Mark Koenig
Project Manager @ Chesapeake Utilities Corporation
About
Industry professional and proven project management skills. Has demonstrated the ability to work Project Controls, Process Engineering, Design, Process Controls, Production, Procurement, Reliability Engineering, and Maintenance to ensure all groups are aligned in terms of safety, function, sizing, project specifications, schedule, and cost. Engineering and design experience dealing with liquid petroleum and natural gas type transportation systems. Responsible for sizing and optimizing facilities including but not limited to pump, meter, regulator, and compressor stations. Responsibilities further include the use of computational fluid dynamics and hydraulic modeling to study two phase and transient conditions in addition to surge and hammer effects. Extensive knowledge of State and Federal Regulations including 49 CFR Parts 192 & 195, FERC requirements, ASME 31.4, 31.8, API 1104, and ANSI guidelines. •A dedicated Pipeline Engineer that has FEED thru Execution project experience; •Experience with basic design engineering calculations for pipelines; •Knows materials specs and codes for pipeline materials; •Understands construction methods and technologies, more so than a plant facility scenario; •Knows the environmental laws to pipeline planning, development and construction; understands legal, land environmental, civil, infrastructure, regulatory agencies, etc. •Familiar with Cathodic Protection •Has strong communication skills with clients, office staff and field teams; •Has had midstream / gas gathering related onshore project work Other duties have included estimating and proposal creation for potential new projects using Microsoft Project 2010 and the Microsoft Office 2007 suite of products (Outlook, Word, Excel, PowerPoint). Specialties: Use Technical Toolboxes’ software, Pipeline Toolbox 2010, for HDD and piping designs. Use Mathcad V14 for HDD analysis. Other duties: Perform or supervise preparation of: o Design Basis Memorandum, design specifications and procedures o Pipeline stress calculations o Wheel and track load calculations o Hydrostatic and/or Pressure Test Calculations and Plans o Cost estimates o Pipe sizing calculations o Buoyancy Control Calculations and Studies o Bill of Materials o Plan and Profile alignment sheets o Permit drawings (road, railroad, waterbody crossings) o Typical Detail drawings o Hydrostatic Test drawings o Horizontal Directional Drilling drawings
United States
Greater Houston
Oil & Energy
Microsoft PowerPoint, Work Breakdown Structure (WBS), Microsoft Excel, Oil and Gas, Construction Management, Presentations, Lump Sum, Contractual Obligations, Project Engineering, MS Project, Piping, Project Planning, Pipelines, Engineering, AutoCAD, Systems Engineering, Aerospace, Finite Element Analysis, Engineering Management, Microsoft Office
Experience

Project Manager
Houston, Texas, United States
Special projects with Gulf South Region Compliance Program for small facilities corrective actions -OPP (Over Pressure Protection) Primarily responsible for managing contracts, materials, schedule, and budgeting. Work with construction managers implementing compliance projects.

Construction Advisor
Houston, Texas, United States
Project Manager – Coordinate with construction, vendors, contractors and engineering in the Permian Basin to develop complete technical packages for Work Orders (WOs) for facility/pipeline projects including: -Pipeline Installations Diameters 30” to 4” (Gas and Crude) - Compressor Stations installations and moves - Integrity Digs -ILI tool analysis, location and contactor bid packages - LACT moves - Gas meter installations - Cyro Plant upgrades Horizontal Directional Drill Design (HDD), road bores, and applicable load/stress calculations using Technical Toolbox. Review engineering packages and BOMs for completeness, accuracy, and constructability. Work with Supply Chain to complete bid package to contractor and answer bid clarifications. Prepare construction budgets and bid package for business development opportunities. Receive, review, and approve bids prior to issuing WOs to start construction. Pressure test plan development and review/acceptance of test results. Participate in risk reviews, HAZOPs and PHA’s as required. Weekly P6 project updates. Familiarity and knowledge of materials standards & specifications (CFR 49, Part 192 and Part 195; ASME B31.4 and B31.8., US Army Corps).

