Farhan Ali
Electrical Engineer QA/QC @ SINOHYDRO GROUP LIMITED
Saudi Arabia
Jeddah
Information Technology & Services
QC Tools, Quality Management, Quality Control, Calibration, Testing, Commissioning, Engineering, Design Documents, Electrical Testing, Maintenance Management, Electrical Maintenance, Electrical Engineering
Experience

Electrical Engineer
Saudi Arabia
Supervise the installation of 13.8kV transformers, ensuring safety and engineering compliance. Manage installation, commissioning, and operation of 33kV/17.5kV RMUs. Deploy 17.5kV/33kV LBS on overhead lines for circuit isolation and fault management. Inspect and supervise cable terminations (50mm² to 500mm²) to meet quality standards. Inspect, configure, and integrate RTUs for RMUs and LBS for control center communication. Conduct SAT for RMUs, LBS, and transformers, ensuring technical and regulatory compliance. Inspect transformers, RMUs, and LBS for design, efficiency, and safety compliance. Validate RFI documentation for T/F, RMUs, and LBS, ensuring readiness for deployment. Installed and commissioned Smart Ring Main Units (RMUs) with remote monitoring and control capabilities Integrated RMUs with SCADA systems for real-time data acquisition and fault diagnostics Conducted cable termination, HV/LV connections, and system insulation testing Ensured compliance with safety standards and local electrical codes Performed functional testing and validation of all equipment post-installation

Electrical Engineer
Jeddah, Makkah, Saudi Arabia
1. Expertly installing electrical panels, transformers & electrical equipment, while preparing project documentation, and shop and as-built drawings. Conducting quality check of site with respect to shop drawings and specifications 2. Assisting in material submission as per project specifications, while executing material inspection in liaison with client and consultant as per approved materials. Installing instruments, control valves and electrical equipment 3.Executing maintenance of airport ground services, including ground power units, pre-conditioned air, potable water pumps/valves, blue water pumps/valves, vacuum and plant rooms to participate in process improvements 4. Coordinating with site team to execute the site work as per approved plan, while handling testing & commissioning of electrical panels, including motor starters. Resourcefully supporting in termination of electrical & control wiring 5- Installing cables, trunks and instruments, while planning, scheduling and controlling routine well within allocated time. Developing plans for daily, weekly and monthly work, while organizing daily toolbox talk to explain target of day and safety and technical requirements to execute target job assignments in accordance with company’s policies
Farhan Ali's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.



