Ono Rokhadhitomo

Ono Rokhadhitomo

Maintenance Manager

About

Working in dynamic environment with passionate and result oriented. Pursue challenging opportunity and being professional for : - Successfully generate preventive maintenance based on predictive and risk based inspection. - Expert on budgeting, engineering lead, site execution mechanically and electrically until system commisioning. - Increasing production line efficiencies and capacity by reducing waste. - Equipment modification and installation to increase capacity and efficiencies. - Log out, Tag out, Tray out (LOTOTO) for energy isolation safety equipment and maintenance implementation. - Delivered project plant expansion as per : a. Plant requirement and design specification. b. Total budget. c. Time schedule. d. Safety requirement and no major issues. - Bulk material handling equipment relocation, refabricating, and installation. - Maintenance for bulk material handling equipment, rotating equipment. - Develop capital expenditure for new project and project improvement. Specialties: Plant maintenance, CAD, Plant Layout Design, Bulk Material Handling Equipment Design, Pneumatic Conveyor Design, Project Management, Dust Collector Design, Boiler chain grate installation.

Country

Indonesia

City

Banten

Industry

Paper & Forest Products

Skill

Teamwork, Root Cause Analysis, Risk Analysis, Maintenance Planning, RCA, Mechanical Engineering, Resolving Issues, Reliability, Project Cost, Bid Processes, Interpersonal Skills, Analytical Skills, Supervisory Skills, Processing Equipment, Managing Project Budgets, Project Teams, Capital Management, Breakdown, Project Documentation, Master Schedule

Experience

PT. Etex Building Performance Indonesia

Maintenance Manager

PT. Etex Building Performance Indonesia

2025-2 - Present · 1 yr 8 mos

Indonesia

APP Group

Maintenance Manager

APP Group

LinkedIn
2022-9 - 2025-2 · 2 yrs 6 mos

Indonesia

Asia Chemical Industry

Assistant Engineering Manager

Asia Chemical Industry

LinkedIn
2021-8 - 2023-1 · 1 yr 6 mos

Indonesia

CV Radhi Tama Mulia

Project Manager

CV Radhi Tama Mulia

2015-6 - 2021-1 · 5 yrs 8 mos

Serang Area, Banten, Indonesia

Company provide some services such as : 1. Maintenance and service of plasterboard machine and equipment. 2. Design and fabrication of plant mechanical and electrical system related to the bulk material handling. 3. Design and Fabrication of the plant safety system. 4. Mechanical and electrical equipment and spare part supply. 5. Custom polyurethane and epoxy paint production for corrosion resistance paint application in plant building structures. 6. Fan Balancing and motor vibration analysis as per customer need. 7. Liaise with PT Festo Indonesia for basic mechanical and fastener training. 8. Liaise with PT AETS Indo Pasific for mechanical electrical audit for high rise building. 9. 3D design and shop drawing production for skateboard & bicycle speed track. 10. 3D design for shark fin & plug on surfing board considering speed, maneuvering and jumping style. My responsibility is to handle all task and execute in timely basis for customer satisfaction. Of course for tax report is another side job for monthly and yearly. Planning, design & estimation, presentation to customer, quotation, procurement, arrange manpower & permit to work, site supervision, commissioning & hand over, until invoicing is part of my activities.

PT Tetra Pak Stainless Equipment

Project Manager

PT Tetra Pak Stainless Equipment

2015-2 - 2015-5 · 4 mos

Greater Jakarta Area, Indonesia

- Project Management on Sanitary Piping and Stainless Steel Tank manufacturing. ( especially for food & baverage, painting company and pharmaceutical company ) - Budget controlling during execution. - Managing safety plan for preliminary project until commissioning. - Drawing review. - Document hand over and technical review.