Project Manager
Enbridge - (MG Dyess contract)
Houston, Tx
• Managed the upgrade of Main Line Valves for Enbridge to include Remote Controlled Valve Operations (RCV) capabilities. • Coordinated project timelines, budgets, and resources to ensure successful implementation. • Collaborated with cross-functional teams to optimize valve operations and enhance safety measures • CSA Z662, CSA Z245.1, CSA, Z245.11 & Z245.12, 49 CFR Part 192 & 195, US Army Cops

Pipeline Project Manager (Fishbone Energy Services)
INEOS (Fishbone Energy Services)
Houston, Texas Area
• Managed project schedules, budgets, and designs for various capital pipeline projects at INEOS. • Collaborated effectively with stakeholders and subcontracted EPC’s to ensure project success. • Provided regular updates and project status reports to stakeholders and management. • Utilized the FEL Stage gate review process for INEOS approval.

Principal Engineer
G2 Partners
Houston, Texas Area
• Led engineering and design of 25-mile brine water pipeline, incorporating HDPE liner for corrosion protection. • Managed the design of couplings for HDPE liner connections in the steel pipe. • Oversaw the engineering and design of a 26-mile 16" natural gas pipeline project in Texas.

Senior Principal Engineer
Eagleton Engineering
Houston, Texas Area
• Senior Pipeline engineer - perform oversight on pipeline-related engineering work products (calculations, design, specifications, etc.). Provide technical leadership to other engineers. Function as interface between engineering teams, management and clients. Familiar with all relevant codes and regulations, especially CFR 49, Part 192 and Part 195; ASME B31.4 and B31.8. • Perform or supervise preparation of: o Design Basis Memorandum, design specifications and procedures o Pipeline stress calculations o Wheel and track load calculations o Hydrostatic and/or Pressure Test Calculations and Plans o Cost estimates o Pipe sizing calculations o Buoyancy Control Calculations and Studies o Bill of Materials • Review and provide engineering input/guidance for: o Plan and Profile alignment sheets o Permit drawings (road, railroad, waterbody crossings) o Typical Detail drawings o Hydrostatic Test drawings o Horizontal Directional Drilling drawings

Project Manager/Pipeline Engineer
Houston, Tx Area
• Managed multi-million dollar expansion projects at Chevron Pipeline's field office in Mont Belvieu, TX, overseeing a team of 10 designers and drafters. • Provided technical leadership, interfacing with engineering teams, management, and clients, ensuring compliance with relevant codes and regulations. • Led design activities including pipeline alignment, traffic control plans, meter station design, and HDD bores, resulting in successful project completion. • Reviewed and provided engineering input for alignment sheets, permit drawings, and hydrostatic test drawings.

Senior Engineer
· PM/Engineer responsible for Natural Gas pipeline installation in the Barnett Shale region · Directed the construction crews for pipe construction hydro testing and commissioning activities · Coordinated pipeline routes with both the customers and surveyors · Prepared pipeline alignment sheets and pipeline station locations design Horizontal Directional Drilling (HDD) bores metering skids well connects valve yards and pig traps (launchers/receivers) · Analyzed Horizontal Directional Drilling (HDD) bores for allowable longitudinal stresses per ASME B31.8 · All design and pipe sizing is per ASME B31.8 and Part 192 of the Railroad Commission of Texas Pipeline Safety rules · Proficient in Technical Toolboxes’ software Pipeline Toolbox for HDD Pull Forces and stress analysis

Senior Pipeline Engineer
Gulf Interstates Engineering Company
Houston, Texas, United States
· Westlake Brine Pipeline Project Responsible for engineering and design of the new 25-mile 12-inch brine water (liquid) pipeline from PLMS's Choctaw Storage terminal (Salt Domes) in Plaquemine LA to the West Lake Chemical facility in Geismar LA · Participated in design and HAZOP / PHA safety reviews prior to construction · A HDPE liner was installed inside of the steel pipeline for added corrosion protection · Responsible for the design of the locations of the couplings at approximately every 3000 ft for the HDPE liner connections in the steel pipe · Yellow Fin Pipeline Project Marlin Midstream: Responsible for engineering and design of the new 26-mile 16-Natural Gas pipeline in Panola and Rusk Counties TX · Project Manager on various small CenterPoint pipeline replacement projects including construction and startup
Mark Koenig's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



