My career has evolved from structural design and field engineering to enterprise-level capital governance—across Design-Bid-Build (DBB), EPC, multinational project delivery and owner-side environments, ultimately leading to the establishment of two corporate PMOs. Over 23 years, I have built an end-to-end understanding of how capital projects succeed: engineering and constructability, design management, procurement and contracts, project controls, commercial management, construction and commissioning, risk, investment evaluation and portfolio governance. That breadth allows me to operate at both levels that matter—challenging the engineering on the ground while helping executives make better capital decisions. My experience spans industrial manufacturing, power, infrastructure and real estate, including dams and hydropower, power generation and transmission, greenfield manufacturing facilities, brownfield developments, institutional assets, workplace and retail environments. I have worked across Pakistan, Qatar, Iran and South Africa, with owners, designers, consultants, contractors, EPC organisations, lenders, regulators and multinational operating teams. Today, my focus is capital productivity: strengthening investment governance, improving cost and schedule certainty, managing commercial and contractual exposure, embedding accountability, and building project organisations that deliver consistently. My leadership sits at the intersection of projects, infrastructure, facilities and sustainability—where disciplined governance, strong engineering judgement and commercial rigour convert capital expenditure into long-term business value.
Pakistan
Lahore
Construction
Project Portfolio Management, Capital Project Management, Project Management Office (PMO), International Project Management, Cross-Cultural Communication, Cross Cultural Management, Sustainability, Energy Efficiency, Work Breakdown Structure (WBS), Fit-out, Contractor Liaison, Change Orders, Crisis Management, Construction, Operational Excellence, Environment, Health, and Safety (EHS), Budget Management, Transmission Lines, Tendering & Negotiation, Power Plants
Experience

Head of Projects and Infrastructure
Lahore
Established and lead the Group PMO, reporting to the Group CEO and governing seven capital projects representing USD80.6M in aggregate CAPEX, from business case and stage-gate investment approval through execution, commissioning and benefits realisation. • Achieved ≈3% CAPEX reduction across five projects through value engineering, procurement strategy, budgeting discipline and commercial cost control. • Reduced cumulative contractor claims by 74% through FIDIC entitlement analysis, structured change control, contemporaneous records and negotiated settlements, with claims closed without arbitration. • Lead a ~50-person Projects & Facilities organisation, 50+ vendors and contractor workforces exceeding 500 across a multi-site portfolio. • Lead industrial, infrastructure and real-estate investments from feasibility and budgeting through procurement, construction, commissioning and handover, including 70,000+ sq ft of retail and workplace fit-out. • Introduced MS Project, Power BI, EVM reporting and AI-enabled workflows to strengthen visibility across cost, schedule and risk for executive decision support. • Advise Group leadership on capital allocation, stage-gate investment approvals, project risk, commercial exposure and major delivery decisions. • Lead facilities management across 8 sites spanning 3M+ sq ft, with USD2–3M annual OPEX, covering asset lifecycle planning, maintenance strategy, service-level performance, resilience and business continuity. • Lead sustainability and green-building initiatives across legacy assets, including EDGE certification programmes, energy and water-efficiency improvements, and integration of resource-efficiency criteria into capital planning and facilities management. • Improved facilities service resolution to 92% and end-user satisfaction from 2.9 to 4.7/5, while strengthening site resilience through targeted infrastructure, drainage and asset-protection interventions.

Head of Project Department
Lahore
Established the corporate PMO reporting to the Group CEO and led a USD100M+ multi-site capital development programme spanning industrial manufacturing, pharmaceuticals and institutional developments. Oversaw projects end-to-end across design and engineering coordination, procurement and contracting, civil and MEP construction, process-equipment integration, project controls, commercial management, commissioning readiness and executive reporting. • Delivered the Daewoo Battery greenfield manufacturing facility (≈USD57M) in Faisalabad. • Advanced the Hi-Tech Alloy Wheels manufacturing facility (≈USD29M) through multidisciplinary construction and pre-commissioning, including integration of process plant and equipment sourced from Australia. • Led development of the Institute for Art & Culture campus (≈USD13M) in Lahore, a 15+ acre purpose-designed higher-education development. • Advanced development of the Renacon Pharma greenfield manufacturing facility (≈USD9M) in Faisalabad. • Managed interfaces with statutory and regulatory authorities for project approvals, including EPA/EIA requirements, alongside claims/variations, environmental compliance and ISO 45001/14001 frameworks.

Unit Manager
Kot Addu, Muzaffargarh- Pakistan
Served as the owner’s representative within the PMO during EPC delivery of the 118.8 MWe coal/bagasse cogeneration complex (≈USD235M), overseeing project interfaces, progress, risk, EVM-based performance monitoring and executive reporting across the development. • Led owner-side coordination across the power plant, utilities and associated infrastructure, interfacing with EPC contractors, consultants and internal stakeholders on engineering, construction, schedule and commercial priorities. • Oversaw delivery interfaces for the 37 km, 132 kV double-circuit transmission line connecting the complex to the New Muzaffargarh grid station, including right-of-way and external stakeholder interfaces. • Coordinated with the lender consortium and technical advisers on progress, technical reviews and project-compliance requirements. • Managed interfaces relating to EIA, land acquisition, statutory approvals and community-impact matters associated with the development.

