Gerald Kaendler
Executive Vice President European Affairs @ Amprion GmbH
About
I am convinced that Europe’s future power system can be climate‑neutral, secure and affordable if the key actors play in the same rhythm. My professional background is in asset management, system planning and greenfield operations for a Transmission System Operator (TSO). For many years I have worked internationally – with other TSOs, in European projects and in bodies such as ENTSO‑E. My focus is to combine technical system expertise with a European perspective: developing solutions together with partner TSOs and other European stakeholders, and shaping positions so that they stand up in Brussels and in international expert fora. The objective is a European power system that is secure, affordable and climate‑neutral – enabled by international cooperation. I work towards this with fact‑based analysis, reliability and open, trust‑based cooperation with European partners.
Germany
Dortmund
Utilities
Systemplanung, Planung elektrische (Übertragungs-) Netze, Englisch, Management, Nachhaltigkeit, Investitionen
Experience

Director Asset Management
Dortmund
The Asset Management was set up with a new focus as of October 2020. Asset Management includes System Planning (how can the system look in 10..20..30 years?), Asset Planning (Life Cycle Management of the assets and planning of the grid, budget control), Operations (maintenance) and Telecommunications (planning and operation of the internal telecommunications network).

Director Asset Management
Dortmund
Focusing the Amprion Asset Management on the challenges of the energy transition: long-term grid development, life cycle management and budget control. Permitting for power line projects (AC lines and DC lines) was one of my greatest challenges. Project portfolio: https://www.amprion.net/Grid-expansion/Our-Projects/. The project volume has quintupled in that time ... and the team has grown even more.

Director Asset Management
RWE Transportnetz Strom GmbH
Dortmund
Implementation of Asset Management processes: Grid Design, Life Cycle Management, Budget Management. In addition, the public permitting procedures for extra high voltage power lines were part of the Asset Management.

Senior Manager Grid Strategy
RWE Netz AG
Dortmund
Development of the Asset Management System and the grid strategy for RWE Net from distribution (380 V) to transmission level (380.000 V).
Gerald Kaendler's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



