Hussam Habbabah
Director Project Management Office (PMO) @ Azhar Holding
About
PMO Director with over 20 years of experience in Saudi Arabia’s construction industry, including more than a decade in program and project management. Skilled in leading the delivery of fast-track, large-scale developments across aviation, metro, high-rise, luxury hotels, real estate, healthcare, and mixed-use sectors. Successfully managed portfolios exceeding SAR 9 billion, consistently delivering projects on time and within budget. Known for value-aligned, data-driven frameworks that accelerate execution, resolve interface challenges, and elevate performance through a culture of continuous improvement across complex portfolios. 𝗦𝗽𝗲𝗰𝗶𝗮𝗹𝗶𝘀𝘁 𝗦𝗸𝗶𝗹𝗹𝘀 • 𝗣𝗿𝗼𝗴𝗿𝗮𝗺 & 𝗣𝗼𝗿𝘁𝗳𝗼𝗹𝗶𝗼 𝗠𝗮𝗻𝗮𝗴𝗲𝗺𝗲𝗻𝘁: Strategic Alignment | PMO Setup | Governance | Benefits Realization • 𝗕𝘂𝗱𝗴𝗲𝘁 & 𝗙𝗶𝗻𝗮𝗻𝗰𝗶𝗮𝗹 𝗠𝗮𝗻𝗮𝗴𝗲𝗺𝗲𝗻𝘁: Budget Control | Financial Forecasting • 𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝗖𝗼𝗻𝘁𝗿𝗼𝗹𝘀 𝗢𝘃𝗲𝗿𝘀𝗶𝗴𝗵𝘁: Schedule Compliance | Cost Forecasting | Risk Assessment | Change Control • 𝗠𝗘𝗣 𝗦𝘆𝘀𝘁𝗲𝗺𝘀 𝗘𝘅𝗲𝗰𝘂𝘁𝗶𝗼𝗻: Installation | Testing & Commissioning • 𝗣𝗲𝗿𝗳𝗼𝗿𝗺𝗮𝗻𝗰𝗲 𝗠𝗼𝗻𝗶𝘁𝗼𝗿𝗶𝗻𝗴: KPIs | OKRs | EVM | Dashboard Reporting • 𝗦𝘂𝗯𝗰𝗼𝗻𝘁𝗿𝗮𝗰𝘁 𝗠𝗮𝗻𝗮𝗴𝗲𝗺𝗲𝗻𝘁: Scope Compliance | Performance Oversight | Interface Management • 𝗦𝘁𝗮𝗸𝗲𝗵𝗼𝗹𝗱𝗲𝗿 𝗘𝗻𝗴𝗮𝗴𝗲𝗺𝗲𝗻𝘁: Client Liaison | Government Coordination | Conflict Resolution • 𝗣𝗠𝗜𝗦 𝗧𝗼𝗼𝗹𝘀: Aconex | Power BI | Smartsheet | Asana | Trello 𝗞𝗲𝘆 𝗣𝗿𝗼𝗷𝗲𝗰𝘁𝘀 • 𝗔𝘃𝗶𝗮𝘁𝗶𝗼𝗻: King Abdulaziz International Airport (KAIA), Jeddah • 𝗠𝗲𝘁𝗿𝗼: Riyadh Metro (Line 2), Riyadh • 𝗟𝘂𝘅𝘂𝗿𝘆 𝗛𝗼𝘁𝗲𝗹𝘀 (𝗠𝗮𝗿𝗿𝗶𝗼𝘁𝘁): The St. Regis Riyadh | The Jeddah Edition • 𝗥𝗲𝗮𝗹 𝗘𝘀𝘁𝗮𝘁𝗲: High-Rise Buildings (KAFD), Riyadh | Belar Residential Complex, Jeddah• • 𝗠𝗶𝘅𝗲𝗱-𝗨𝘀𝗲: Riyadh Boulevard City | Boulevard World | Via Riyadh | World Defense Show Venue, Riyadh • 𝗛𝗲𝗮𝗹𝘁𝗵𝗰𝗮𝗿𝗲: Royal Hospital, NEOM #Vision2030 #SaudiConstruction #GigaProjects #SaudiProjects #KSIA #Expo2030 #KSAJobs #PMODirector #ProgramManagement
Saudi Arabia
Riyadh
Construction
MEP, Strategic Project Management, Performance Management, Key Performance Indicators, Performance Improvement, Construction Management, Project Portfolio Management, Programme Delivery, Project Management, Fast-Track Project Delivery, Lean Construction, PMO set-up, Project Governance, Driving Results, Project Development, Infrastructure Project Management, Real Estate Development Projects, Earned Value Management (EVM), Risk Analysis, Technical Support
Experience

