
konstantin boguinski
project coordinator
australia
sydney
civil engineering
civil engineering, concrete, construction, construction management, autocad, structural engineering
Experience

project engineer
uea group
* HDPE water main and concrete pipe drainage installation in WestConnex M4E (2 months) -DICL water main relocation at Green Square with DG Alliance (2 months) -uPVC Sewer Expansion at Epping in conjunction with Poly Horizon (4 months) * Managing Procurement, QC and WHS for the projects. * Meticulous recordkeeping and daily progress photos collation. * DICL, HDPE, uPVC, steel, concrete pipes joining and associated valves, scours, manholes, pits installation and testing. * Microtunnering to grade and pipe jacking. * Narrow and deep trench excavation in solid rock. * In situ and precast manhole and pits design and installation. * Gravity and pressure pipe assembly and installation. * Issuing and negotiating EOTs, variations and claims. * Project submission and leasing with stakeholders. * Post construction monitoring and preparation of dilapidation reports.

project engineer
diona civil engineering contractors
* Sydney University Capitol Works in conjunction with Lendlease (6 months) * Managing Procurement, QC and WHS for the project. * Manufacturing and delivering comprehensive ITP&C packages for every separately deliverable stage of the contract. * Issuing and negotiating NCRs, EOTs and variations. * Leading the construction and management team on an 8 million dollar services relocation project. * Communication poly conduit installation and custom concrete communication pit building to Telstra Work Instruction. * HDPE and copper water distribution, testing and connection to Sydney water standards. * Nylon gas distribution, testing and connection to Jemena standards. * Directional drilling and steel encased fibre pipe jacking; deep excavations with trench boxes and slide rail assembly over 10m deep with sewer manholes construction to Sydney water standards. * Updating the stakeholders on the progress of the project weekly. * Regular site visits and safety, quality and environmental inspections and photo evidence collection.

site engineer
shannon construction
* Randwick Military Barracks Site (17 months) * Supervising a work floor trenching and excavation team. * Preparation of Safe Work Method Statements, daily morning pre start, safety meetings and obtainment of excavation permits. * Trench excavation, conduit pipe laying & joining, form work installation, concreting, pit installation and horizontal directional drilling. * Operation and quality control of hydro vacuuming nondestructive excavation and service location. * Site area restoration to original condition including backfilling, asphalting, curbing etc. Picton Sydney Water Sewage Treatment Plant (16 months) * Preparation and completion of Inspection Test Plans & Inspection Test Check Sheets. * Quality Control of HDPE pipe installation in according with current standards, butt & electrofusion welding and joining. * Quality control of trenching, hydro vacuuming and landscaping. * Preparation and creation of environmental compliance documents. * Maintaining excellent relationships and constant contact with the clients during contract variations.

courier
supersave chemist
Over 11 years courier experience in the medical industry.

project engineer
codmah pty ltd
* Cockle Bay Town Sewerage Scheme in Kincumber and Empire Bay (15 months) * Managing up to 70 sub/contractors in multiple teams. * Submitting and negotiating NCRs, EOTs and variations. * Leading the construction and management team on a $10 million sewer pipe laying project. * Liaising with the council representatives daily, submitting monthly claims and reviewing contractor invoices. * Managing construction of pumping station. * Managing service location, traffic control, directional drilling, butt welding, EF welding, underbore, coreholing, road cutting, gravity drilling, pipe laying, backfilling, and site restorations. * Preparation of dilapidation reports and post construction monitoring. * Managing communications for the project in addition to dedicated project enquiry telephone line. * Updating the stakeholders on the progress of the project weekly. * Conducting QC inspections as well as completing ITPs and ITCs. * Liaising with Ausgrid, Energy Australia, Sydney water and arborists.

project coordinator
sydney water
Education
university of western sydney
engineering
konstantin boguinski's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

