Nagendran Chelladurai
Project Field Engineer
About
I am a Project & Site Management professional with over 7 years of experience delivering large-scale automation and intralogistics systems across Malaysia, the United States, and Indonesia. My expertise lies in end-to-end project execution, including planning, procurement, installation, testing & commissioning (T&C), and final handover. I have led multiple ASRS, conveyor, and airport baggage handling system (BHS) projects, working closely with cross-functional teams, contractors, and clients to ensure successful delivery within timeline, budget, and compliance requirements with strong balance of technical engineering knowledge and on-site leadership,
Malaysia
Puchong
Logistics & Supply Chain
Multi-million Dollar Projects, Risk Assessment, Advanced Driver-Assistance Systems (ADAS), Project Scheduling, Root Cause Analysis, Standards Compliance, Technical Drawing, Planning & Scheduling, Auditing, Stakeholder Engagement, Customer Relationship Management (CRM), Operational Efficiency, Technical Compliance, Project Status Reporting, Automation, Coordination Of Projects, Stakeholder Management, Delivery Of Projects, Commissioning Management, Cross-Functional Team Building
Experience

Project Field Engineer
Ho Lao Logistics Automation Sdn. Bhd.
Subang Jaya, Selangor, Malaysia

Site Manager
Ho Lao Logistics Automation Sdn. Bhd.
Subang Jaya, Selangor, Malaysia
• Led end-to-end site execution for ASRS, VLM, and conveyor automation projects, ensuring full alignment across design, manufacturing, and procurement to improve site readiness and reduce installation delays. • Managed detailed installation and commissioning schedules, consistently delivering milestones on or ahead of plan while maintaining quality and safety standards. • Supervised daily site operations, tracking progress, cost, and quality KPIs to streamline workflows and minimize rework. • Ensured compliance with ISO, OSHA, and site safety regulations, maintaining zero major safety incidents across multiple sites. • Oversaw mechanical and electrical installation of ASRS cranes, shuttles, VLMs, and conveyor systems according to engineering specifications. • Led system testing, troubleshooting, and debugging, contributing to successful commissioning and client-approved handovers. • Coordinated closely with automation teams to integrate PLC, HMI, and SCADA systems for seamless connectivity and operational readiness. • Acted as primary on-site liaison for clients, contractors, and internal teams, ensuring clear communication, timely issue escalation, and stakeholder alignment. • Interpreted technical drawings and layout plans to guide installation teams, reducing errors and improving installation accuracy. • Resolved on-site technical issues quickly to minimize downtime and protect project timelines. • Performed quality inspections during and after installation, ensuring systems met performance and commissioning standards. • Enforced safety protocols and conducted risk assessments to support a strong safety culture and regulatory compliance. • Maintained complete site documentation, including reports, inspection records, checklists, and handover files for full audit readiness. • Provided regular progress updates to project managers and stakeholders for informed decision-making.

Site Project Manager
Ho Lao Logistic Automation Sdn Bhd
Lead end-to-end site execution for ASRS and conveyor automation projects, ensuring 100% alignment between design, manufacturing, and procurement teams, which improved site readiness and reduced installation delays.

Project Engineer
Penang, Malaysia
November 2021 - October 2023 Projects: 1. Tampa International Airport (TPA), Florida, USA (USD 22 mil) 2. Charlotte Douglas International Airport (CLT), North Carolina, USA (USD 14 mil) 3. Wilmington International Airport (ILM), North Carolina, USA (USD 2 million) • Superintended the planning, design, and execution of engineering projects related to airport baggage handling systems and other airport infrastructure projects. • Handled project communication with clients. Co-ordinated the staffing of the Project with the Project Manager • Conducted feasibility studies and created project plans • Collaborated with other engineers, architects, and construction professionals to design and develop project plans • Prepared progress reports and communicated with stakeholders on project status. • Managed project teams and ensured that all team members are working effectively Evaluated, organized and prioritizing work within the overall project schedule with site installation team • Developed project-specific procedures for the site installation work to be carried out • Procured materials and equipment needed for the project • Attended Client & Consultant weekly meeting to resolve Commercial & Technical issues. • Technical & Financial study for the offers & quotations received from Suppliers & Sub-contractors. Managed and liaised with third party contractor to ensure all Baggage Handling System equipment is fit for use • Assisted the testing commissioning work by properly coordinating with the T&C support team • Leaded a team of Engineers and responsibility conduct training for Junior or Newly-Joined Engineers.

Project Engineer
Pteris Global Sdn Bhd
Directed end-to-end planning, design, coordination, and execution of airport baggage handling system (BHS) projects, supporting multi-million-dollar installations while ensuring compliance with airport engineering standards, safety requirements, and project timelines.

Project Engineer
Selangor, Malaysia
- Primarily involved in project management, installation planning/scheduling and customer/service/maintenance project handover of custom made engineered overhead crane (OTC) and dock leveler. - Maintained effective communication and professional relationships with main-contractors, sub-contractors, architects, consultants and government authorities (NIOSH/JKKP) - Completed projects on schedule as of contract and within allocated budget and sales targets (with >15% profit margin). - Provided field trainings to customers and maintenance/service technicians. Accomplishments: Successfully installed and commissioned 2 units of 20t double girder overhead crane together with designed free standing runway structure and 2 units of 10t Slewing jib crane at Aker Solutions in PKFZ Port Klang, Selangor, Malaysia. Succesfully installed and comissioned 2 units of 100t engineered double girder overhead crane at KKB Engineering Sdn Bhd at Sarawak, Malaysia. Successfully installed 2 unit KBK Monorail with free standing structure and 7 unit slewing jib crane at GKN Aerospace Sdn Bhd at Gelang Patah, Johor, Malaysia. Completed installation and commission of 48 unit of 13.8t dock leveler at Northport Port Klang. Completed installation and commission 2 unit of double V girder overhead crane at POSCO, Klang.
Nagendran Chelladurai's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


