Che-wei Huang

Che-wei Huang

Engineer Program Manager @ VanMoof

About

I am Willy Huang, having 6 years working experience in consumer hardware industry and 2 years overseas study in USA. Currently, I am Project manager in VanMoof at Taipei. I was Project Manager lead & Account Manager in PCBA testing vendor in China. In VanMoof, I am the only both NPI and sustaining PM. At NPI, I will need to design module with ID & Engineering team. Also, I will need to drive vendor at scheduling, budget, Quality requirement. At sustaining, I will need to monitor control run and issue ECO internally and externally. Also, I am supporting to build up PLM system. In Trantest, I was PM lead and also Account Manager. Trantest is a PCBA testing fixture company in China. It provides customize testing fixture for SMT & FATP lines. Testing function includes in-circle test, functional test, RF OTA. Due to customizing, Trantest engages the project from design till bring up. I will need to work with different kind of company such as Apple, Facebook, Google at design and bring up with CM such as Foxconn, Pegatron, GTK, ICT, USI, Quanta and so on. As PM, I will need to schedule and follow up the product from design, purchase material, manufacturing, bring up. Due to customizing the fixture, I will need to learn spec requirements from customers and design products with the engineer team. After locked down testing requirement with the customer, I will need to work with EE, ME, SW to provide a proposal as DFM for reviewed. As Account Manager, Cost analysis and quotation will be provided after BOM locked. I need to build relationship and learn fast with engineering team, negotiate purchasing team and visit sourcer team to gain more business opportunity. In 2021, I build up a PM team with 6 members. In Pegatron, I schedule the plan and design a new repair line for Apple smartphones. Externally, I need to serve Apple OPM, EPM, PQM and TE. Internally, I need to Co-work with the engineering team (IE, ME, TE, QE), production team, logistic team, China HQ to track 3M will be on schedule and evaluate the influence scope. Also, improving the yield and achieving TAT in achievable quality requirements are my main task during NPI build. In sustaining, I need to simulate the process flow, improve yield by data analysis and reduce FPPR. I feel great to grow with plans and do the right thing right. When I first joined Pegatron, I was an industrial engineer. After a year, I was promoted as operation project manager. By having an IE background, I am more sensitive at resource allocating such as QPL, space layout, head count to eliminate extra cost.

Country

Taiwan

City

Taipei

Industry

Mechanical Or Industrial Engineering

Skill

SAP ERP, Arena Simulation Software, Microsoft Excel, Research, C++, Microsoft Office, PowerPoint, Microsoft Word, English, JMP

Experience

VanMoof

Engineer Program Manager

VanMoof

LinkedIn
2021-11 - 2022-7 · 9 mos

台灣 臺北市

■ Design NPI modules (E-Lock, Kickstand, Carrier) with ID, ME, EE and vendors for builds. ■ Drive vendor at schedule, DFM, quality, compliance and cost breakdown for NPI builds ■ Organized supply chain (SQE, PQE) and RD (ME, EE, FW) and vendors for sustaining project improvement. ■ Managed Engineering Change by FA, control run from customer or factory feedback. ■ Implement PLM system (Arena) by defining engaging members, BOM, PN

深圳市振云精密测试设备有限公司

Senior Project Manager

深圳市振云精密测试设备有限公司

LinkedIn
2019-7 - 2021-10 · 2 yrs 4 mos

Taipei City, Taiwan

■ Manage 6 MP Projects &11 NPI Projects by 6 junior PM. ■ Learned testing spec & design requirement from customer and provided DFM (Design For Manufacturing). ■ Established overall project schedule by design progress, purchase LT, fabrication LT and bring up by 5M. ■ Cooperated externally with Apple, FB, Google team such as OPM, EPM, TE, ME, DRI and GSM. ■ Cooperated internally with EE, ME, Purchase, Logictic, FAE team to meet design requirement & delivery. ■ Co-Worked with CM such as Foxconn, GTK, Pegatron, Quanta, USI, ICT and so on. ■ Analyzed BOM cost and Provide quotation with NRE, SG&A, OSS. (Part of Sales) ■ Drived quality meeting and provide corrective action by DMAIC. ■ Tracked material status and consume rate to prepare safety stock for each build need. (ME, EE, IC, PCB). ■ Experienced at consumable hardware product lifecycle and serviced Apple, Facebook, Google team. ■ Experienced at providing total solution for SMT testing & FATP equipment.

Pegatron

Operation Project Manager - Servicing Coco

Pegatron

LinkedIn
2017-8 - 2019-3 · 1 yr 8 mos

Elk Grove

■ Leaded two new smart phone repair new product introduction (NPI). Overall 3 NPI experience. ■ Established overall NPI project schedule by forecast, budget control and 4M schedule ■ Assigned ownership of project tasks to team DRI and allocated human & material resource ■ Managed, tracked and ensured timely and high-quality NPI deliverables ■ Responsible for yield & TAT during Control Run, EVT & PVT and MP ■ FA root cause analysis & data analysis of yield improvement ■ Aligned the requirements with Customer, China HQ, SQE and Production ■ Clarified process flow and defined demand of internal IT development project ■ Released status to internal stakeholders with efficient analysis and potential direction in daily meeting ■ Proposed process flow and spatial assessment for new business

Pegatron

Industrial Engineer

Pegatron

LinkedIn
2016-8 - 2017-7 · 1 yr

elk grove

■ Design layout, equipment quantity and head count. ■ Manage a 12 people IE team to support with UPH/TAT/Yield/Quality improvement ■ Leading Engineer support team to build new line in Indiana. Increasing 60% UPH. ■ Combine numbers of product process into single line to reduce HC and fixture. ■ Design facility plans and time schedule for new repair line setup till go live.

University of Southern California

Graduate Student

University of Southern California

LinkedIn
2014-8 - 2016-5 · 1 yr 10 mos
Royal – hs

Warehouse Management Intern

Royal – hs

2013-9 - 2013-11 · 3 mos

Taipei Taiwan

Established standard operating procedures of warehousing and introduce ERP system through the company.

Hon Hai Precision Ind. Co./Foxconn Technology Group

Industrial Engineering Intern

Hon Hai Precision Ind. Co./Foxconn Technology Group

2011-7 - 2011-8 · 2 mos

China

Designed and executed a new process for the tablet PC assembly line so decreased 9% labor costs. Gained Foxconn 2011 IE Committee Most Popular Award

Education

University of Southern California

University of Southern California

LinkedIn

Industrial Engineering

2014 - 2016 · 2 yrs
National Tsing Hua University

National Tsing Hua University

LinkedIn

Industrial Engineer and Engineering Management

2008 - 2012 · 4 yrs

Che-wei Huang's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.