Pablo Álvarez
Director of Operations - Consulting & Technical Advisory Division @ OCA GLOBAL
About
More than 18 years of experience participating in all stages of development of engineering projects, from the feasibility study and basic design to the contract negotiation, execution and project management. Experienced in international turn-key projects of different kind of power plants for the most demanding customers, implementing their specific requirements for each one as well as all the applicable country regulations. A seasoned business-oriented professional with a strong technical background and deep management insights.
Spain
Greater Madrid Metropolitan Area
Oil & Energy
Communication, Project Coordination, Budget Management, Human Resources (HR), Operations Management, Consulting, Gestión de proyectos, Business Development, Contract Management, Project Management, Negotiation, Procurement, Cost control, Lean manufacturing, Manufacturing, Renewable Energy, HVAC, Ingeniería, Engineering, Negociación de contratos
Experience

Director of Operations - Consulting & Technical Advisory Division
Madrid y alrededores
Main responsible of the Consulting and Engineering Division, providing Technical Assistance for Renewable Energy Projects worldwide. Ensuring successful, efficient and profitable company operations focused on the following areas: - Operations: planning and organization, project and resource requirements, budget and timescales estimation, financial and cost control, purchasing and subcontractors. Monitoring of all relevant outputs through P&Ls. - Business analytics: developing and monitoring business KPIs, guaranteeing an effective decision-making. - Productivity: using and developing own SAP-based tools to monitor the productivity of the assigned resources, to achieve the projects’ completion effectively and on time.

Global Manager - International Projects Business Line
Barcelona Area, Spain
In charge of the International Projects Department, offering global testing, inspection, QA/QC services. Main contracts awarded for these services: • 2020: Sheikh Mohammed Bin Zayed Solar PV Plant 20 + 30 MW (Togo). • 2019/2020: San Pedro I y IV Solar PV Plant 100 MW (Chile). • 2019/2020: Mohammed bin Rashid Al Maktoum Solar PV Plant - DEWA Phase III 800 MW Plot C 300MW (UAE). • 2019/2020: Zeerust/DeWildt Solar PV Plants 87 + 50 MW (South Africa) • 2019: Wind Float Atlantic – Floating Wind Farm Platforms (Portugal). • 2019: Renaissance Combined Cycle Power Plant 190 MW (Jamaica). • 2019: Don Diego Solar PV Plant 168MW (Mexico). • 2018/2019: Kilpilahti Combined Heat and Power Plant 40 MWe/600 ton/hr (Finland). • 2018/2019: Mula Solar PV Plant 493 MW (Spain). • 2018: Guimarania I & II Solar PV Plant 82 MW (Brazil). • 2018: Pima/Rumososa PV Plants 144 + 54 MW (Mexico). • 2018: Lilyvale Solar PV Plant 100 MW (Australia).

Project Manager
Bilbao y alrededores, España
• 2018: Wind Division Engineering Department. • 2017: Altamira Combined Heat and Power Project (70 MWe/77 ton/hr). Procurement and Project Management for Mechanical systems (Mexico). • 2017: Bajio Combined Heat and Power Project (55 MWe/63 ton/hr). Procurement and Project Management for Mechanical systems (Mexico).

Technical Manager
NCR - National Capital Region, Philippines
As main representative of Grupo Tamoin in the Philippines, in charge of the development of the subsidiary in South East Asia. With key responsibilities in: • Company Policies and Procedures, Project and Company cost control procedures, Technical Guidelines and Core Objectives. • Business Development, focused on the Construction Project Management (CPM) and Engineering Consultancy Services (ECS) for local Power Plant projects. Contracts awarded: o 2015/2016: 100 MW Solar PV and 50 MW Wind. Project Development and CPM for Solar Field, Substation and Transmission Line. o 2015: 50 MW Solar PV. Transmission Line Project Development. o 2015: 270 MW Geothermal (1st stage of 35 MW). Project Development and Technical due diligence for technology providers. o 2014/2015: 40 MW Geothermal. Project Development and CPM for the drilling wellpads. Technical and Financial due diligence for the technology providers for Power Plant and Substation and Transmission Line. o 2014/2016: 11 MW Diesel-Fuel Oil. Engineering Procurement and Construction Management (EPCm) for Power Plant and Substation and Transmission Line. o 2014/2015: Pre-Feasibility studies for 300 MW Coal Fired, 25 MW Hybrid Solar PV-Fuel Oil. • Team build-up, coordination, and personnel task assignment for the above-mentioned projects, once awarded.

Project Manager
Bilbao y alrededores, España
Management of all phases of the project, from tender drafting to contract negotiation, including design and calculation of installations, purchasing and production control, erection and commissioning & start-up. Outstanding projects: • 2013: Margarita II – CPF (Bolivia). Project Manager for trenches and electrical rooms installations (Bolivia). • 2013: Crescent Dunes 110 MW Thermosolar Power Plant. Project Manager for Supply of ventilation devices for salt tanks (United States). • 2013: Project Manager for Mechanical installations and HVAC for Khulna 150 MW Peaking Power Plant (Bangladesh). • 2012/2013: Project Manager for Mechanical installations and HVAC for Agua Prieta II 476 MW (464MW Combined Cycle/12MW Thermosolar) Hybrid Power Plant (Mexico). • 2012/2013: Project Manager for Chemical Storage Area installations in Montes del Plata Pulp Mill (Uruguay). • 2012/2013: Project Manager for Administrative and Auxiliary Buildings installations in Montes del Plata Pulp Mill (Uruguay). • 2011/2012: Project Manager Mechanical installations for San Esteban II 176 MW Hydroelectric Power Plant (Spain).

Project Engineer
Burgos, España
Drafting, construction management and legalization for electrical installations, air conditioning, heating and ventilation, plumbing and drainage, fire protection, compressed air, thermal and photovoltaic solar energy, cogeneration. Outstanding projects: • 2009/2010: Project and construction management of mechanical installations for Sumbitec hand tool manufacturing facilities in Burgos (Spain). • 2009: Technical project and construction management of mechanical installations for urban solid waste treatment facilities in Burgos (Spain). • 2008: Technical project and construction management of mechanical installations for retirement home in Burgos (Spain). • 2007: Technical project and construction management of mechanical installations for Atocha 16 Hotel in Madrid (Spain).
Pablo Álvarez's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




