
shih-hong Chang
Commissioning Engineer @ ORGANO CORPORATION
-
United States
Industrial Automation
Construction Supervision, Electrical and Instrumentation Engineering (EIE), FAT, Remote Desktop Protocol (RDP), Windows Server Security Troubleshooting, Legacy System Integration, Remote Access Debugging, Site Commissioning, Enhancing PM with GenAI, Artificial Intelligence (AI), AI Productivity, Project Performance, Importance of Data Quality, Generative AI Tools, Generative AI Applications, Project Progress Tracking, Schedule Estimation, Risk Management, Vendor Coordination, Stakeholder Engagement
Experience

Commissioning Engineer
美國
1. Coordinate multi-site project execution, supporting system integration, commissioning, and client communication to ensure smooth delivery 2. Participate in FAT (Factory Acceptance Test), SAT (Site Acceptance Test), and system validation, performing loop checks, functional testing, and troubleshooting to ensure operational readiness of control and water treatment systems 3. Collaborate with cross-functional teams, vendors, and clients through regular meetings to track progress and ensure alignment of project requirements and technical deliverables 4. Monitor SCADA/BMS system operation, analyze data, and prepare technical reports to support commissioning and project handover 5. Conduct quality control (QC) inspections at UPW tank fabrication sites to ensure processes and materials meet international standards and project specifications, and validate installation positions to enhance system reliability

I&C Construction Supervisor
Taiwan, Taiwan
● Took overall responsibility for I&C construction and commissioning coordination, including on-site manpower planning, subcontractor management, and interface alignment across multiple work packages ● Led system integration and commissioning of 600+ FFUs into BMS / SCADA platforms, covering loop checks, functional testing, alarm validation, and operational readiness verification ● Planned and controlled construction and commissioning activities using PERT-based schedule analysis, supporting milestone tracking, interface coordination, and timely handover ● Established and maintained a structured Punch List and deficiency management process, ensuring transparent tracking, prioritization, and closure across instrumentation, control, and monitoring systems ● Applied PMP-aligned risk management and mitigation planning, translating technical and interface risks into actionable controls for commissioning readiness and schedule reliability ● Executed end-to-end system integration from field instrumentation and control networks to SCADA systems, ensuring stable communication, consistent control logic, and data integrity ● Implemented SCADA system enhancements including alarm voice notification logic and Auto Logon / Keep Alive mechanisms, improving commissioning efficiency, system availability, and long-term operational stability ● Coordinated closely with clients, vendors, and subcontractors during commissioning, troubleshooting, and handover phases, supporting client acceptance testing and final system approval

System Engineer | Subject matter expert (cRSP)
台灣 臺北市 南港區
Build and configure MMI (Man–Machine Interface) central HVAC monitoring software and network communication systems on-site, including PC, server, HUB, MOXA NPort configuration, and related peripherals. Design MMI graphical user interfaces (GUI) according to project requirements, discuss user experience improvements with clients, and refine UI design based on their feedback. Install, test, and commission company EV chargers on-site, and develop solutions using various protocols to enable card authorization and additional charging functions. Perform DSC remote/on-site system maintenance and troubleshoot technical issues encountered by customers. Manage project schedules, conduct toolbox meetings to promote safety awareness, and supervise contractors to ensure on-site safety compliance and reporting. Train new employees on software/hardware installation, system testing, equipment operation, and proper selection and fabrication of wiring and materials. Participate in technical meetings with overseas engineers via Teams to exchange updated technologies and receive training. Utilize network command tools such as CMD, Telnet, PowerShell, and PuTTY to test, diagnose, and configure network parameters. Work with DDC controllers, including I/O setup and programming development. Perform remote device setup, including burn-in testing, firmware configuration, IP setting, protocol configuration, BOM creation, and conducting quotation inquiries. Generate central monitoring system inspection reports and produce visualized data analysis reports.

Electrical Control Engineer
台灣 臺中市 南屯區
Perform power cabling (high-voltage plug-in cable assemblies), low-voltage wiring, and network cable installation and fabrication. Plan and integrate automation electromechanical systems for production equipment. Select electrical and optical sensing components (reed switches, solenoid valves, fiber optic amplifiers, relays, CCDs), perform machine wiring, and conduct equipment tuning and test runs. Develop PLC programs (Siemens, Omron) and design HMI interfaces. Manage project execution, including procurement inquiries, quotation preparation, subcontracting, and other assigned tasks. Conduct PCB soldering operations (SMT), using multimeters, power supplies, signal generators, soldering irons, auto-soldering machines, hot air guns, and perform analysis and calibration of functional boards. Create electrical control cabinet drawings using AutoCAD, design industrial panels and wiring for production machines, and perform equipment troubleshooting, testing, and tuning. Develop and maintain BOM lists, I/O tables, and perform system simulation using Factory I/O. Operate various power tools for equipment fabrication (drilling, tapping, cutting, punching) and perform workpiece chamfering. Utilize NI LabVIEW, NI MAX, CCD systems, and configure Modbus communication. Perform basic computer-to-machine configuration, command execution, and equipment parameter setup. Actively share knowledge, collaborate with teammates, and mentor new employees. Conduct relay testing for proprietary know-how products, adjusting A/C pins and coil parameters using LabVIEW programming to achieve high yield rates.

Communications Engineer
華新儀錶股份有限公司
台灣 新北市 五股區
1、執行其他分派專案。 2、開工程車於戶外、室內debug及更新韌體或依現場狀況判斷給予合適的處置方式。 修改頻率及選用適合的天線來改善低壓無線模組數位信號、頻率並記錄。 3、通訊連網查測。 4、使用儀器工具分析現場通訊信號不良原因並解決改善問題。 5、執行案場勘查、量測評估、進度時程規劃管理,製作資料並彙整行政文件資料。 6、檢查廠商施工前的準備工作,依據施工狀況向分包廠商、設計單位協商溝通。 7、工程驗收前試車檢驗。 8、駐點:(花蓮)北部地區(雙北、桃、竹)出差
shih-hong Chang's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

