
Sherif Selim ,M.Eng ,PMP, CLAC, LEED GA
MEP Section Head @ Saudi Binladin Group (SBG)
About
With over 13 years of experience in MEP project development and construction management, I currently serve as MEP Section Head at Saudi Binladin Group, overseeing manpower, schedules, and costs while ensuring seamless collaboration with planning, procurement, and engineering teams. I also review designs and manage design teams, ensuring technical accuracy, compliance, and integration with project requirements. I maintain a strong focus on safety, quality, and regulatory compliance, supporting phased project handovers and MEP system commissioning with precision and efficiency. I hold an M.Eng. in Sustainability, with a thesis on “State-of-Art Technology of Energy Efficiency Measures in Buildings”, highlighting my expertise in implementing energy-efficient and sustainable solutions in construction projects. I am also a PMP® certified professional with advanced skills in AutoCAD and Microsoft Office. I have successfully contributed to large-scale hospitality, residential, healthcare, utilities and infrastructure projects, aligning technical solutions with operational objectives. My approach emphasizes structured leadership, cross-functional teamwork, and operational excellence, delivering results in complex construction environments
-
Saudi Arabia
Construction
Engineering, Microsoft Office, AutoCAD, Mechanical Engineering, Project Engineering, HVAC, Pumps, Project Management, CAD, Construction
Experience

MEP Section Head
Saudi Arabia
Manage manpower, schedule, and cost. Attend site meetings and resolve technical issues. Coordinate with planning, procurement, and engineering teams. Maintain compliance with safety, quality, and regulations. Supported MEP commissioning and testing activities in line with phased logistics schedules and project handovers, ensuring system readiness and seamless integration with operational workflows.

Site Manager -Movenpick Sharm Elsheikh Hotel
Sharm El Sheikh, South Sinai, Egypt
Managed MEP teams, subcontractors, and consultants (Hill International). Oversaw civil, MEP, infrastructure, Utilities and finishing works. Reviewed cash flow, budget, invoices and reports. Controlled resources, progress, and project documentation. Coordinated testing and commissioning of MEP systems with hotel logistics and phased renovation schedules, minimizing disruption to operations during partial occupancy.

MEP Site Manager -Renovation of Mena House Hotel (JW Marriott)
Cairo, Egypt
Oversaw full project lifecycle: scheduling, budgeting, coordination. Led MEP team, subcontractor management, and issue resolution. Ensured on-time delivery with quality standards. Reviewing all VOs with technical and contractor teams. Managed complex MEP-logistics interfaces during phased renovation works by aligning utilities coordination with site access, deliveries, and operational sequences.

Project TeamLeader
Cairo, Egypt
Coordinate with planning, procurement, site team and engineering teams. Coordinated with ECG consultants and client. Conduct and led coordination meetings. Monitor project Progress, Manage risks. Reviewing all VOs with technical and contractor teams. Monitored expenditures and implemented cost-saving strategies to ensure adherence to budget constraints."

MEP Site TeamLeader - Kasr El Ainy Hospital (Obstetrics and Gynecology Hospital) Cairo University
Cairo, Egypt
Executed HVAC, plumbing, firefighting, electrical and infrastructure works. Supervised MV/LV installations, Supervised site inspections and coordinated with consultants. Managed invoices, and as-built documentation. Coordinate with planning, procurement, and engineering teams. Maintain compliance with safety, quality, and regulations.

Senior Mechanical site engineer - Dorat El Karaz Residential Compound
Egypt
Managing the site work and erection according to the priority of work in the contract schedule. -Installing, commissioning, and start-up for the VRV system and chilled water system (chiller ,FCU,AHU,Piping work.,Duct work.....etc). -Installing for fire fighting system. - Installing for drainage system including(below ground network& high level works) -installing for domestic cold water system. -installing for Irrigation system -installing for Fountains. -installing for Elevators -Supervision and follow up Duct work sub-contractor work and progress to meet project schedule. -Attend site inspections with the QC and consultants for work handing over. -Making for As-built drawing in order to handling over for the work done. -Resources control (Manpower & Tools) to meet the installation rates during the project phases. -Material control and issuing the complementary orders. -Supervising that my team is following safety instructions and regulation. Education Preparing progress reports (weekly and monthly reports), External work package managing, Quantity survey, , Revising sub-contractors shop drawings, Coordination between site and consultant, Preparing As built drawings following CAD standards, Preparing meeting Agenda and minutes of meeting, Study and prepare RFI’s, Preparing technical and material submittals, Coordination between All MEP Branches , Reviewing subcontractor’s invoices, supervise drafter’s activities and prepare all material orders Also Supervise And responsible for all mechanical installations at site (HVAC,Fire,Plumbing,Fountain,Irrigations)

Mechanical Site Engineer -Air Force General Hospital
Cairo Governorate, Egypt
-Installing, commissioning, and start-up for the VRV system and chilled water system (chiller ,FCU,AHU,Piping work.,Duct work.....etc). -Installing for fire fighting system. - Installing for drainage system including(below ground network& high level works) -installing for domestic cold water system. -installing for Irrigation system -installing for Fountains. -installing for Elevators Also Preparing shop drawings and sketches, Preparing progress reports (weekly and monthly reports), External work package managing, Quantity survey, , Revising sub-contractors shop drawings, Coordination between site and consultant, Preparing As built drawings following CAD standards, Preparing meeting Agenda and minutes of meeting, Study and prepare RFI’s, Preparing technical and material submittals, Coordination between All MEP Branches , Reviewing subcontractor’s invoices, supervise drafter’s activities and prepare all material orders Also Supervise And responsible for all mechanical installations at site (HVAC,Fire,Plumbing,Fountain,Irrigations)

Business Development Engineer
مصر
Participated in client meetings and delivered technical presentations to support project approvals. Prepared and reviewed technical submittals, ensuring alignment with project specifications and supervised on-site execution. Supported project development by assessing client requirements and contributing to the preparation of detailed technical proposals. Collaborated with sales and engineering teams during the pre-award phase to align technical solutions with project goals.

Mechanical Design Engineer
Hydro Consult Electromechanical consultancy office.
Designed HVAC, Plumbing and firefighting systems for various residential, commercial, and industrial projects across Egypt and Saudi Arabia. Supervised site implementation of mechanical systems. Review material submittals and shop drawing.
Sherif Selim ,M.Eng ,PMP, CLAC, LEED GA's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


