Stefan Hulsbosch
Completions & Commissioning Manager @ John Holland
About
Stefan is an expert Completions / Commissioning Manager with over 20 years’ experience in all critical disciplines such as instrumentation, electrical (LV and HV), control systems and communications, piping and mechanical rotating equipment, renewable energy technology and associated quality systems. Stefan has extensive experience with the management and development of various third party quality and completion system software. He collaborates positively with all stakeholders and has engaged with clients and industry leading businesses including GENEX, Hunter Water, Sydney Desalination, Amcor Paper, Shell, Basell, Caltex, Santos, Apache, Exxon and Sundrop Farms. Stefan has worked on various process technologies such as Pumped Hydro, Concentrated Solar, desalination, hydrocarbon storage, refining (clean fuels), gas production (conventional and coal seam gas unconventional), polypropylene production, tunneling and rail.
Australia
Greater Newcastle Area
Renewables & Environment
Project Management, Project Planning, From Conception to Completion, Quality Management, Electrical Engineering, Petrochemical, LNG, Commissioning, Management System, Structures, Cables, EPC, Construction, Microsoft Office, Refinery, CAD, Hazardous Areas, Project Engineering, Construction Management, HAZOP
Experience

Completions & Commissioning Manager
Einasleigh, Queensland, Australia
Completions & Commissioning manager for the Kidston Pumped Storage Hydro project in Far North Queensland. The project is delivered as a joint venture between McConnell Dowell and John Holland. This project is an existing abandoned gold mine and will be is used as a Pumped Storage Hydro Project, the scope involved is the construction of an upper reservoir (New Dam) and lower reservoir (Existing Mine Pit) and tunneling system including, Power house cavern, access tunnels, vertical intake shafts, cable and ventilation shafts and tail race tunnels. The Powerhouse contains 2 x 125MW Francis Turbines which act as both a generator and pump. The electrical system joins a new 275kV transmission network which is installed by others. https://www.youtube.com/watch?v=rYeBQFw_sPA https://www.youtube.com/watch?v=HsgSud0QS6c (Update) Setting up and managing the quality FAT inspections in the overseas fabrication facilities in Asia and Europe. I spend 7 weeks in Europe visiting fabrication facilities to witness FAT testing for most electrical systems. Commissioning planning using Completions and Commissioning management software (CCMS) on this project we are using Silverhorse AssetHive. Setting up the commissioning structure from Construction to Pre-commissioning, to commissioning (Dry and Wet) to Start-up, AEMO Hold Point Testing, Performance Proving and lastly Custody transfer. The Commissioning planning will involve all aspect of commissioning in relation to commissioning a hydro PowerStation which includes, commissioning planning (Commissioning program), set-up commissioning strategy (set up staged gates) Commissioning Safety (LOTO process, Pre-start Reviews), Documentation management (Check lists, permits, commissioning certificates), Interfaces with interested parties (eg. the client, AEMO, Utility, consultants, authorities), Training requirements (Operators and Maintenance)

Commissioning / Completions Manager - Farley Waste Water Treatment Plant - Hunter Water
Maitland, New South Wales, Australia
John Holland has secured a panel position with Hunter Water Corporation. They release a number of capital works projects every year which vary from new plants to upgrades of their water treatment and waste water treatment plants in the Hunter Valley in NSW. John Holland has secured 3 projects, 2 of which are at the final stages of commissioning and 1 that is in the middle of construction. The projects are: 1. Dungog WWTW, this is a $40M project replacing the existing 70 year old Dungog WWTW. The project consist of full process infrastructure from Inlet works, bioreactor, MBR membrane filtration, UV system and utilities. 2. Kurri Kurri WWTW, this is the smaller project of the 3, this project was an upgrade where a new clarifier was built and commissioned as well as an upgrade with the addition of 2 new blowers. 3. Farley WWTW, this is the larger project of the 3, and is in the middle of construction, commissioning due in May 2020. This project consist of a dewatering plant, a new bioreactor with MBR membrane filtration and also a PLC upgrade. Responsibilities: Safe commissioning of process Set-Up quality/completion system with the look-ahead of effective commissioning and hand-over to operations. This includes the FRP and earthworks disciplines as well as Mechanical and Electrical. Manage quality and completion system progress and completion tracking. Develop the Testing and Commissioning Plan Develop the Seeding and Process proving plan Support the implementation of the project Quality management system including NCR management, Worklot structure development and defect coordination Manage the commissioning from Pre-commissioning through SAT to Process proving. Manage the Software FAT testing and witness specialised equipment FAT Testing. Client interaction and liaison, stakeholder management, auditing / inspections, continuous improvement on quality and commissioning systems.

