Lisa Mayo

Lisa Mayo

Advanced Manufacturing Engineering Senior Manager @ Vertiv

About

A manufacturing leader with extensive years of service in manufacturing engineering & operations. Excellent record of achievement and advancement earned through contributions to bottom-line results. Outstanding reputation as a leader and an effective problem solver. An honest and dedicated team player with a strong work ethic. A professional role model driving a positive culture in a respectful and collaborative manner.

Country

United States

City

Howell

Industry

Automotive

Skill

Continuous Improvement, Business Strategy, Quality Operations, Cost Management, AutoCAD, Computer Numerical Control (CNC), Network Design, Robotics, Programmable Logic Controller (PLC), Six Sigma, Project Management, Lean Manufacturing, Automotive, Manufacturing

Experience

Vertiv

Advanced Manufacturing Engineering Senior Manager

Vertiv

LinkedIn
2026-6 - Present · 4 mos
Ford Motor Company

Area Manager - Woodhaven Stamping Plant

Ford Motor Company

LinkedIn
2023-2 - 2025-12 · 2 yrs 11 mos

Woodhaven, MI

Woodhaven Stamping Plant Area Manager Responsible for plant facilities, maintenance production support, controls engineering and tool & die to deliver SQDCPME targets.  Led 2025 Kaizen events for CSP and DSP delivering a net return of $1 Million in savings annually.  Exceeded WAVE cost objectives for 2025 of $3.2 Million 2025 (Wave initial year launch) and on track to exceed $2.6 Million 2026 target.  Ensured quality launch of Mustang / FCSD products to meet MP1 and MP2 delivery requirements in addition to supporting insourced Kansas City jobs and production support needs.  Created positive culture through recognition events, culture walks, skip levels, and facility renovations. Lead for WSP Women of Ford Chapter and active in mentoring program.

Ford Motor Company

Production Area Manager - Woodhaven Stamping Plant

Ford Motor Company

LinkedIn
2020 - 2023 · 3 yrs

Woodhaven Stamping Plant Responsible for plant production and support groups to deliver SQDCPME targets.  Met Safety objectives YOY with 0 lost time cases and top performing plant within Ford Motor Company  Met Quality targets YOY with an additional stretch in Q1 with 25% scrap reduction in Hot Stamping.  Exceed Cost and met Delivery targets 2022 L&OH budget $545K given back while also delivering $1.6 M profit improvement task  Innovation lead for major automation projects including Hot Stamp auto-rack with new technology 3D vision system for 8 head reduction.  Exceeded 6 Sigma GB/BB training targets and reduce cost with $1.2 M in projects exceeding target of $850K for 2022.  Created positive culture through recognition events, culture walks, skip levels, and facility renovations. Lead for WSP Women of Ford Chapter and active in mentoring program.

Ford Motor Company

Production Manager - Sterling Axle Plant

Ford Motor Company

LinkedIn
2019 - 2020 · 1 yr

Sterling Axle Plant Responsible for Dept 86, 87, 96, 97, 41, 42, 43 & 44 production and support groups to deliver SQDCPME targets.  Improved FTT 50% to 100% for D43s gear roll in working with PD & PTME prior to MP1 in addition to numerous error proofing additions.  Installed program equipment 100% on time and with budgeted work orders.  Scheduled effectively for all PTR builds meeting or exceeding program timing; Work done up front at supplier to resolve recovery issues with introduction of f new flexible cells.  Recognized team frequently for extraordinary talents and efforts.

Ford Motor Company

Launch Manager CD6R Axle Program - Sterling Axle Plant

Ford Motor Company

LinkedIn
2018 - 2019 · 1 yr

Sterling Axle Plant Responsible for 2020MY U625 CD6R IRS axle launch at Sterling Axle Plant though MP1 milestone.  Improved FTT 50% to 100% for D43s gear roll in working with PD&PTME prior to Job 1 in addition to numerous error proofing additions.  Installed program equipment 100% on time and with budgeted work orders ensuring 100% workstation readiness and manpower staffing  Scheduled effectively for all PTR builds meeting or exceeding program timing; Work done up front at supplier to resolve recovery issues with introduction on new flexible cells.  Recognized team frequently for extraordinary talents and efforts.

Ford Motor Company

Senior Electrical Controls Engineer - Powertrain Manufacturing Engineering Staff

Ford Motor Company

LinkedIn
2017 - 2018 · 1 yr

Powertrain Manufacturing Engineering Staff Vandyke Transmission / Livonia Transmission Responsible for 2019 MY 8F57 for CD539 Case and VB PTO ME controls including Risk Assessment review, equipment design, installation and commissioning  Program 100% on track for controls with all equipment in yellow Protag and MIDAS > 85% for 42 assets.  Commissioned first QWX connectivity inside VTP in 8F57 Valve Body in addition to QTS implementation at 90% complete.  Worked close with plant launch team to ensure 100% customer satisfaction along with training team on new technologies (routers, MDT improvements, Acronis, SolidCore, etc)

