Seungmin Lee
Business Development Manager @ Aesen
About
Business Development Manager, experienced in Project Management / Engineering Management / Mechanical System Design, Analysis, and Optimization / T&I Engineering and Supervision of Sub-structure and Topside in Oil & Gas Project / Offshore Wind Turbine Structure Design, Analysis, and Optimization. Key expertise : - Integrated load analysis of OWT (Offshore Wind Turbine) system - Concept and optimized design of OWT TP (Transition Piece) - Structural analysis of OWT TP and Mechanical System - Lifting analysis for Oil & Gas Topside Platform - Mooring Analysis for Sub-structure & Topside Installation - Naval architectural calculations of hydrostatics, stability, loading conditions, allowable VCG Capable tools : - MS Project for Project Schedule Management - WindPRO for Wind Resource Assessment and Optimization of Wind Farm Layout - GH bladed for OWT load calculation & post-processing - ABAQUS/Hyperworks Hypermesh for strength analysis - Hyperworks Opti-struct for structural optimization - SACS for lifting analysis - MOSES/OrcaFlex/Opti-Moor/G-Moor for mooring analysis - NAPA for Naval architectural calculations - Catia V6/Auto CAD for mechanical system design Other experiences : - Completed military service as Auxiliary Police at Mobile Police Force Division - Resided in Canada for 5 months for learning English and experiencing Canadian culture via Homestay - Prize for the excellence of the studies by Chungnam National University - A member of NCS (National Competency Standards) Developer for Offshore Structure Design - Contribution Employee to install an offshore structure in NASR project by HHI
South Korea
Seoul
Information Technology & Services
사업전략, 교육, 인력 개발, 해상 작업, 구조설계, 구조분석, 제품개발, 파이프라인, 공학관리, 설계공학, 구조공학, 오토캐드, 사업개발, 캐드, 풍력 에너지, 엔지니어링, R&D, 기계공학, 기술 보고서, 터빈
Experience

Business Development Manager
Business Development in Offshore Wind, Oil&Gas, Infrastructure Industry ; (1) Crew Mobility Solutions - CTV (Crew Transfer Vessel) - SATV (Service Accommodaton and Transfer Vessel) - SOV (Service Operation Vessel) (2) Integrated Logistics Solutions - Engineering & Consultancy - Vessel Chartering - Turnkey Transportation - Cable Transportation & Storage - Complementary Services (3) Offshore Support Solutions - Subsea Services - Construction & Production Support

Business Development Manager
Seoul, South Korea
Business Development in Onshore/Offshore Wind and Hydrogen Industry ; (1) Project/Design/Type Certificate (2) QAQC (3) Owners Engineering (4) APQP4 Wind Management/Specialist Project Management in Onshore/Offshore Wind Industry ; (1) [AWC] Anma Offshore Wind Farm QAQC PJ (Aug. 2024 - Sep. 2025) (2) [Taihan] Dynamic Cable Type Certificate PJ (Feb. 2025 - Sep. 2025) APQP4 Wind Training in Onshore/Offshore Wind Industry ; (1) [Hyundai Steel & HSG Sungdong] APQP4 Wind Specialist (July. 2025)

Project Manager
Seoul, South Korea
Project Management in Offshore Wind Farm PJ ; (1) [KREDO] Shinan Blue Offshore Wind Farm Concept Design PJ (Dec. 2023 - Feb. 2024) (2) [AWC] Anma Offshore Wind Farm Concept & FEED Design PJ (Jan. 2023 - Feb. 2024) (3) [KEPCO] Shinan Offshore Wind Farm OSS Topside Concept Design PJ (Mar. 2023 - Jun. 2023) Business Development Assistant and T&I (Transportation and Installation) engineering-related consultants in the offshore wind industry.

Engineering Manager
Review the technical availability and feasibility of new pipelines of Offshore Wind Farm in Korea. Develop the Shinan-Ui project (400MW) and involve in essential technical tasks as below ; (1) Reviewing all of the technical parts in Siemens Gamesa Turbine (2) Writing up a technical report of PCC (Project Climate Condition) (3) Managing marine operation of investigating soil condition (4) Exploring and analyzing an adequate marshaling port near the Shinan-Ui project site (5) Finding and managing the promising substructure fabrication companies (6) Making a preliminary offshore construction plan of installing pre-piles (7) Verifying the feasibility of the planned construction schedule via construction simulation SW (8) Managing T&I companies to set up an effective T&I strategy for the Shinan-Ui project Develop Bo-Ryeong project and was involved in essential technical tasks as below ; (1) Inspected the manufacturing process of the Met-Mast structure (2) Reviewed all relevant T&I engineering reports (3) Supervised whether T&I work proceeds properly through the construction site survey Wrote down and presented many kinds of technical-commercial reports as below ; (1) Analyzing the availability and feasibility of the application of the suction bucket type (2) Studying LCOE variation trend in Europe offshore wind market (3) Searching and listing all supply chains throughout all offshore wind farm development stages (4) Studying main policies (RE100, PPA, RPS, etc.) in developing an offshore wind farm (5) Studying the specific construction methods of installing a turbine and substructures (6) Searching for a detailed pre-piling method to identify the possibility of installing pre-piles (7) Reporting an updated technology trend analysis of floating and fixed offshore wind system

Engineering Manager
Managed supply chains in Germany and Australia to maintain a manufacturing schedule for an infantry fighting vehicle called REDBACK and communicated with them very proficiently to meet the project milestone in a certain way. Involved in the 6 quantitative and qualitative projects as below ; (1) Designed AFSS (Automatic Fire Suppress System) for REDBACK (2) Designed draining pump system mounted in the engine room for REDBACK (3) Designed gun standing system equipped in the main room for REDBACK (4) Designed CBRN (Chemical/Bio/Radiate/Nuclear) sensor system for REDBACK (5) Designed a periscope system mounted on the vehicle for REDBACK (6) Designed MCS (Mobile Camouflage System) fitted on the vehicle for REDBACK

Mechanical System Engineer
Designed an optimized tube system for use on the missile launcher system called L-SAM (Longitude Surface to Air Missile launcher system). Designed an automatic temperature control system that helps maintain its adequate temperature, which supports a missile firing for stable flying performance up to long-distance targets.

Transportation and Installation Engineer
Completed T&I (Transportation and Installation) Engineering and Supervision Work of various weight offshore structures very successfully by operating HLV (Heavy Lift Vessel) like HD-10000, HD-2500, and HD-1000. Involved in the seven quantitative and qualitative projects as below ; (1) Moho Nord TLP T&I Project (Company: TOTAL, MWS: LOC) (2) QUAD 204 FPSO T&I Project (Company: BP, MWS: LOC) (3) Moho Nord FPU T&I Project (Company: TOTAL, MWS: LOC) (4) BERGADING T&I Project (Company: HESS, MWS: ABL) (5) AASTA HANSTEEN T&I Project (Company: STATOIL, MWS: DNV) (6) BARONIA T&I Project (Company: PETRONAS, MWS: ABL) (7) NASR T&I Project (Company: ADMA, MWS: Global Maritime)
Seungmin Lee's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




