
Ragul Devaraju
Quality Engineer @ Tesla
About
As a Quality Engineer at Tesla, I contribute to enhancing manufacturing processes by leveraging expertise in motion study, line balancing, and takt time analysis. Previous roles at Tesla, including Vendor Manufacturing Engineer and Supplier Industrialization Engineer, have strengthened my understanding of supplier coordination and manufacturing optimization. With a Master's in Industrial Engineering from The University of Texas at Arlington and certifications in Six Sigma Green Belt and Industrial Automation, I am committed to continuous improvement. My motivation lies in optimizing processes through data-driven decision-making and collaboration with cross-functional teams.
United States
Austin
Automotive
Creo, CATIA, AutoCAD, Mechanical Engineering, Project Management, Manufacturing, Process Engineering, Quality Control, Process Automation, Siemens NX, SolidWorks, Microsoft Office, Management, Manufacturing Processes, Assembly Processes, Capacity Development, Microsoft PowerPoint, Industry 4.0, Root Cause Analysis, Failure Mode and Effects Analysis (FMEA)
Experience

Process Engineer
Bangalore
• Created a document tree/bill of material using Excel to document product specification and process documents used in production line, which resulted in saving about 2 hours during new production operator training. • Active quality assurance team member, where the team ensures production process to be flawless from defects during the NPI Process. • Involved in APQP (Advanced Product Quality Planning) process as a cross-functional team, planning to ensure quality product will be manufactured. Completed 3 projects and were successfully launched meeting customer expectations. • Responsible for ECN and DCN documents, where any changes in production process were documented. This helped production line to follow revised product requirement, reducing product waste and production time.

Graduate Engineering Trainee
Chennai, Tamil Nadu, India
• Modified manufacturing process, which fulfilled the new forecasted customer demand. (Capacity Enhancement). • Implemented Lean concepts which restructured manufacturing time, allowing to improve efficiency and minimize lead time. • Budgeted for cost reduction projects by reevaluating the existing balanced line. • Estimated and assessed manufacturing facility to incorporate new business products. • Utilized cost effective techniques to implement Kanban system which increased productivity by 10%. • Developed knowledge about Six-Sigma tools which was useful for implementing quality aspects, a systematic approach in problem-solving. • Engineered traceability projects involving PLC program and system to improve product traceability.
Ragul Devaraju's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.






