Jun-Wei Kuo
Program Manager @ Wistron
About
Experienced Program Management in the EMS industry. Skilled in NPI, Ramping up, Cross-function team work, and Supply Chain Management.
China
Zhongshan
Electrical & Electronic Manufacturing
Six Sigma, Cross-functional Team Leadership, Program Management, PMP, Supply Chain Management, Process Improvement
Experience

Program Manager
Zhongshan, Guangdong, China
A. Responsibility 1. NPI: Factory readiness for NPI activities, such as layout, SOP, SW, line qualification plan, UPH, fixture readiness, BOM, material status, and yield. 2. Ramping: Organized manpower (include DL/IDL/vendor resources), material, method, machine (include retrofit, new buy, lend, and re-new strategy), measurement, and budget control. B. Achievements 2018. -Co-led X1/X13/X14 Final Assembly Test and Pack (FATP) main line expansion from 15x lines to 28x within half year (3 projects in 3 buildings). -Established Equipment KO system Architecture and Idle equipment Management system. 2019. -Led X15 project. Set up 7x new FATP main line and upgraded existing sustain line UPH within limit time.

Program Manager
Foxconn
Shenzhen, China
Program Manager (OEM, ODM, IDM, and JV) A. Responsibility 1. Finance: RFQ, budget plan. 2. NPI: Scope management, NPI scheduling, Validation Plan, Program List Control, fail analysis, 2nd Source implement, Shortage Risk Control, and Risk buy. 3. Fulfillment: Urgent pullin, Week of Supply Control, Aging and Excess Resolving, Quality and Design abnormal analysis, and Factory Transition Plan. 4. EOL: Lockdown Forecast, Program Closure, Factory Shut Down. B. Achievements 2008. Hosted OEM network product. 2009. Hosted ODM Blade Server products (BL465). 2010~2012. Established new IDM/ODM PM team for Non-HP products. -Annual Revenue grew from USD$2M to $7M in 2010. -Annual Revenue grew to $17M in 2011. -NPI projects doubled in 2012. 100% ramped on time. 2013. Also acted as Business PM and Engineer PM for Home Security Device. -Reported to General Manager of FXN Server Group. -Ramped up with limit resource on time. 2014. Terminated Shenzhen site and projects due to organization strategy direction changed. -Saved $280K by deal with implicit cost in advance when closing projects. 2015~2017. Managed JV Engineer PM. -Brought up projects with limited resources (4 PM for 8 projects at critical time) on schedule.
Jun-Wei Kuo's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