Ford Motor Company

Senior Electrical Controls Engineer - Stamping Business Unit Staff

Ford Motor Company

LinkedIn
2014 - 2017 · 3 yrs

Dearborn, Michigan, United States

Stamping Business Unit Staff Responsible for Stamping Business Unit controls engineering standards for all new equipment launches including specification development for all electrical, pneumatic, hydraulic and lube systems. Modification of all equipment bid specifications, designs review, technical support and machine acceptance reviews across all Press, Automation and New Technologies divisions within SBU. Coordinating open items and support needs with all suppliers. SBU representative for Electrical Technical Committee (ETC) overseeing PTO/VO/SBU Global Specifications.  Developed all SBU electrical, pneumatic, hydraulic and lube standards for SBU to meet goal of implementing SIEMENS based controls strategies. Established dedicated suppliers to provide support for all equipment reviews and open issues adding 5 dedicated manpower resources to core engineering.  Aligned Schuler with Ford SBU controls standards for strong relationship to ensure successful Hot Stamping partnership on global launch (C519, U611/625, C482/3) investment of 70 million + dollars.  Responsible for supporting projects not limited to Hot Stamping and Laser Cells, CSP Line 13 Destacker, CSP Line 5 Destacker, BSP Line 11/12/24/25 EOL, BSP L15 Destacker/ Inter-automation, CSP Line 19 FOL, KTP Tryout Press.

Ford Motor Company

Electrical Controls Engineer - Vandyke Transmission Plant

Ford Motor Company

LinkedIn
2012 - 2014 · 2 yrs

Sterling Heights, Michigan, United States

Vandyke Transmission Plant Responsible for production support for all 6F Midrange machining & assembly in a primarily Siemens machine control environment. Manage machining continuous improvement projects. Support central engineering capacity increases. Work strategically to meet scorecard objectives.  Improved robustness on Phase 2 transmission case and convertor machining error proofing cameras using data collection and common template for proper feature detection with less than .05% false rejects.  Completed logic rewrite in Phase 2 transmission case and convertor machining bottleneck deburr operation and pack out zone controllers to provide manual functions, proper faults and diagnostic to minimize downtime and improve JPH with 6FM currently running at a 40 Index YOY and On Target Total Yearly Average.

PepsiCo

Marketing Equipment Manager

PepsiCo

LinkedIn
2009 - 2012 · 3 yrs

Flint, Michigan, United States

Responsible for coordinating all warehouse inventory management and equipment repair for the Michigan Market Unit. Manage $11.3M USD cost budget and a $6.6M USD capital budget. Oversee all facility maintenance and operations. Comply with all safety and environmental regulations. Work strategically to meet scorecard objectives.  Relocated Merchandise Equipment Operation Center from Lansing, MI to Flint, MI with early completion and on budget.  Redesigned warehouse layout utilizing visual controls to optimize workflow processes and reduce headcount by 15% over prior year and created the national benchmark facility for merchandise equipment.  Developed scrap supplier request for quote standards and implemented regional agreement for a savings of $500,000 annually.  Created inventory management system reducing days in inventory (DII>28) from 62 PY to 38 CY in addition to eliminating customer install cancellations due to non-stock.  Improved Employee Insight scores at a record rate of 15% - 50% per dimension over prior year.

General Motors

Maintenance General Foreman - Flint Engine Plant

General Motors

LinkedIn
2007 - 2008 · 1 yr

Flint, Michigan, United States

Flint Engine Operation Responsible for coordinating all predictive, preventative and emergency maintenance for engine machining. Worked integrally with production and engineering to coordinate all project installations. Strategically managed resources to meet safety, people, responsiveness, quality and cost targets.  Utilized shared facility resources and alternate strategies to reduce spare parts spending by $700, 000.  Maintained zero recordable injuries for 2008 holding benchmark standards.

General Motors

Assembly Supervisor - Romulus Engine Plant

General Motors

LinkedIn
2006 - 2006

Romulus, Michigan, United States

Romulus Engine Operation Responsible for engine assembly production and objectives relative to quality, schedule and cost. Managed 50 employees on job assignments ensuring safe work practices.  Met production cost schedule with a 10% reduction of hours per unit by supporting Project 50 implementation.  Improved quality with a 65% reduction of pulls, a 24% reduction of PPM to vehicle assembly and a 5% FTQ improvement.

General Motors

Senior Electrical Controls Engineer - Romulus Engine Plant

General Motors

LinkedIn
2004-1 - 2005-12 · 2 yrs

Romulus, Michigan, United States

General Motors

Maintenance and Controls Engineer - DMAX, Ltd (Joint Venture GM & Isuzu)

General Motors

LinkedIn
2001-9 - 2003-12 · 2 yrs 4 mos

DMAX Joint Venture GM & Isuzu

General Motors

Electrical Engineer Co-op - Livonia Engine Plant

General Motors

LinkedIn
1996-1 - 2001-9 · 5 yrs 9 mos

Livonia, Michigan, United States

Education

Kettering University

Kettering University

LinkedIn

Manufacturing Operations

2001 - 2003 · 2 yrs

2003 Certificate in Lean and Flexible Production Systems

Kettering University

Kettering University

LinkedIn

Electrical Engineering

1995-8 - 2001-1 · 5 yrs 6 mos

Lisa Mayo's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.