Christian Gonzalez
Engineering Supervisor (Injection Molding) @ Thermo Fisher Scientific
About
Engineering, a way of living
Mexico
Tijuana
Research
Engineering, Materials, Manufacturing, Microsoft Excel, SolidWorks, Oracle Agile, Crystal Reports, IFS, Business Process Improvement
Experience

Production Engineer - Components
Munekata Mexicana
Tijuana Area, Mexico
In charge of the raw material of the assembly and Automatic paint departments -Consumptions (physical vs System verification ) -Engineering change implementations -Discrepancies analyst -Inventory counts. -inventory adjustments -Scrap control and continue improvements based on kayzen metodology learned in the internship. -FG captures and backflush monitoring. -Materialists team leader. -Production support. -Synergi group former. -in charge of the Assembly Continue Improvement Quick fixes for Samsung customer requirements. Main Project implementor of: Component Control, Reached by: -Creating a Supermarket: design of a component supplier area near to production floor to get a better control of the component suplied. -Exact deliveries of components to the manufacturing cells according to the size of the lot planned. scrap and bad material had to be returned to get the replacement. -Creating a Water Spider supplier system, where the components were avilable in a transportation car which was circulating among the cells, in order to reduce the time of supplying and production starts. applied for the Assembly and Automatic Painting Departments.

Student Internship
Tijuana Area, Mexico
Working in the Blow molding area as support of the process engineer. Doing activities such as. Proyect 1 -Updating of Device Master Records of Blow Molded products. creating ECO's through agile by Oracle ( more than 600 changes in a period of 3 months. by comparing the current process against the activities reflefected on the documentation DMR's) Proyect 2 -In charge of the hour by hour project. -Data analyst of production (blow molding machines and manpower) performance. -Daily basis report of efficiency in production meetings (Gemba) -Daily basis report of high offenders of the day before. Working in order to be today better than yestarday, tumorrow better than today. -Overall Efficience Equipment (OEE) migration, from production reports, to hour by hour data. This helpped the area knowing the real performance of the machinary and give us the oportunity to focus on the real issues knowing the exactly cause and time of failure. Proyect 3 -Giving daily basis sustaining support to the Blow Molding area helping with activities such as: -Creating work instructions -Updating procedures. -Machine Cycles review. -etc. Extras. 4 PPI Kayzen events former, that helpped the company to reduce costs. and process improvement. 1.-Standar work for materialists . *Diploma obtained 2.-JIT implementation in the bulk products for ULMA machine. *Diploma obtained 3.-JSA corrective action implementation in Blow molding Area. *Diploma obtained 4.-Productivity improvement in the bag packaging area based on Lean concepts. *Diploma obtained.
Christian Gonzalez's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


