Louis Du Plessis
SME RAN Operations @ Huawei
About
WORK EXPERIECE SME Ran Operations Ericsson SA May 2015 - recent Reporting to the MSIP revenue assurance: Key responsibilities: Team Lead for 2nd level Back office of all RAN Network Elements along with coordination with Global Support team for complex faults for 2G,3G and LTE network of MTN-SA Network. • Providing Technical Support on Level 2 for 2G 21233,21255 and EVO BSC’s, 3G RNC 3820 & EVO 8200 RNC’s, 2G RBS Types (2206-2206 V2-2106-2216-2116-2109- 2308-2309) ,3G RBS Types (3206-3106-3117-3216-3418-3518-3303-3308) LTE 6k RBS’s and BB 5212/5216. ,RBS 6000 Types ( 6102 - 6201 - 6101 - 6606 ) & Baseband 5212/5216. • Supporting in Configuration/troubleshooting for RAN Support ( TCU – SIU ). • Responsible for ALL technology upgrades i.e. 2G/3G & LTE upgrades for BSC/APG/RNC/eNodeB/NodeB/BTS etc.(Like G/IPA/Linux/RBS Upgrades) • Responsible for Project Handovers/AT for all RAN nodes i.e. BSC/RNC & RBS and driving all modernization projects for BSC/RNC & RBS nodes. • 2nd level Trouble Management of all RAN NE’s & coordination with Global Support team (GSC-Romania) for complex faults for 2G,3G and LTE network and driving till its resolved and providing High Level support • Maintaining the KPI’s • Responsible for CSR/Emergency creation for complex faults towards T1/T2/Design Team complete RCA • Trouble ticket, Change request based preventive and corrective actions. • Responsible for all the upgrades including troubleshooting • Responsible for outage RCA analysis & update to customer. • Supporting for RAN nodes re-homing & migration to SRF and NE support. • Providing support 24*7 to FO/BO/SRF and other teams Senior Engineer: Switching High Level Support MTN SA Oct. 2001 – March 2014 Head of Operations Lagos MTN Nigeria Communications Ltd Feb. 2002 till March 2007 Snr BSS Engineer MTN SA April 2000 – Sept 2001 Head of Operations SMC MTN SA June 1998 – March 2010
South Africa
City of Johannesburg
Telecommunications
GSM, LTE, 3G, 2G, Transmission
Experience

Snr Engineer Switching High Level Support
Gauteng
Senior Engineer: Switching High Level Support MTN SA Oct. 2001 – March 2014 Reporting to the Manager Switching High Level support: • CSR handling. Logging CSR’s with Ericsson for faults caused by loading of new software. • Software upgrades: R8 - R9.1 From R9.1 - R10 and From R11 - R12 – R13.2 • Loading and testing of new BTS software from R8 – R9. R9 – R10. R11 – R12 - R13.2 • Testing of new supplier equipment (Huawei BSCs for Nigeria and Huawei BSCs and MSC’s for Uganda) • Building and Testing of new test plant. • Integration and testing of all new nodes to ensure correct correction level. • Fault finding on all BSC’s, MSC-S, SCP’s, HLR’s, STP’s • Fault finding using tools network optimization (FACTS, Passive monitoring) • CP slides from APZ 212 20 – APZ 212 30. APZ 212 25 – APZ 212 20. APZ 212 30 – 21233. APZ 212 33- APZ21240. APZ 212 40- APZ21250 • Assisted with BYB202 – BYB 501 swap outs. • Implementation of HLR redundancy • Transfer of HLR data from old HLR to New HLR. • Implementation of International gateway. • Preparation of Switching, Signaling, Services for O & M. • Testing and implementation of new services e.g. clocking trough the Internet. CAMEL. • Testing and writing rules and standards for Changing STP structure from GTRC routing to MTP routing. • Compiled the standards of the first remote BSC in Africa. • Integration and testing of the first remote BSC in Africa. • Tested and implemented TG sync across the MTN SA network. • Compiled the implementation instructions from RBS2216 extended range • Tested and implemented 2216 RBS extended range • Testing and loading of MSC-S and MGW new software from 4.1 - 5.6 • Testing and integration of AMIDO (swapping out of old monolithic MSC to MSC-S and MGW) project • Testing and integration of GNP • Testing and integration of SIGTRAN • Testing and integration of M2PA routing

Head of Operations Lagos MTN Nigeria Communications Ltd
Lagos
For Managing Core Network (SS/BSS), Network Data Configuration and Control and 2nd line functional teams with total staff strength 10 to carry out the following: • Core Network Rollout (Deployment), Integration and Cut over. • Core Network Operations, Capacity Building, Enhancements and Optimization. • Core Network Resources and Capacity Utilization. • Core Network Hardware and Software Upgrades for e.g Ericsson CME20 R8 – R 9.1. R9 – R10, APZ 21230 – APZ 21233, APZ 21233 - APZ 21240, IOG-20 – APG40 Swap outs. • Deployment of Second vendor BSS by swapping out operational ones (Swap out of Ericsson BSCs with Huawei BSCs and BTSs). • Expansion of Core Network Nodes by in-house resources and this reduced the implementation costs. • Re-dimensioning of MSC’s, BSC’s, SCP’s, STP’s and HLR’s. • Deployment of TSC structure. • Integration of STP structure on HLR’s using strict SS7 rules. • Integration of STP structure. • Establishment of O&M procedures for maintenance. • Establishment of Core Network Operations and Maintenance, Roll out, Integration and Cut-Over Strategy, Processes and Procedures. • Deployment and Integration of New Networks (GPRS, MMS) and evolution to 3G. • National and International Interconnectivity with establishment of Roaming agreements with Roaming Partners. • Network Configuration and Data Control. • Network Technical Audit and Reporting. • Network Quality of Service and Performance Measurement and Analysis. • Core Network Project and Program Management. • Vendor Negotiation for new products • Prepare and manage the annual OPEX budget • Teletraffic Engineering and Analysis using Post Processing Computer Aided Tools. • Knowledge Transfer, Competence Development and Training Developments for Skilled Staff Resources with strong emphasis on Change Management. • Establishment and leading of Performance task team giving MTN SA • Standardization of Global titles • Standardization of B-number tables

Snr BSS Engineer MTN SA
Gauteng
Snr BSS Engineer MTN SA April 2000 – Sept 2001 Reporting to BSS Manager • Acceptance, Integration of BSS Switches. • Site re-parenting. 6500 TRX’s in one year (2001). • Preparation of Switching, Signaling, Services and O & M Plans. • Standardization DX clusters. • Integrating MTN SA transmission network on DXX. • Switching Network Configuration and Data Control on all BSS nodes. • Establishment Testing Procedures for all new nodes. • Training of new Engineers. • Support for all BSS activities. • Planned and ensured successful upgrade all BYB202 nodes to 1024 TRX’s.

Head of Operations SMC MTN SA
Gauteng
Reporting to SMC Manager • Acceptance and integration of Network elements onto the network • Automation of alarms • Dashboard integration for all network elements • Staff shift allocations • Monitoring of all Network elements and escalation of all faults
Louis Du Plessis's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



