Chalermsak Sangkamanee
Electrical Engineer
About
EXPERIENCE BRIEF • I have an Electrical Engineer License LEVEL II (สฟก.5174) issued by Council of Engineers • 14 years solid experience in Electrical Design & Engineering, Procurement, Construction, and Management (EPCM) of Power Plant, Petrochemical and Oil & Gas plant. • 4 years solid experience in Preventive maintenance and Facilities management. • 3 years solid experience in Electrical & Instrument Calibration of the calibration laboratory. • Working experience is required well understanding of electrical international codes and standards such as API, NFPA, IEC, NEC, IEEE, ANSI, NEMA standards. • Working experience is required well understanding of Explosion Proof electrical international codes and standards such as IEC, NEC standards. • Knowledgeable in quality management system. • Responsible attitude towards the adherence to all occupational health and safety conditions. • Preparation of monthly and annual operating expense budgets and monitoring against performance. • A high level of presentation, organization and time management skills. • Good project management including budget, estimation and delivery report preparation. • Good relationship, highly responsible and willing to work under pressure. • Self-Initiative thinking, logical judgment and be able to work under pressure. • High responsibility and able to work on tight schedules. • Proactive and strong leadership, problem solving and analytical skills, team-oriented and initiative. • Self-motivated, willing to learn new things and a positive attitude. • A professional attitude towards communicating with clients. • Knowledge of high voltage maintenance and power management. • Knowledge of building, air condition and utility supply in manufacturing. • Maintenance of a good relationship with the client and staff. • Able to do maintenance planning & document control system. • Able to work independently and teamwork player. • Able to start immediately will be an advantage.
Thailand
Rayong
Oil & Energy
Project Management, Project Planning, