Ir Lim Kean Seng Pepc

Ir Lim Kean Seng Pepc

Site Facilities Operation Manager

Country

Malaysia

City

Penang

Industry

Semiconductors

Skill

Facilities Mechanical System Operation + Engineering, Semiconductors, Semiconductor Industry, Design of Experiments, Clean Rooms, Engineering, Sensors, Minitab, Troubleshooting, FMEA, SPC, Energy Management, Energy Conservation, SAP PM, Kepner-Tregoe, Disaster Management, Refrigeration, Project Management, Commissioning, SAP

Experience

Google Data Center - Malaysia

Site Facilities Operation Manager

Google Data Center - Malaysia

2025 - Present · 1 yr

Sungai Buloh, Selangor, Malaysia

Intel Malaysia (Advanced Packaging Facilities)

Electrical, Instrument & Control and LSS Area Manager

Intel Malaysia (Advanced Packaging Facilities)

2022-7 - 2025-1 · 2 yrs 7 mos

Penang, Malaysia

OSRAM

Senior Facilities Manager

OSRAM

LinkedIn
2017-11 - 2022-7 · 4 yrs 9 mos

Kulim

Facility Department Head Responsibilities: - Leading & Managing facility team for Wafer Fabrication Plant (include EPI Process) all utilities supply (Building, Electrical, Mechanical, Process - Gases/ UPW/ IEST and etc.) A. Leadership 1. Driving facilities Value Add spirit at FM team to stakeholders. 1.1 Utilities consumption profiling, monitoring and close loop feedback to user on abnormality detection and preventing interruption to production. 1.2 Facility Systems Process Capabilities Monitoring and enhancement 2. Growing, Coaching and Mentoring leaders B. Technical & Project 1. Project Manager for FEK2 (Green Field) - Site Master Plan - Requirement and Compliance. - Logistic Flow Review - Utilities Systems Design review. - Procurement Management - Construction Management - New Project and Operation Team Management 2. Assistant Project Manager member for Design Brief / FEED - green field (2017) - Site Master Plan - Requirement and Compliance. - Logistic Flow Review - Utilities Systems Design review. 3. Project Design Team Technical Support C. Strategy Management 1. Established Facility 5 years Systematic Objective Road Map integrated with OSRAM FEK GM direction of Data, Logic & Value. 2. Managing Facility Team Objective maturity level development 3. Establishing comprehensive Facilitiy Recovery Process Management (In progress) D. Finance 1. Managing departmental OPEX & CAPEX 2. Departmental Cost Optimization & Energy/ Resource Conservation E. EHS 1. Situation Management Project Leader 2. EHS Council Committee 3. Internal Auditor

B Braun Medical

Senior Facilities Manager

B Braun Medical

2016-9 - 2017-11 · 1 yr 3 mos

1) Manage Facility Mechanical Maintenance team that is supporting 10 buildings (include 5 factories) - Established Departmental Road Map and Maturity Assessment - Leading team to improve the facility operation team's knowledge and skill - Leading team to support the Pharmaceutical plant mechanical system buy off and issues rectification. - Leading team on maintenance contract strategy and complete tender process. 2) Non-manufacturing Safety & Health Council Member 3) Facilities Representative for ISO 14001 certification 4) Supporting the continuous improvement program. 5) Managing departmental capital expenditure and operational expenses. 6) Leading the team member for energy conservation projects implementation 7) Leading the mechanical workshop team to support the customers demand and value add to them. - Successfully impressed OSHA auditor in July 2017 and became the only area that received recognition at closing meeting.

TAL GROUP - PEN APPAREL Sdn Bhd (Malaysia)

Engineering and Maintenance Senior Manager

TAL GROUP - PEN APPAREL Sdn Bhd (Malaysia)

2014-10 - 2016-9 · 2 yrs

Penang

1) As department head to manage Facility team, EHS team and Maintenance group 2) Leading a team of 57 ppl and 3 managers. 3) Managing EHS, facilities and maintenance operation for 2 factories. 4) Supporting the continuous improvement program to further enhance production output and quality control. - Implemented safety interlocking control at machines to eliminate operators injuries. - Lead maintenance team to implement SMED concept. 5) Managing departmental capital expenditure and operational expenses. 6) Managing Emergency Response Team operation and enhancement

TAL GROUP

Facilities Project Manager (Regional)

TAL GROUP

2013-7 - 2014-12 · 1 yr 6 mos

1) Facilities Policy Management 2) Energy Conservation Management 3) Facility Supplier Management 4) Facility Project Management 5) Working with 10 factories facility team across Asia on CAPEX & OPEX projects & implementation.

