Jelle Maes
Superintendent Dredging/Civil @ Jan De Nul Group
Belgium
Aalst
Construction
International communication, Lean Six Sigma, Leidinggevende, Teamwork, SolidWorks, Microsoft Office, maritime, Abaqus, Microsoft Excel, Microsoft Word, PowerPoint, Teambuilding, Spreken in het openbaar, Engels, Frans
Experience

Superintendent Dredging/Civil
Verenigde Arabische Emiraten
Al Omairah Island is a major artificial industrial island being built offshore Abu Dhabi for ADNOC as part of the Lower Zakum oil field development. - Sand reclamation: 23 million m³ - Rock installation: 6 million ton - Accropode II units: 36.000 units - Breakwater installation: 760 meter - 3 quay walls

Supervisor Maintenance & Reliability
Gent, Vlaanderen, België
- Team Leadership: Lead a skilled team of 6 maintenance technicians, electrical and mechanical. Participate in engineering team of Chevron lubricant plants in Europe, Middle East and Asia. - Maintenance Strategy: Led the integration and improvement of an SAP CMMS system in GBP plant. - Budget Oversight: Administer the annual maintenance budget, implementing cost-saving initiatives that have lowered expenses by 15% while maintaining optimal equipment performance. - Process Optimization: Introduced pump rate improvements via Lean Six Sigma. - Safety & Compliance: Rolled out LOTO including training of all personnel involved. - Project Management: Managed €2 million in facility improvements, completing projects on time and within budget, allowing to produce more volume and higher complexity of products. - Sustainability: Implemented initiatives for greener energy and lower consumption. Continuously improving and electrifying the equipment and facilities. Installing PV (10% of total yearly electricity consumption). Participating in VOKA initiatives. - Waste management: Selected to share one of our waste management initiatives in the Chevron Corporate Sustainability Report of 2023.

Technical Superintendent Vessel Maintenance
Worldwide
As a Technical Superintendent, I helped to make sure that the vessels in the offshore fleet were technically operational at all times. My main tasks and responsibilities included: - Coordinating multiple technical maintenance and repair works. - Verifying reports, repair lists and request forms. - Reserving dry docks and contacting local subcontractors. - Preparing and follow up of repair periods (up to €1.8 million). - Keep an eye on stock management. - Responsible for realisation of a mobilisation or demobilisation. - Motivating vessel and yard technical personnel. Vessels I worked on: - Jack-up vessels: Vole au Vent, MPI Adventure - Cable lay installation vessels: Isaac Newton (10.700 ton capacity) - Trenchers: Jet trencher PT1, Trenching ROV UTV1200, Intertidal Trenching Vehicle Moonfish - Subsea rock installation vessels: Simon Stevin (31.500 ton capacity), Pompeï (1.350 ton capacity), Tiger (3.700 ton capacity) - Multi purpose vessels: Daniel Bernoulli (5.950 ton capacity), Adhémar de Saint-Venant (5.950 ton capacity) - Hopper dredger: Al-Idrisi (7.500m3 capacity)
Jelle Maes's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.





