25 years’ experience from larger Oil & Gas Projects. Mainly with planning but also from fabrication / installation methods and completion work. Close corporation with Engineering and Procurement ensure a strong knowledge to the entire chain of value through a project lifecycle. Exelent with calculation of resources. Long experience with Performance and Risk analysis. Key elements in my experience are as following: * Project Execution Model (PEM) * Procurement Milestone Plan (PMP) * Building of Precedence Network * Experience with Prima Vera Planning system * Experience with Safran Planning system * Milestones * Analysis of available float * Critical Path analysis * Key activity schedule(s) * Multi-discipline * Manpower calculation (hours) * Manpower density calculation * Schedule Risk assessment * Deviation & Trend analysis * Reporting / Presentations * Mechanical Completion phase * Construction and Hook-up work * Construction Methods * Completion Methods * Change control * Identification of KPI’s

Country

united states

City

milton

Industry

oil & energy

Skill

oil/gas, project planning, construction, oil and gas, onshore, commissioning, engineering, petroleum, epc, gas, project control, feed, petrochemical, onshore operations

Experience

oslo metro company

planner

oslo metro company

maersk oil

f and p planner

maersk oil

2017-6 - Present · 9 yrs 4 mos
stig solberg

planner

stig solberg

2018-2 - Present · 8 yrs 8 mos
samsung heavy industries

general manager

samsung heavy industries

2014-11 - 2016-8 · 1 yr 10 mos

Samsung Heavy Industries, Basis, Geoje, South Korea, General manager, Project Risk & Integrity Management (PRIM team). Introduced and followed up implementation of EPCI model for Oil&Gas projects in general Through planning coordination increased the quality of planning and reporting and promoted planning as a management tool. Performed analysis and gave proposals for alternative methods related to construction works to improve quality, save cost and/or reduce risk. Prepared reports and presentation to support top management decitions and attended all operation steering committes. Developed new procedures for Planning and Construction work. Supported training of Juniors. Direct involved in: - Martin Linge, 20.000 MT Topside for Norway - Ichthys, 168.000 MT Semi-Sub. for Australia - Egina, 142.000 MT FPSO for Nigeria

emas group

senior planner

emas group

2011-10 - 2012-2 · 5 mos

Work with the establishment of Prima Vera as main planning system for EMAS AMC oslo

aker solutions

yard planner

aker solutions

1995-5 - 1998-7 · 3 yrs 3 mos

Responsible for coordination of surface treatment activities between all projects according to the yard total capacity

eni norge as

lead planner

eni norge as

2010-1 - 2011-9 · 1 yr 9 mos

Goliat Project. Established level 1 & 2 schedules and followed up and supported Contractor in his work to establish a Baseline Schedule and Project Control Routines to meet Company requirements and secure correct reporting.

misc berhad

planning and reporting manager

misc berhad

2007-1 - 2007-9 · 9 mos

Gumusut Kakap Project. Engaged in a Project Advisory Team (PAT) for Malaysia International Shipping Company in the Gumusut Kakap Project. Worked in the position as Planning & Reporting manager.

statoil

mech completion coordinator and commissioning planner

statoil

2004-7 - 2006-12 · 2 yrs 6 mos

South Pars Phase 6, 7 & 8. Responsible for follow-up and help Contractor to establish a Commissioning Schedule and monitor/ verifying Contractor Construction and Mechanical Completion activities and corresponding reports.

statoil

planning engineer

statoil

2003-2 - 2004-3 · 1 yr 2 mos

Kristin Riser Balcony & Flare Project. Resonsible for follow-up of Contractor Fabrication / Installation work and reported progress

aker solutions

senior planner

aker solutions

2000-7 - 2003-1 · 2 yrs 7 mos

Maureen De-Commissioning Project. Responsible for multi-discipline planning off all de-commissionig work inshore / onshore

smedvig offshore

planning manager

smedvig offshore

1999-5 - 1999-12 · 8 mos

West Navion Project. Responsible for Planning & Reporting during the Hook-Up and Commissioning Phase of RAM - RIG Drilling system. Supervision of two network planners.

aker solutions

construction planner

aker solutions

1998-7 - 1999-1 · 7 mos

Oseberg South Project Follow-Up Aker Stord and Sub-Contractors Pre-Fabrication SOW, including Engineering

aker solutions

area coordinator

aker solutions

1997-1 - 1997-12 · 1 yr

Njord Project Coordinated Hook-Up activities between Hull and Deck in to shafts during the Hook-Up phase At-Shore.

aker solutions

trainee

aker solutions

1995-1 - 1995-7 · 7 mos

* Trainee Aker Stord * 1 month at the Corrosion Tech.Departement * 1 month at the Welding Tech. Departement * 1 month at the Dimensional Departement * 2 months at the Project Ctrl. Departement * 2 months at the Final Documentation Departement

aker solutions

methods engineer

aker solutions

1992-1 - 1994-12 · 3 yrs

* Method Engineer, Departement for Constr. Methods and Marine Operations * Fabr. sequences / welding methods * Inst. methods / sequences * General Methods * Preperation of Bids * Preperation of Manuals * MTO

sevan marine asa

senior planner

sevan marine asa

2012-1 - 2012-8 · 8 mos

Voyager Project. Responsible for establishment and linking of the Commissioning Schedule for Sevan Marine Voyager Project into the Project overall Integrated Schedule and further on for the weekly / monthly reporting

conocophillips

senior planner

conocophillips

2012-8 - 2013-2 · 7 mos

Monitored and verified Contractors onshore construction work and planning for the following Offshore Hook-Up campaign. Participated in all Hook-up preparation meetings and detailing of Offshore scope of work

statoil

project ctrl engineer

statoil

2007-8 - 2008-4 · 9 mos

Ormen Lange Southern Field Development (Phase 2) Follow-up and maintain the Marine Operation Program / Schedule, the Project master Schedule (PMS) and invoice / cost control of the contracts for the Flow Line installation, Sub-Sea Lines and Trenching. Planning of the marine Operation Program included also identification and categorizing of RISK elements for accomplishment of the program.

aker solutions

planner

aker solutions

1999-1 - 1999-5 · 5 mos

Eldfisk Water Injection Project. Commissioning Phase Multi Discipline planning and coordination of construction activities to support the commissioning schedule

stig solberg's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.