Ehab Sousa, CPEng, PgMP, PMP, PMI-RMP, PMO-CP
Director Project Execution Oversight @ Acwa
About
Achievement & Responsibilities in UAE: 1. Preparation of tender documentation in coordination with the client i.e. Meydan. 2. Reviewing technical offers by bidders in line with DEWA standards and client requirements. 3. Attending tender meetings till awarding contract to successful contractor. 4. Conduct Kick-off meeting with relevant stakeholder in order to engage them and gain their commitment to complete the project as per the key milestone. 5. Managing / monitoring design review for all submitted design documents. 6. Deployment / Managing of site supervision team from green energy side. 7. Monitoring all project activities through site consultants in order to maintain project completion within contractual time frames. 8. Coordinating with DEWA, MEYDAN & contractor for all contractual, technical & interface issues. 9. Monitor project progress according to approved baseline. 10. Perform Stakeholder analysis and plan stakeholders management plan in order to effectively manage them and gain support for the project. 11. Holding weekly Project progress meetings with stakeholders to determine work progress, discuss issues, coordinate actions, plan and anticipate future requirements. 12. Review contractor weekly, monthly progress reports to assess the progress and suggest the appropriate action plan. 13. Manage and control changes by following client change management procedure to meet project requirement. 14. Monitor procurement activities with contractor according to procurement plan in order to assure on time delivery for equipment. 15. Monitor / assess risks and evaluate the effectiveness of responses to manage impacts and enhance opportunities on the project. 16. Collect lessons learned and update it in company system.
-
Saudi Arabia
Utilities
Commissioning, Testing, Project Management, Engineering, Project Engineering, Electrical Engineering, Power Systems, Power Distribution, Electric Transmission, Energy Transmission, Transmission Systems, Protection Systems, Power Protection, Protective Relays, Energy
Experience

Project Manager
Saudi Arabia
Project Manager for the following Projects:- -Dynamic Reactive power Compensation at Jeddah North 380 KV S/S -Expansion of Jeddah North West 380 KV S/S Achievement & Responsibilities in KSA: 1. Checking the scheme of local control panels, protection and remote control panels. 2. Witnessing the testing of CT, CVT, VT and auxiliary relays. 3. Bus bar, power transformer, shunt reactor stability test. 4. Supervision of all GIS related tests i.e. purity, gas percentage, leakage, gas density monitoring, CB timing and contact resistance tests. 5. Witnessing High voltage and Partial discharge Tests for 380 KV Switchgear. 6. Reviewing as built schematic drawings pertaining to protection and control schemes. 7. Reviewing base and detail design document pertaining to protection assuring its compliance with tender drawings, SEC standards and scope of work. 8. Settling disputed technical issues between the contractor's designers & design reviewers in light of scope of work and company's technical specification. 9. Coordinating between SEC & Saudi Railway Organization for the technical / contractual interface issues. 10. Reviewing master time schedule for the project & follow up actual progress versus planned one. 11. Evaluating submitted technical deviations in light of scope of work & SEC standard. 12. Coordinating between SEC EHV project department and other SEC departments i.e. protection, telecom, planning. etc. 13. Follow up procurements, factory acceptance tests & FAT approval in order to issue shipment release. 14. Monitoring all project activities through site consultants in order to maintain project completion within contractual time frames. 15. Representing SEC in all interface meetings with contractors & other departments

Acting Project Manager
Saudi Arabia
(1) Project Engineer for 380 KV HHR Project: Construction of Six new HHR 380/110/33/13.8 KV S/Ss, each S/S consist of 380 KV (10) Diameters GIS one and half, (3) 502 MVA power transformers with associated systems in order to supply Saudi Railway Organization with the required power of Harmain High Speed Train plus construction of one (-600) MVAR capacitive / (+200) MVAR inductive static VAR compensators in HHR-1 & HHR-6 substations. (2) Acting Project Manager for 110 Protection Modification Project: Replacement of protection panels in 22 existing substations in Jeddah, Makkah & Taif

Control & Protection Consultant
Saudi Arabia
(1) Protection Site Consultant for Al-Kudmi Project: Construction of new 2 x 502 MVA 380/132/13.8 KV GIS Substation with 09 Bays of 380 KV and 20 Bays of 132 KV with associated systems. (2) Protection Site Consultant for Namerah North 380/132 KV S/S Project: Adding 2 Nos. 380 KV over head lines bays with 2 Nos. of 550 KV outdoor Hybrid Switchgear for 2 Nos. of 80 MVAR shunt Reactor with associated systems in Shoaiba S/S (Remote end for Namerah S/S) (3) Protection Site Consultant for expansion of Shoaiba Power Plant: In order to evacuate power from the stage III expansion of Shoaiba Power Plant, one 380 KV new bay and modification of one spare outgoing circuit in the existing 380 KV GIS are necessary. Two (2) Nos. of 110 KV GIS bays extension are also required for feeding the services transformers in power plant.

Testing and Commissioning Engineer
Electrical Egyptian Transmission Company
Egypt
Achievement & Responsibilities in Egypt: Rectification the trouble Shooting in protection and Control schemes. Upgrade Cairo zone from electromechanical and static relays to digital relays. Executing the periodic Testing and maintenance of the protective relays pertaining to HV line feeders, power transformers, bus couplers and MV outgoing feeders. Adding &testing of new power transformer bays (25MVA, 66/11 KV) and capacitor banks with associated protection systems in Sheraton and Misr El Gedida S/S. Converting 66 KV feeder bay into new power transformer bay in El Gabal El Asfar S/S. Carrying out power transformer stability test, CT test and CT primary injection. Testing &calibration of measuring instruments like voltmeters, ammeters, power, frequency, PF and energy meters and transducers. Representing EETC for witnessing the commissioning of El Rehab new 66/22 KV S/S. Knowledge to communicate with protection relays manually or by operating software methods to apply the final setting as per system requirements. Operating experience of different types of testing and calibrating equipment like primary injection ODEN, secondary injection SVERKER 760, ISA DTR3, CT Analyzer, CPC 100, FREJA and OMICRON. Testing the following relays: ABB over current SPAJ 140 C, SIEMENS over current 7SJ602, ABB distance REL 361, SIEMENS distance 7SA610, GE distance D60, AREVA distance MICOM P441, ABB Transformer differential SPAD 346 C, SIEMENS trans. Diff. 7UT612, GE trans. Diff. DTP, SIEMENS line Diff. 7SD610 , AREVA Restricted E.F.MFAC 14, REC 561, RET 521, SPAJ, SPAE, SPAC 539, RXD HL4, RX I DK, REB and REZ.
Ehab Sousa, CPEng, PgMP, PMP, PMI-RMP, PMO-CP's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.