HV/LV Electrical Commissioning Lead - Canberra Metro
Canberra, Australia
Canberra Metro is a 12km public transport corridor from the Gungahlin Town Centre to the city centre. The rail infrastructure and associated landscaping is a feature of the gateway to the nation’s capital. The project includes 14 state-of-the-art light rail vehicles, with 13 boarding/disembarking stops designed for comfort and safety. The project also includes depot, road, signalling and preparatory works, plus the ongoing operation and maintenance of the light rail system. Responsibilities: Safe commissioning of the light rail electrical works Develop the Testing and Commissioning Plan and the Operations Electrical Management Plan, the framework for safe works around electrical assets Manage HV energisation, developing switching programs and executing HV switching for commissioning purposes. Also manage train authorised electrical operators to assist with the switching process, required daily to enable night-time commissioning of light rail vehicles Liaison with utility company Evo Energy (for initial energisation of substations) and substation vendor GE, plus review site acceptance testing Ensure all testing conducted with the SCADA vendor Tehnika to enable the use of operator consoles for the commissioning stage. Support the implementation of the project Quality management system including NCR management, Worklot structure development and defect coordination. Client interaction and liaison, stakeholder management such as the independent verifier and the regulator resulting in auditing / inspections, continuous improvement on quality and commissioning systems.

Pre-Commissioning / Completions Manager - Sydney Desalination Plant Rebuild Project
Sydney, Australia
The Sydney Desalination Plant was hit by cyclonic conditions in December 2015, causing large-scale damage to the facility. The 132 Switchyard was totally destroyed, the roof of the RO building was completely blown away and other defects occurred as a result of the storm. There were over 25,000 defect items that required to be closed out and managed in readiness for re-commissioning. Responsibilities: Writing and executing the Pre-commissioning Management Plan and the QA systems for pre-commissioning Safe, timely and cost-effective building and pre-commissioning of electrical and instrumentation equipment Managing $4M worth of electrical contracts varying from HV to LV to instrumentation. Development of QA/Pre-commissioning software to track and manage electrical and mechanical quality documents and check sheets.

Commissioning Manager - Sundrop Farms
Port Augusta - South Australia
This project consists of three main sections: Greenhouses and utilities, energy plant, and balance of plant (interface between the greenhouses and energy plant). The energy plant consisted of a heliostat field of 24.000+ individually controlled mirrors and a 115m-high solar tower which contains the flux receiver from the heliostat field. This tower produces steam, which is converted through a condenser to hot water. The hot water is stored in a thermal energy storage tank (22ML) and is used for both heating the greenhouse as well as an energy source to produce fresh water from sea water. Responsibilities: Safe, timely and cost-effective commissioning of the Sundrop Farms renewable energy project Ensure compliance with the SA work safe requirements for testing of the solar boiler Manage Dutch and Danish subcontractor's commissioning activities. Assist subcontractors with their development of QA documentation in line with contract expectations. Self-perform commissioning activities on the balance of plant. See Facebook page for more information: https://www.facebook.com/pages/Sundrop-Farms/150494351697748

First Production Commissioning Team Leader
Fairview - Queensland
The pipeline includes a 4.3km under-sea tunnel from the mainland to Curtis Island, 36,000 segments of pipe, seven pipeline storage areas, four camps in the Arcadia Valley, Fairview field, Bauhinia and Kilburnie, one primary contractor and over 50 subcontractors; along with individual land access agreements with 120 landholders for 142 properties. The pipeline transports up to 40 million cubic metres of gas a day from the project's gas fields to its liquefaction plant on Curtis Island off Gladstone. Responsibilities: Safe, timely and cost-effective completion of the commissioning and handover to operations of the last of the 270 EPC wells as well as a new portion of scope in Fairview and Roma including 11 well leases consisting of 74 wells Pre-commissioning and commissioning of the coal seam gas wells and gathering pipelines Development of commissioning test plans, progress planning, testing of electrical equipment and switchboards Testing instrumentation and control systems. Support the implementation of the project Quality management system including NCR management, Worklot structure development and defect coordination

Start-Up Commissioning Area Lead - GTA & GTC
Fairview, Queensland
Accountable for the safe, timely and cost effective completion of 9 x Siemens SGT400 11kV/12MW Gas Turbine Alternators (GTA) and 7 x Siemens SGT400 80TJ/d Gas turbine Compressors (GTC) on 3 gas processing plants, 2 plants at Fairview and 1 plant at Roma. General commissioning tasks for the systematic testing & commissioning for both the GTA and GTC’s were, preliminairy checks of the turbines, alternators and compressor wiring, testing and energisation of the battery chargers, testing and commissioning of all Siemens instrumentation and control systems (Alan Bradley PLC and Wonderware HMI Scada system) including DCS interface through Modbus, Cause and Effect and sequence testing of all turbine systems such as Fire & Gas detection system, Oil system, Vibration Monitoring system, Ventilation System, Fuel Gas, Instrument Air, Core Ramp controller, Hydraulic Starter motor and pump, testing and commissioning of all electrical drives as well as electrical sundries such as air conditioning, heat tracing and lighting. The control for all equipment on site is managed from the Plant Control Centre (PCC) in Brisbane, we have started all of this equipment from Brisbane. Responsibilities for this role consisted of; Management of Vendor personnel which consisted of a Site leader, 3 x senior commissioning engineers, 3 x assistant commissioning engineers, 1 x mechanical technician, 1 x compressor specialist, 1 x compressor engineer and 1 x HV alternator specialist. Management and Coordination of Santos personnel which includes mechanical rotating equipment engineers, instrumentation technicians, electricians, punch list coordinators and administrators. Coordinate start up activities at the time of introduction of energy such are electrical power and introduction of gas, this includes NOE & Ready for Start Up (RFSU) safety reviews. The compressor stations in Fairview are all exporting gas, and are running reliably since forward flow of gas was achieved.

