Neeraj Kumar
Production Manager @ ORIGAMI CELLULO PRIVATE LIMITED
About
Total experience - 7 years 6 month, paper industry.my previous company gain to knowledge ,5S activities ,Kaizen and suggestions activities,Single minutes exchange of Die,6 Big losses, Production and Productivity improvement, minimize the wastage,All manpower fully utilised,Time study,Cycle time Taktime,lead time, throughput time, bottle neck time,Line balancing,TPM, CAPA,Poka yoke ,7 QC tools,SAP ,Kanban traceability system,some audit , products audit and process Audit ,QMS IATF standard 16949-2016,ISO Standards 9001-2015,EHS,6 Big Losses, Timwood,3M, 3 G,4M, prapare the skill matrix card, training card,prepare the SOP /WI. lean manufacturing .etc.
India
Gurugram
Paper & Forest Products
ISO/TS 16949, Manufacturing Operations, Corrective Actions, Standard Work, Kanban, Root Cause Analysis, Product Quality, Manufacturing, Lean Manufacturing, Time Study, Good Manufacturing Practice (GMP), Failure Mode and Effects Analysis (FMEA), Standard Operating Procedure (SOP), Continuous Improvement, Assembly Lines, Knowledge of Tissue paper, and converting plant , Line Balancing, Sap, 5S
Experience

Senior Production Engineer
Greater Delhi Area
there are 5 type manufacturing in app bawal (Haryana )plant . product name - Napkin tissue Facial tissue toilets roll kitchen towel Bed roll multi fold and fully knowledge in paper properties, GSM variation, some checking cerateria ,And Customer Complaint not raising in fast running.and fulfilled Customer requirements.And fast Delivery on time.and etc.not mentioned here.

Assembly production Engineer
Manesar, Haryana, India
5s Activities,Poka yoke, Aware to Safety,Kaizen activities,OEE calculation,why -why analysis,7 QC tools,lean manufacturing,Fire knowledge,Skill Matrix Card,4 M change,DWM, manpower Handling,Daily Production Reports, Productivity improvement, 5 Core Tools, Cycle time,Taktime ,lead time, throughput time ,SAP Knowledge, Prepared the Document, Leyed process audit ,Dock audit,process Audit , products audit ,plant audit,On Job training,IATF 16949-2016,ISO 9001-2015, QMS,EHS, Line balancing etc.

Assembly Production supervisor
Bawal Rewari Haryana
5S Activities,Line balancing, lean manufacturing,production and Productivity improvement,minimize the wastage,time study, cycle time, Taktime,lead time , throughput time, bottle neck time,Poka yoke,Kaizen and suggestions activities,prapare the SOP And WI, Prepared the skills matrix card, knowledge of type of fire, Timwood,why- why analysis,root cause analysis,CAPA,Single minutes exchange of Die,SAP,And Kanban traceability system,leyar process Audit,TPM, ON job training,KPI, control Chart, 7 QC tools,FMEA,IATF 16949 - 2016, ISO 9001-2015,QMS,EHS etc.
Neeraj Kumar's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