OSRAM

Facility Specialist Engineer cum Section Head

OSRAM

LinkedIn
2007-11 - 2013-7 · 5 yrs 9 mos

a) Wafer Fab Pioneer Start Up Team b) System owner for Clean Room ISO Class 5 (100) & ISO Class 7(10K), HVAC & Clean Room, OFA/CDA, Vacuum, chilled water system, condenser water system (include water treatment systems) c) As a Leader for energy conservation team at Front End team d) Advising the system control philosophy for mech systems during start up e) Supervisor for mech. Engineers & matrix supervising 5 mechanical technicians. f) Leading the SAP PM implementation Facilities Equipment Maintenance. g) Execute systems testing, balancing & commission and start up for the mech systems. i) As assistant project manager to facilities manager for production expansion project j) Mechanical design and construction lead for Phase 2 expansion project; - Design review for clean room (class 100,10K & 100K), mechanical systems and system operation control philosophy - Project tendering (technical), - Construction management; system testing and commissioning. - Noise & vibration control review for phase 2 expansion project Project involved: a) PM for vibration rectification in office from plant room b) Clean Room Pressure Cascading Control project c) Clean Room MAU Centralization Project d) PEN3 gowning room construction project e) Chemical Mixing Room, Flammable gas room and toxic gas room construction project f) Phase 2 expansion low temperature chilled water system g) VSD chiller implementation for medium temperature chilled water system h) Heat pipe implementation for sub fab MAU i) Clean Room 100 & 10K Centralization for project j) Cooling tower reused water optimization project k) PEN31 Subfab HVAC Optimization l) Clean Room 100 MAU & Clean Room 10K MAU centralization m) Design and execute the emergency staircase pressure relief control system. o) PEN32 Q-Lab Capacity Expansion Project p) PEN32 10K clean room – EOL relocation and new production project q) PEN32 CR 10K & CR 100K Control improvement Projects

Intel

Facility Senior Engineer

Intel

LinkedIn
2005-7 - 2007-11 · 2 yrs 5 mos

Responsibilities: System owner for HVAC Wet Systems for 2 manufacturing & office building (PG7 & PG8) ;Clean Room ISO Class 8 ( 100K) & HVAC Dry Systems ( Air Conditioning, Exhaust, OFA): Wet system included - Process Cooling Water, Chilled Water, Condenser Water and its’ including water treatment & Process Vacuum. - To sustain the performance of the systems; - To do 3rd level trouble shooting on systems abnormality. - To improve the reliability of the systems to ensure zero interruption to production; - To involve in progressive build for capacity study (long range planning), scenario study and systems design modification. - To do system operation & functioning test during system start up. - To establish & review on Response Check List (RFC) for shift technician on system abnormalities. - To lead & review Failure Mode Effect Analysis (FMEA) for systems. - To develop & review on systems operating document procedure (ODP). - To initiate & lead to do energy conservation project at systems. Project Involved: a)Haze Solution Project (Jun 2006 – Sept 2006): - DOE team member - Site Project Manager (PG8) b)Heated Dryer Project (Sept 2006 – Jan 2007) – Project Manager c)Implementation Team for Proactive Excursion Management System d)Exhaust Task Force key member e) PG8 Quarterly Progressive built Projects and also Base build Project f) Data Center Ventilation Improvement Project ( As Designer & Project Manager) -(savings around USD 20K/year) g) PG8 Chiller Optimization Project (savings around USD 101K /year) h) PG8 Heated Dryer EC Project i) PG7 Compressor Cooling Tower Replacement Project. j) PG7 & PG8 Quarterly Progressive built Projects and also Base build Project

Ir Lim Kean Seng Pepc's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.