Retrofit Project. EPCI for Upgrading Compressor Control System (2 trains - 4 unit Compressors) at Foxtrot Flow station (Off Skid Contractor; 2014-2015). . PT McDermott Indonesia - PC Muriah Ltd Kepodang Gas Development Project; Provision of Construction, Field Engineering, Supply, Installation, and Commissioning Services for CPP Control Building at Rumah Gajah Mungkur (2015). . PT. Multi Kusuma Cemerlang (Barito Pacific - Michelin). Rubber Re-Milling Factory Samarinda; Main Contractor Scope of Work: Enginnering, Procurement, Installation, Testing and Commissioning of CSA Works and MEP Works (2016 - 2017). . PT Indah Kiat Pulp & Paper Tbk. Scope of Work: Electrical, Instrumentation and Automation, Installation Works for Tissue Machine unit 9.1 and 9.2 (2017- 2018). . PT PLN (Persero) UIP SUMBAGTENG Pekanbaru, Engineering, Procurement, Construction, Testing, and Commissioning GITET 500 kV New Aur Duri Jambi (2018 - 2021) JKT02 Ph1 (01/22 - 01/24), Deputy PM. JKT02 T2,T3 (04/24 - Now), Project Director.

Senior Project Manager
Greater Jakarta Area, Indonesia
As Senior Project Manager for BP West Java NGL and Uniform Flowstation Fire & Gas Detection System Upgrade Project. The scope of works include: Engineering, Procurement, Construction & Commissioning including of F&G Detection System Upgrade for 8 Offshore Platforms.

Project Coordinator
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
Assist Project Department Manager to coordinate the Projects. Organize and manage the Project Control of the Company. Provide Project Teams with adequate services for effective planning and control of schedules, progress and costs in order to support Project Managers to complete the projects within the targets set forth in the commercial phase and in compliance with Client's control requirements. Provide Company Management Function with the data, limited to Projects controlled, needed for budget and quarterly forecast reporting. Foster the development of the Project Management culture and systems, monitoring they are adequately and correctly applied in the operating teams. Projects coordinating such as: . Caltex - JO with Wifgasindo for EPCI Duri Steam Area 10 Computerized Steam Injection Flow Metering (2002-2004). . Pertamina UPMS III - Consortium with Truba Jurong for EPCI Depot Cikampek Development (2003-2006). . Sempec - Total Peciko 3 HPU; Eng, Proc, Fab (2003-2004). . Vico - Mutiara; Eng, Proc, Install SSD, F&G Panel (2003-2004). . EMP Kangean - E/I Maintenance services East Java (2005-2007). . BP West Java - E/I Maintenance services (2005-2006). . Medco South Sumatra - Install Elect Facilities (2005-2006). . Conoco Philips - E/I Maintenance Services Ph 1 Western Hub Natuna (2005-2008). . Technip - Conoco Philips Kerisi WHCP; Eng, Proc, Fab (2005-2006). . RPE - Ujung Pangkah N2 Skid; Eng, Proc, Fab (2006). . Technip - Conoco Philips N2 Skid Kerisi; Eng, Proc, Fab (2006). . PAL-RPE - Ujung Pangkah Wellhead P/F; Install, pre-comm of E&I, Telecom, and F&G system (2006). . Gunanusa - BP Tangguh Wellhead VRA & VRB P/F; Install, pre-comm of E&I, Telecom, F&G system (2006). . Nisconi - Conoco North Belut WHCP & Fussible Plug; Eng, Proc, Fab (2007). . Petrochina - WHCP Batara Complex; Eng, Proc, Fab (2007). . BP Arjuna OSB - EPCI for Gas Detection Upgrade; (2007). . PAL - Santos Oyong OPF Ph II Grati; PCI for E/I OPF scope of works (2008-2009).

Project Manager
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
As Project Manager for BP West Java Mike-Mike and AVSA Fire & Gas Detection System Upgrade. The scope of works include: EPCI Contract for Fire & Gas Detection System Upgrade at Offshore platforms at Mike-Mike Flowstation and AVSA including supply & manage offshore manpower, tools, equipment, and accommodation facilities at Offshore Construction and Accommodation Barge.

Project Manager
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
As Project Manager for PetroChina Batara Complex Development Project Jambi - WHCP Fabrication. The scope of works include: Design, Procurement, Fabrication, and Testing of 12 Unit Pneumatic WHCP.