Commissioning Site Leader
Fairview - Queensland
As part of the Santos GLNG project I'm part of the Santos commissioning team looking after the upstream component of the project. This project is located in Fairview, about 2 hours drive from Roma in Queensland. We are commissioning a gas hub, which is gas compression facility taking gas from the coal seam wells and then compresses the gas to such pressure to pump it to the main pipeline to Gladstone where the gas is turned into LNG. Commissioning activities are related to HV reticulation (33kV & 11kV), LV power, various types of compressors (Nodel and Turbine type), power generation, utilities, water treatment, control systems, instrumentation & piping systems. At peak I will be looking after 40 combined staff and workforce, this includes positions such as mechanical specialists, instrument & electrical (LV & HV) specialists, admin, safety advisors, commissioning technicians (Mechanical and E/I), commissioning management system specialists and commissioing coordinators.

Completions Manager
Airport Link - Kedron Central
Part of the MEFT (Mechanical / Electrical Fit out of Tunnels) team at Airport Link, Brisbane. This project as a whole is Australia's largest infrastructure project. Responsible for the completion of the M&E fit-out of the central area of the project. This included the installation of Lighting, CCTV, signage, electrical switch rooms, communication systems, dampers, jet fans ect. I was looking after 2 electrical engineers, 4 electrical supervisors, 1 safety advisor and 80 blue collar laubour force consisting of electricians, TA's and storeman.

Completions/Precommissioning Manager
Devil Creek, WA
Responsible for the handover of systems to the client as stipulated in the program. This included the pre-commissioning process for piping, mechanical, electrical and instrumentation. The resposibilities for the precommissioning work was managing a team of about 15 engineers and 13 superintendents & supervisors as well as admin staff. Managing a hydrotesting contractor for the entire hydro test scope on the project as well as specialised pre-commissioning activities such as lube oil flushing. Managing electrical and instrumentation pre-commissioning, which included cold loop checks, cable checks, instrument calibrations, motor bump tests and Hazardous area inspections. This project was delivered to completion is such manner the client was able to conduct their commissioning processes in parralel such as nitrogen/helium leak testing. Enabling them to maintain their program commitments. This project was delivered on time and on budget. Devil Creek was officially opened on February 24, 2012.

E/I Superintendent
Melbourne, VIC / Lytton, QLD
Caltex - DHTU2 project (Diesel Clean Fuels) As Lead Designer and EPCM Instrument Superintendent. Responsible for the design, excecution of the construction and commissioning of the instrumentation component. Responsibilities in the office were: Building close relation ships with the client Caltex. Produce all required deliverables, such as loop diagrams, layouts, use of 3D model (PDMS) hazardous area dossier, tubing hook-up drawings, termination diagrams. Responsibilities on site were: Managing the construction contractor Broedspectrum with respect to excecution and QA. Auditing hazardous area installation. Assist with pre-commissioning and assist with day to day challenges relating to the excecution of the work. 1 year in office and one year on site.

Lead Instrument Designer / EPCM Supervisor
Melbourne / Geelong Refinery
1999 - 2001 CSBP, Perth, WA. As Instrument Designer 2001 - 2003 Basell LIPP Project, Geelong, VIC. As Instrument designer and site EPCM supervisor. 2003 - 2005 Basell Extruder Expansion project, Geelong VIC. As Lead Instrument Designer and EPCM Supervisor. 2005 - 2007 Basell Expansion project, Geelong VIC. As Lead instrument designer and EPCM Supervisor.

Electrical / Instrument Designer
David E Price & Associates
South Yarra
David E Price & Associates was a small electrical/Instrument consultancy firm. I was employed as an electrical/Instrument designer. David E Price was a company consiting of about 10-12 staff, specialised in electrical/instrumentation in the oil and gas, paper and chemical industries. I worked for clients such as Shell, Mobil, Amcor, Visy Paper, Borden Chemicals. Activities were drafting all aspects of electrical and instrument systems, such as schematics, P&IDs, Loop Drawings, layouts etc. also programming large PLC systems, with experience in brands such as Allen Bradley, Siemens, Modicon, Omron. I also programmed and commissioned Scada systems such as Wonderware, Citect, AB Panelview and Intelution. David E Price Ceased business in November 1998. It was bought out by Maunsell McIntire.
Stefan Hulsbosch's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.