Project Construction Manager
Lahore
Led construction delivery of the 30 MWe / 150 TPH biomass power project (≈USD65M), with responsibility for multidisciplinary construction, contractor coordination, quality, HSE, constructability and commissioning readiness. • Oversaw civil, structural and infrastructure works and interfaces with the boiler, turbine-generator, biomass handling, utilities and balance-of-plant systems. • Managed delivery of a 4 km PPP road, including right-of-way management, community engagement and issue resolution, completing stakeholder interfaces without litigation. • Directed construction of associated warehousing, PEB structures, firefighting systems, effluent infrastructure and material-handling facilities. • Coordinated contractors, consultants, OEMs and site stakeholders on schedule, multidisciplinary interfaces, quality, HSE and readiness for commissioning. • Worked within a multinational investment environment backed by World Bank Group/MIGA, with associated environmental, social and governance requirements.

Global Facility Optimization Assignment
South Africa
Selected for Tetra Pak’s global facility optimisation initiative, focused on improving lifecycle performance, energy efficiency and operational effectiveness across manufacturing facilities. • Assessed plant layouts, logistics flows, HVAC systems and facility infrastructure to identify design and operational improvement opportunities. • Developed optimisation concepts with potential lifecycle savings of approximately USD2M per facility, including energy reduction, heat-loss minimisation and more efficient infrastructure utilisation. • Worked with globally distributed engineering and operating teams, strengthening experience in international facility standards, value engineering and cross-cultural collaboration.

Site Project Manager
Iran
Led the site team for development of Tetra Pak’s Tabriz manufacturing facility, completing Phase 1 and progressing design and engineering for the planned next phase within an increasingly challenging political and economic environment. • As the sole expatriate project leader, led and sustained a local multidisciplinary team through nearly two years of uncertainty, maintaining team cohesion, motivation and delivery readiness despite escalating external constraints. • Managed civil, architectural, MEP and facility-infrastructure delivery, together with design coordination, contractors, quality, HSE, schedule and multidisciplinary interfaces through completion of Phase 1. • Navigated significant regulatory, commercial, banking, procurement and stakeholder constraints, working within corporate compliance requirements to mitigate the operational impact of the rapidly changing sanctions environment. • Phase 2 was ultimately shelved by the company amid the prevailing sanctions and economic environment, despite substantial design and project-development work having been completed.

Construction Project Manager
Pakistan
Led construction management of Tetra Pak’s Lahore-2 greenfield aseptic packaging-material manufacturing facility, a €92M (≈USD128M) investment. At inauguration, it was Tetra Pak’s largest factory in the Middle East, with initial production capacity of 8 billion packages annually and provision for expansion to 16 billion. • Directed multidisciplinary delivery across civil, structural, architectural, MEP, utilities and site infrastructure, coordinating designers, contractors, suppliers and internal manufacturing stakeholders through construction and operational handover. • Delivered the 24-month programme four months ahead of baseline, recording EVM performance of SPI 1.20 and CPI 0.99, combining accelerated schedule delivery with near-budget cost performance. • Led constructability, quality, HSE and multidisciplinary interface management, including coordination between facility systems, utilities and production/process-equipment requirements. • Managed commissioning readiness, project close-out and transition to operations, with test production commencing ahead of formal inauguration. • Delivered facility infrastructure and fire-protection requirements in accordance with Tetra Pak global engineering and FM Global loss-prevention standards.

Lead Engineer
Lahore
Led site execution of civil and mechanical construction packages within Wärtsilä’s €131M, 200 MWe Nishat Chunian Combined-Cycle Power Project. • Held P&L responsibility for PKR218M (≈USD2.8M) of project packages, managing cost, productivity, resource deployment, subcontractor performance and commercial delivery. • Managed civil, structural, mechanical and infrastructure works, coordinating construction, quality, HSE and schedule interfaces. • Led site workforces of up to 500 personnel in a fast-track EPC power-project environment.

Structural Design Engineer
Pakistan & Qatar (Outsourced to Technip)
Built a rigorous five-year foundation in structural engineering and design, developing major reinforced-concrete and steel structures for dams, hydropower and industrial EPC projects in Pakistan and Qatar before progressing into construction and project leadership. • Designed major structures for the ≈USD100M Mirani Dam, including elements associated with the spillway, intake and outlet works, gravity structures, bridges and hydraulic infrastructure. • Performed structural engineering for Satpara Dam, including hydraulic structures, conduits, penstocks and associated reinforced-concrete works. • Undertook structural and field-engineering assignments at Ras Laffan Industrial City, Qatar, covering industrial foundations, tanks, pipe racks and related EPC structures. • Developed capability across structural analysis, reinforced concrete and steel design, constructability, drawings, quantities and field engineering, creating the technical foundation for later multidisciplinary project leadership.
Education
Faraz H. Mirza's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.