Director Project Management Office (PMO)
Jiddah, Makkah, Saudi Arabia
I led the project delivery of key real estate developments, including the Belar Residential project (180,000 m²) and the Al-Kawthar Community, phase 1 (151,000 m²), valued at SAR 1.5 billion. I delivered two fast-track projects in Mecca in two months, resulting in a 20% increase in client inquiries. I developed a PMO strategy aligned with organizational goals, enhancing program management and improving project delivery efficiency by 30% while increasing stakeholder satisfaction. I established governance frameworks and compliance standards that improved delivery accuracy by 40% through regulatory adherence. Additionally, I directed resource allocation, optimized utilization by 20%, and ensured that projects were completed on schedule and within budget. I conducted risk assessments on 10 critical projects, reducing risks by 30% and safeguarding budgets through continuous improvement.

Director Project Management Office (PMO)
Riyadh, Saudi Arabia
I managed the delivery of 17 fast-track, complex projects across Riyadh and Jeddah, including major mixed-use developments such as Boulevard City (800,000 m² in 118 days) and Boulevard World (900,000 m² in 180 days). I also led the development of VIA Riyadh and two luxury Marriott hotels—The St. Regis Riyadh (83 keys) and The Jeddah Edition (63 keys)—all delivered 100% on time and within a $2 billion budget. To ensure strategic alignment and benefit realization, I implemented robust portfolio management strategies and stage-gate governance. These efforts increased program success rates by 17%. I also oversaw program controls and launched live KPI scorecards across all projects, enabling real-time tracking, contractor accountability, and early risk detection. This approach enhanced delivery performance by 25%, improved operational efficiency by 20%, and prevented SAR 9M in penalties through risk burn-down workshops. I introduced cross-project interface governance, mapping over 220 dependencies and enforcing milestone-based incentives. This safeguarded SAR 18M in zone revenue and achieved 98% on-time handovers. Dynamic resource reallocation protocols accelerated critical path progress by 15 days. Agile delivery was supported by real-time impact radars that visualized the cascade effects of change on schedule and cost, enabling faster decisions, rejecting high-risk changes, and preserving overall program momentum.

MEP Project Manager
Riyadh, Saudi Arabia
I directed the finalization and commissioning of MEP works for a fast-track project of seven high-rise buildings at the King Abdullah Financial District (KAFD), covering 340,000 m², with a total contract value of SAR 1 billion. I optimized resource allocation and adjusted timelines, achieving a 4% cost reduction while delivering key milestones ahead of schedule. I led change management negotiations, securing approvals for SAR 90 million variations and 120 additional days on the project timeline. I also increased MEP progress by 15% in 90 days, managing 2,000 workers and 10 subcontractors to ensure adherence to quality standards and project timelines.

MEP Project Manager
Riyadh, Saudi Arabia
Managed the installation and commissioning of MEP systems and medical gases for the fast-track Royal Hospital project in Neom, completing it one month ahead of the six-month schedule and under budget. Directed over 300 personnel and coordinated with four subcontractors, addressing logistical and supply chain challenges in a remote location, which proved pivotal in minimizing delays and improving overall project efficiency. Prioritized safety regulations, ensured quality assurance, and controlled the budget, achieving a 15% cost reduction while maintaining high standards of quality and client satisfaction. Developed a robust risk management approach that facilitated early detection and resolution of issues, contributing to a 5% decrease in project completion time and optimizing resource allocation and tracking. Enhanced procurement strategies, reducing delivery times by 35% to ensure the availability of critical materials. Maintained strong stakeholder relationships and aligned expectations through negotiation and engagement, which proved vital for navigating project complexities and ensuring smooth execution. Promoted to the Project Management team in the Riyadh office, overseeing MEP works across all projects in Saudi Arabia. By monitoring and analyzing KPIs, I optimized productivity, improved team performance, and ensured strategic resource allocation. A focused approach to project management and precise risk mitigation delivered exceptional project outcomes.

