MAH KIT WAI
Facility Manager @ Daikin Malaysia Sdn Bhd
About
Greetings! I am a results-driven Facility Manager with over 15 years of experience in facility operations, engineering maintenance, and energy optimization within large-scale manufacturing environments. Throughout my career at Daikin Malaysia Sdn. Bhd.My expertise covers HVAC systems, mechanical utilities, plant infrastructure, and environmental compliance, supported by hands-on experience leading multi-disciplinary teams and managing end-to-end facility projects. I take pride in achieving measurable outcomes — including reducing energy consumption by 26%, cutting monthly electricity costs by RM6,000, and spearheading sustainability projects such as solar system integration and SCADA implementation to enhance reliability and operational visibility.I believe effective facility management goes beyond maintenance — it’s about aligning engineering, safety, and sustainability to create long-term value for the organization. I have led initiatives that improved workplace safety, achieved zero major incidents, and ensured full compliance with ISO 9001, ISO 45001, ISO 14001, and ISO 50001 standards. My leadership approach emphasizes cross-functional collaboration, continuous improvement, and empowering teams to take ownership of results.🚀 Key StrengthsFacilities & Engineering ManagementPreventive Maintenance & Energy OptimizationProject Planning & Vendor CoordinationHVAC & Utilities Systems ExpertiseEnvironmental & Safety ComplianceTeam Leadership & TrainingISO & Lean Implementation🌟 Career AspirationI am passionate about driving sustainable facility management and engineering innovation. My goal is to lead future-ready facilities that leverage green technologies, smart systems, and energy-efficient solutions. I aspire to contribute to organizations that champion ESG initiatives, operational excellence, and long-term environmental responsibility.🤝 Why Collaborate with MeI bring a strategic mindset, technical mastery, and a strong record of delivering measurable improvements in cost, energy, and safety. I thrive in collaborative environments where innovation, accountability, and teamwork drive results. Every project I lead is guided by a commitment to excellence, continuous improvement, and sustainable progress.Let’s connect and explore how my expertise in facility management and engineering sustainability can contribute to your organization’s growth and efficiency goals. 🌿⚙️#FacilityManagement #EngineeringLeadership #EnergyOptimization #Sustainability #HVACSystems #OperationalExcellence #ProjectManagement
Malaysia
WP. Kuala Lumpur
Consumer Goods
Lean Practices, Continuous Improvement, Operational Efficiency, Resource Planning, Budgeting, HVAC Engineering, Utilities Systems, Team Leadership, Vendor Management, Project Coordination, Safety & Environmental Compliance, Energy Optimization, Cost Optimization, Facility Management (FM), Engineering Management, Microsoft Excel, Microsoft PowerPoint, Teamwork, DraftSight, Workplace Safety
Experience

Facility Manager
• Led overall facility management operations including maintenance, safety, and environmental compliance for manufacturing sites, ensuring all systems functioned efficiently and safely. • Implemented preventive maintenance programs that minimized downtime by 20% and extended the lifespan of critical equipment and building assets. • Optimized energy usage through the upgrade of compressors, HVAC, and lighting systems, resulting in 26.4% energy savings and RM6,000 monthly cost reduction. • Directed major upgrading and expansion projects, including canopy extensions, solar system installations, and factory renovations, all completed on time and within approved budgets. • Managed vendor contracts and cross-functional project teams, ensuring high service quality, cost efficiency, and compliance with ISO 9001, 45001, and 14001 standards. • Enhanced workplace safety culture by conducting regular audits, staff training, and risk assessments, achieving zero major incidents and full BOMBA compliance. • Championed sustainability initiatives, such as refrigerant conversions and solar energy projects, to reduce environmental footprint and support Daikin’s green objectives.

Production Engineer
• Managed production line operations to ensure consistent output quality, optimizing manpower allocation and reducing daily downtime through efficient scheduling. • Conducted root-cause analysis and process improvements, successfully minimizing recurring equipment breakdowns and improving production stability. • Collaborated with quality and maintenance teams to implement corrective actions and enhance manufacturing efficiency, achieving higher output with reduced defect rates.

Production Engineer
Chung Hwa Picture Tubes (M) Sdn Bhd
• Investigated and resolved production quality issues, implementing process adjustments that improved line yield and reduced rejection rates. • Reviewed and optimized manufacturing procedures, ensuring compliance with ISO standards and enhancing overall process reliability. • Supported cross-department improvement projects, introducing design and process modifications that enhanced productivity and operational efficiency.
MAH KIT WAI's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