Saint-Gobain

Mechanical Project Engineer

Saint-Gobain

LinkedIn
2013-8 - 2015-2 · 1 yr 7 mos

Cikande

working for final execution on site project for coordination of equipment installation. - Heat exchanger installation and supervision. - Unloading imported equipment as per safety standard - Coal boiler system installation and supervision, waste water treatment installation. - Supervise belt conveyor installation - Supervision on grinding mill foundation and equipment installation until commissioning. - Steam pipe supervision for installation - Manage all of installation based on safety standard. - Liaise with the Indonesian custom related import permit and equipment arrival.

PT Petrojaya Boral Plasterboard

Project Engineer

PT Petrojaya Boral Plasterboard

LinkedIn
2010-11 - 2013-7 · 2 yrs 9 mos

Cilegon ( Serang )

BUILDING PHASE -Prepare technical specification for entire building and utility such as area, pipeline route, height of building, shape of building, drainage position, lighting on each room and warehouse, and level of plate form for highest building. - Layout drawing for warehouse, production line, truck loading and forklift flow. - Make tender for building construction based on the technical specification. - Invite contractor to calculate and design plant building based on the layout drawing. - Inspect contractor working condition as per safety regulation. - Shop drawing check and approved for building construction based on contract design. - Prepare documentation related to the building for permit. - Civil and structure erection work monitoring in term of execution, safety and quality. EQUIPMENT PHASE - Prepare layout drawing for equipment installation. - Make process equipment flow ( PID ) and plant circulation. - Process Design each equipment such as roller conveyor, V plough conveyor, dust collector, pneumatic transfer, dryer, heat exchanger, compressor, chiller system, Claudius peter mill, hammer mill, ball mill, apron feeder, cyclone, dust collector, fan, blower. - Make general design and drawing for each equipment. - Make equipment specification based on the proses equipment flow. - Purchase and contact supplier for equipment order based on the specification. - Invite mechanical contractor to quot price based on the working list. - Supervise installation equipment on site. - Monitoring equipment installation in term of safety, quality and final result. - Permit preparation related to the importing equipment. MANAGEMENT - weekly report to the project engineering manager in term of safety, work progress. - Montly report to Technical steering committee. - Monthly budget report. COMMISIONING- - Dry commissioning for each equipment. - Make equipment will run well in term of process and quality.

PT Petrojaya Boral Plasterboard

Maintenance And Project Engineer

PT Petrojaya Boral Plasterboard

2009-7 - 2010-12 · 1 yr 6 mos

handling project restructure to increase production capacity in plasterboard plant. - Permit preparation for the equipment. - Machine relocation from other country. - Flow process design and drawing. - Refabrication of equipment related to the bulk material handling. - Machine Installation. - Document preparation for import equipment. - Unloading process for equipment. - Wet and dry commisionning. - Budget report weekly and monthly. - Local equipment design and purchasing. - Progress report.

PT Petrojaya Boral Plasterboard

Maintenance Engineer

PT Petrojaya Boral Plasterboard

2007-3 - 2009-6 · 2 yrs 4 mos

- Maintenance task for rotating equipment, and machine related to the bulk material handling. - Develop improvement to increase production capacity and cost reducing. - Log out tag out try out ( LOTOTO ) development and implementation. - Continuous improvement for plant equipment which is increasing machine reliability and production capacity. - Maintenance and improvement for forklift reliability. - Vibration analysis and equipment balancing for rotating equipment. - Improvement for dust collector performance, increasing filtering process. - Improvement pneumatic transfer system performance for bulk material transfer.

OSRAM

Production Line Leader

OSRAM

LinkedIn
2002-2 - 2004-9 · 2 yrs 8 mos

Production Line leader has responsibility to handle raw material, machines & equipment, process, finish good and operator. And reducing waste and increasing efficiencies is other parts of my job.

Education

University of Indonesia

University of Indonesia

LinkedIn

Mechanical Engineering (Energy Conversion)

2004 - 2006 · 2 yrs

Develope fabric ducting with local fabric for Air Conditioning System in the Department Store.

Ono Rokhadhitomo's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.