Project Manager
Greater Jakarta Area, Indonesia
As Project Manager Unocal Melahin Restoration Project for EPCI of Power Control Room (PCR). The EPCI scope works include: Engineering, Procurement, Fabrication, Installation, Pre-commissioning, and Commissioning of PCR Building including all equipment and panels such as: LV MCC, LV Switchgear, PCS/SSS Panel, Operator Workstation, DC Panel, UPS, Battery & Charger, PAGA, HVAC, F&G Detectors, Lighting System, and all cabling inside PCR.

Project Manager
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
As Project Manager for Conoco Philips Fire Alarm System development at Onshore facility Grisik South Sumatra. The scope of works include: Supply and Installation of Fire Alarm system for Onshore Facility of ConocoPhillips Grisik Area.

Project Manager
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
As Project Manager for Unocal Kerindingan Design Procurement and Fabrication of SSS PLC based panel.

Project Manager
Cegelec - PT Indokomas Buana Perkasa
Greater Jakarta Area, Indonesia
As Project Manager for Pertamina UP II Dumai EPC of Operator Training Simulator and Laboratory Information Management System development.

Project Manager
Greater Jakarta Area, Indonesia
In Consortium with Franco Pacific Vietnam as Project Manager for CPPMB Vietnam 110 kV Substation development Project. Consist of 3 new substations development: 110kV Le Thuy s/s, 110 kV Hoa Khanh s/s, 110 kV Dong Hai s/s. EPCI M/E Scope of works include: Steel Structures, HV equipment of oudoor substations, 24 kV Switchgear, Protection & Control Panels, AC/DC Distribution Boards, Charger and Battery 220VDC & 48VDC for Telecom & Scada Equipment, Telecom & Scada Equipment, ACSR Conductors & insulators, MV & LV Cables & Lugs, groundings, and accessories.

Project Manager
Curug Karawang West Java Indonesia
Consortium w/ Alstom Power as Project Manager for M/E Local portion EPCI for the Contract with Perum Jasa Tirta II Curug Pumping Station Upgrade and New Mini Hydro Electric Power Plant development Project. Scope of works include: . Pumping Station: dismantling 6 ea existing pumps, installing new 4 ea pumps 17.5m3/s & 2 ea pumps 10 m3/s; wooden cofferdams; cooling system; new 6 flap valves; new stoplogs, replacement of all electrical equipment: 6kV switchboard, auxiliary transformers, LV AC and DC switchboards, battery and battery charger, control system equipment for pumps, switchyard, and remote control for the two hydro generating unit. . 70 kV Outdoor Substation: dismantling of the existing HV equipment, transformers and 3 auxiliary MV/LV transformers, cubicles; installing new HV equipment switchgears, transformers and of 3 auxiliary MV/LV transformers and cubicles; cables and grounding system. . Power Station: two 3.400 kW bulb units with their completed control system: hydraulic control system, excitation and voltage regulation system, unit control board housing the starting and the protection relays; two downstream fixed wheel gate with their hydraulic control system; one thrash rack cleaning machine; four sets of upstream stoplogs with all fixes parts; one gantry crane; two Generator MV equipment; the MV cables between the generators in the power station up to the 6.6/22 kV power transformers in the 70 kV outdoor substation; the LV AC distribution switchboard with their feeding cables from the pumping station; the LV DC cables for the supervisory control system from the DC station service in the pumping station; two water level measuring equipment; the cooling water system; the dewatering and drainage system; the ventilation system; the lighting system; All the LV and DC necessary cables in the power station between cubicles and equipment; the data and telephone transmission cables between the pumping station and the power station.

Site Manager
Indonesia
. SEMPEC - TOTAL PECIKO EPSC 3 Senipah OPF - New E / I, Telecom, F&G system (1999). . TRIPATRA - MOBIL OIL NSO A Field Development OPF - New E / I, Telecom, F&G system (1998). . KOMARITIM - ARCO Bali North PGE 1 & 2 - E / I, Telecom and F&G system Upgrade (1997). . AMOSEAS GEOTHERMAL - Drajat New E / I, Telecom, F&G system (1996). . UNOCAL GEOTHERMAL - Gunung Salak phase 1 New E / I, Telecom, F&G system (1995). . KOMARITIM - ARCO West Java BRAVO Compressor Platform modification E / I, Telecom, F&G system (1994). . GSB - UNOCAL ATTAKA L Platform - E/I, Telecom, F&G system Fabrication yard phase (1993-Site Engineer). . Bechtel - PBI - Mobil Oil Dehydration Project - Instrumentation System Calibration, Precomm, Commissioning & Start up (1992-Site Engineer).
Tatag Setiawan's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