MEP Package Manager
Riyadh, Saudi Arabia
Directed the installation and commissioning of MEP systems across 10 surface and shallow metro stations for the Riyadh Metro Project (Line Two), managing contracts valued at over SAR 470 million. Ensured compliance with stringent project specifications, safety regulations, and client expectations while maintaining high operational standards throughout the project lifecycle. Developed and executed strategic roadmaps to optimize resource allocation and manage budget, timeline, and scope changes, resulting in a 6% cost saving through enhanced alignment of installations with project objectives. By analyzing KPIs and implementing Aconex for documentation and communication, I monitored project performance, identified areas for improvement, and enacted corrective actions to maintain momentum. Liaised with subcontractors to ensure adherence to contractual obligations. Through rigorous performance assessments and compliance reviews, enforced contract terms, guaranteeing deliverables on schedule, and high-quality outcomes. This risk mitigation strategy, along with comprehensive risk and issue monitoring, proved vital in eliminating potential roadblocks and ensuring project success. Fostered collaboration among stakeholders, subcontractors, and vendors to ensure that all parties met deadlines and aligned their efforts with the project’s quality standards. Expertise in MEP project management, coupled with effective use of dashboards for progress monitoring, proved instrumental in achieving 90% of project objectives on schedule. In summary, my leadership within the BACS Consortium on the Riyadh Metro Project, a landmark infrastructure giga project, highlights my expertise in driving complex, large-scale initiatives to successful completion while maintaining a focus on quality and efficiency.

Senior Project Engineer (MEP)
Jeddah, Makkah, Saudi Arabia
I led the installation and commissioning of MEP systems for the 265,000 m² Passenger Terminal Building at King Abdul Aziz International Airport (KAIA), ensuring seamless integration with the baggage handling system (BHS) and compliance with international standards. I achieved a 97% on-time project completion rate by optimizing schedules, resolving technical challenges, and upholding strict quality and safety measures. I managed resource distribution for a 350-member team and three subcontractors, aligning tasks with project milestones and driving a 20% improvement in productivity. I facilitated workshops to address key challenges, implemented solutions that minimized disruptions, and advanced project timelines. By maintaining strong communication with clients and stakeholders, I ensured alignment on project objectives and progress. Throughout my four years on this large-scale infrastructure project, I played a pivotal role in construction management and coordination, overseeing the integration of complex MEP systems. I facilitated collaboration among diverse teams, optimized workflows, and maintained oversight of project timelines and resource allocation. My experience in the aviation sector has provided me with a comprehensive understanding of terminal operations, including key components such as baggage handling systems (BHS), security facilities, and terminal MEP integration. This expertise in terminal requirements and international standards enables me to contribute to large-scale airport terminal projects, ensuring seamless system integration and operational excellence.

Mechanical Engineer
Thuwal, Makkah, Saudi Arabia
At King Abdullah University for Science and Technology (KAUST), I led the installation, testing, and commissioning of mechanical systems and medical gases in 10 advanced research laboratories. I conducted regular site visits to monitor progress, ensuring we stayed on schedule and reduced project delays by 15%. I supervised a team of 173 personnel, optimizing resources and completing the project 10% under budget. Through careful planning and risk assessments, we maintained a zero-incident safety record. My collaboration with the commissioning team and stakeholders resulted in a 95% client satisfaction rating. Additionally, I managed the documentation process, ensuring the accuracy of essential project documentation and operation manuals for the laboratory systems. This experience enhanced my mechanical engineering skills and improved my project coordination and stakeholder communication abilities.

Mechanical Engineer
Hisham Albaz Est.
Jeddah, Makkah, Saudi Arabia
In my inaugural role as a Mechanical Engineer, I facilitated the installation, testing, and commissioning of mechanical systems for a sewage treatment plant with a capacity of 17,000 m³/day (Phase I). I ensured full compliance with quality standards and project specifications from the outset, driving project success. A key achievement involved negotiating with suppliers to secure cost-effective materials, resulting in a 10% reduction in project costs. I managed a workforce of 100 personnel, optimizing resource allocation and enhancing productivity by 12%. I closely collaborated with electrical and civil engineering teams to ensure seamless integration of systems. I regularly led meetings with clients, consultants, and construction teams to provide project updates and address emerging issues. Additionally, I developed and reviewed mechanical design documents, drawings, and technical specifications, ensuring alignment with project requirements. Safety remained my top priority, and I strictly adhered to safety protocols during installation and commissioning activities. As the project neared completion, I facilitated the handover process by preparing detailed documentation and conducting inspections to verify system performance, ensuring a smooth transition to the operations team.
Hussam Habbabah's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


