Muhammad Arslan Latif

Muhammad Arslan Latif

Project Manager @ Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

About

Muhammad Arsalan Latif is a future revolutionist in the field of Renewable and Electrical Power. Having utmost devotion to bringing innovation in Solar Designing and Solar Technology. Managing a total of 30MW of Solar Park from Erection to O&M, I achieved my goal of making the Industry Zero Carbon Emission State and all the divisions operational on Solar Energy during that time. Getting practical hands-on work on domestic and industrial projects and excellent grip on Solar Designing, Installation, Testing and commissioning, Troubleshooting and monitoring, Quality Control, and Quality Assurance from Erection to Commissioning and execution of residential and industrial based grid connected/Hybrid solar power plants. Excellent experience in boosting the performance of power plants. RCAs, PM, and CM actions for achieving Targeted Energy numbers. In this regard Performed FAT & SAT activities of Transformers, HV, and MV cable terminations. Practical Hands of work on Huawei and SMA Inverters with rooftop, Ground mounted structure along ESS management, Earthing, protection, and Energy Audit. Strong command of Sketchup, PvSyst, Etap, MATLAB, AUTOCAD, and MS Office. Performance-oriented individuals with strong problem-solving capabilities. Excellent report writing, communication, and presentation skills. Having Gensets exposure, and getting familiar with plant operations, maintenance and control of Diesel Generator is also on the list. Taking part in Debates, Hosting events, and Attending Workshops on Leadership qualities and Technical Workshops is always been a hobby. Serving society in my own capacity, and being a Child Activist gives me extra energy to serve the masses and find happiness *Certified PV Designer from Saudi Electric Services Polytechnic

Country

Pakistan

City

Islamabad

Industry

Information Technology & Services

Skill

Renewable Energy, Electrical Troubleshooting, Project Commissioning, Complex Project Management, Technical Project Leadership, Strategic Project Management, Microsoft Office, Supervisory Skills, Process Improvement, Inventory Control, Decision-Making, Strategic Planning, Organizational Development, Designing, Procurement, updates , Assistant Work, Solar System Designing, Operation and Maintenance, Event Management and Professional Writer

Experience

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

Project Manager

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

LinkedIn
2021-7 - Present · 5 yrs 3 mos

Rawalpindi, Punjab, Pakistan

Erection, Execution, Commissioning, Operation and Maintenance of Industrial Projects Total = 30MMW (Kohinoor Textile Mills Limited - Rawalpindi, Gujar Khan Raiwind) Raiwind (7.4MW): 6.5MW 1.4MW Gujar Khan (8.35MW) : 2.1691MW 2.18MW 4MW Rawalpindi (5MW) : 6MW 2MW Extension 2MW 1MW Engineering, Procurement and Construction of Solar Park from Erection (Biding) - Budgeting, Execution, Commissioning, and O&M Project Costing, Planing Commissioning, Technical Proposal along with Financial Proposals and Selection. Inspection of Power System

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

Solar Application Engineer

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

LinkedIn
2019-8 - 2021-7 · 2 yrs

Pakistan

Total 5 MW SOLAR POWER PARK On-Grid 1MW Solar Power Project On-Grid(2018) 2MW Solar Power Project On-Grid(2019) 2MW (New) Solar Power Project On-Grid (2020) Solar Synced with Power Plant total capacity - 22MW comprises of Engines: Niigata 18V32CLX Diesel Engine/H.F.O - 2 Wärtsilä 8R32 Diesel Engine/H.F.O - 1 Ge Jenbacher J 320 GS - 9 Site, Staff and Material Supervising Online Monitoring of Solar Power Park Operation and Maintenance Solar Design, Cable Selection/Calculation, Circuit Breaker and Fuse Calculation, Quality Control and Quality Assurance in Solar Field To handle the emergency and planed shut down as per requirement Identified the operational system modification and implementation Producing daily reports listing all major events and resources utilized at site Practical hands of work on Solar Software Logiciel Photovoltaïque, LCS (Local Commissioning and Service Tool), Sensors including Environment Monitoring Sensor/Weather Power Plant - Gen-sets Diesel Engines, H.F.O and Gas Engines - Documentation and Scheduling Synced Operation of Solar Power Park with Gen-sets/Water and Power Development Authority plus Sui Gas

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

Trainee Engineer

Kohinoor Textile Mills Limited, Kohinoor Maple Leaf Group

LinkedIn
2018-7 - 2019-7 · 1 yr 1 mo

Rawalpindi, Punjab, Pakistan

Trainee Engineer Solar site updates to Deputy Manager - Solar Maintaining lists of solar procurement material

Solar House Engineering Works

Electrical Supervisor

Solar House Engineering Works

2017-8 - 2017-12 · 5 mos

Federal Capial &AJK, Pakistan

Solar Installation Operation and Maintenance Management

DH Solutions

Internee Engineer

DH Solutions

LinkedIn
2017-2 - 2017-3 · 2 mos

H-9 Islamabad

Worked on Government Projects, i.e. Power Factor Improvement, Smart Meter

Water and Power Development Authority

Internee Engineer

Water and Power Development Authority

LinkedIn
2016-8 - 2016-9 · 2 mos

Pakistan

Ghazi Barotha Hydro Power Project Power House Switch Yard - GIS Maintenance

Water and Power Development Authority

Internee Engineer

Water and Power Development Authority

LinkedIn
2015-7 - 2015-8 · 2 mos

Federal Capial &AJK, Pakistan

132 kV Electric Supply Substation: HT lines Switch Yard Power Transformer Control Room Protection and Instrumentation

Education

COMSATS University Islamabad

COMSATS University Islamabad

LinkedIn

Power

2013 - 2018 · 5 yrs

Taking part in different debate competitions make me confident enough and brings creativity in me , and makes me able to address crowds without hesitation. Final Year Project: Long Endurance Solar Powered UAV with useful sensors and equipment useful for Military Purposes as equipped with certain sensors which can used for areas affected with disasters and where mobilization is not possible. the UAV can fly without the question of fuel; fetch the data from affected area with a Zigbee antenna installed, through the medium of sensors. Store it in the SD card module and can get the results by data logging. C-60 mono crystalline Solar Cells on the wing span having 5 Ampere per cell - USED BY NASA IN THEIR RECENT PROJECT and Heavy Duty Electronic Speed Controller provides Long Flight and Efficient Energy Consumption for the Unmanned Aerial Vehicle

Muhammad Arslan Latif's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.