Mohamed El-Salamony, PMP®
Mechanical Manager @ FirstFix.KSA
About
- nearly 22 years of experience as a mechanical engineering consultant across various domains - HVAC, plumbing, medical gases, compressed air, and firefighting systems. - The experience spans multiple aspects - mechanical design, MEP design management, BIM coordination, site supervision, Infra Works and technical office work. - The projects worked on include a variety of buildings - public buildings, hotels, hospitals, commercial buildings, industrial facilities, and real estate properties. - The work experience spans many countries/regions - Egypt, Saudi Arabia, Tanzania, Uganda, Kenya, Nigeria, Ghana, Sierra Leone, Iraq, and UAE. - Strong knowledge of international codes and standards, uses latest engineering software, and pursues continuing education to stay up-to-date with standards. - Always striving to enhance knowledge and skills as a mechanical engineer through continuous learning. comes across as a highly experienced Mechanical engineer consultant with a wide range of technical and soft skills developed over a long career working on diversified projects across different countries. The mix of experience, adaptability to different contexts, drive for continuous self-improvement, and knowledge of cutting-edge as well as established industry practices make the professional background very compelling.
Egypt
Cairo
Construction
WaterGEMS, Design Management, Hotel Design, Construction Site Inspections, Engineering, Procurement, and Construction (EPC), Construction Drawings, Pre-Construction, Project Plans, Project Delivery, Project Coordination, Project Design, PowerPoint, Microsoft Word, Microsoft Excel, Windows, Microsoft Office, English, Research, Public Speaking, Photoshop
Experience

MEP Senior Design Manager
ALDAU Development (Member Of Sami Saad Holding)
Cairo Governorate, Egypt
Manage the complete Design Process activities for both Real estate, Retail & Hotel Divisions projects.

Mechanical Deputy Manager & BIM coordinator
Saudi Binladin Group (SBG)
Cairo, Cairo, Egypt
• Review and Study HVAC, Plumbing,medical gases and Fire Fighting Design Drawings Package. • Review and Study Project Specs, Materials Schedules, Hydraulic Calculations and Technical Reports • Prepare RFI's. For Any Missing Design Data or any Technical Inquires. • Prepare General Arrangement Sections for MEP Services in the building in corporate with Different disciplines. • Follow Up Modeling of HVAC, Plumbing and Fire fighting systems and solve any conflict between different services. • Prepare and Review work shop drawings (HVAC, Plumbing and Fire Fighting) . • Prepare Builders Work Shop Drawings and Coordinate it With Both Arch and Structure Drawings. • Apply Consultant comments on Shop Drawings If Any. • Periodically Issue Revit And Navis Clash Report and Check the Deviation and Update General Arrangement Section. • Participate with Technical office Head in Preparing estimated Work Time and Submission dates. • Participate with BIM manager to Identify Clash Report Criteria.

MEP Design Manager
Egypt
• Detect suitable mechanical systems for the project according to client requirements and available budget . • Develop design criteria report "Schematic Report". • Designing HVAC (cooling & ventilation) , plumbing (supply &drainage), fire fighting (water&gas) , oil drainage networks and compressed air networks. • Site supervision of Mechanical Systems installation ,testing & commissioning (HVAC, Plumbing, Fire Fighting). • Managing & giving instruction to site engineers and contractor’s engineers. • Complete coordination with all design and execution departments. • Reviewing shop drawings, calculation ,method of statement and materials submittals from contractors. • Preparing BOQ and specification. • Preparing periodical progress report. • Review calculations, shop drawing • Submit complete tender package. • Reply on contractors RFI and MAR. • Participate with technical office and project management in make projects cost estimates and time schedules. • collaborating with team work to plan,organize and schedule project work and assure compliance with tender and construction documents.

Senior Technical Office engineer
AZUR For Hotel (member of Orascom for hotels and developments)
Egypt
construction new hotels according to different codes and standard: 1. Piping networks work (water supply & drainage system, Automatic sprinkler system, Chilled water networks, engines cooling systems, hot water networks and swimming pool piping. 2. Equipments and Mechanical systems erection work: -water treatment stations (filters, pumps and pressure tanks). - Boilers and heat exchangers. -sprinkler system stations (pumps, pressure tanks, zone valves and test valves). - Chillers Plants and Terminal Units (condenser cooling cycle, chilled water cycles, fan coil units , AHU and water regulating valves). - Fire fighting and bilge pumps. - Ventilation Fans and ducts work (supply, return& exhaust) . - Swimming pool piping and pumps (filtration, supply, drain, jets and back wash). - Engines and generators installation and startup. 3. Coordinate between forging consultant, electromechanical consultant and interior consultant In Site. 4. Make collection for the required materials. 5. Coordinate with the foreman, contractors and technicians and ensure the smooth flow of work. 6. Conduct site surveys immediately on approval of drawings to check for suitability of Installation. 7.Report to immediate superior if there is any deviation observed at site. 8.Schedule with the consultant the flow of work. 9.Ensure that all technical and safety parameters are taken care of at the time of Installation. 10. Set the plan of action to achieve the required man hours for each phase of the Installation activity. 11.Revise and approve valuation of contractors . 12. Revise project Specs. and Different codes with technical office engineers. 13. Check all supplied materials to Site.

Hotels mechanical maintenance engineer
mirotel for hotels
A. Responsible for maintenance of: 1-Diesel engines and gearboxes (CARERPILLAR 3400 series, MAN,REINGTS ) 2- Generators (CATERPILLAR 3406-3408-3306-VOLVO). 3- Chillers plants and chilled water Pumps, boilers, and terminal units. 4- Water treatment systems. 5- Swage treatment systems 6- Kitchen &laundry equipments. 7- Swimming pools equipments B. Following up different maintenance operations of hotels during periodical renovations . C. Monitor and control all maintenance activities Budget. D. Prepare List of spare parts stock and Annual forecasting for maintenance expenses. E. Applying ISO-9001 Preventive maintenance programs to hotels equipments and Services. F. Arranging the work of maintenance Team ,and choose the best time for maintenance operations. G. record all maintenance activities in equipments log books and Issue periodical maintenance reports with equipment status and life time.
Mohamed El-Salamony, PMP®'s Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



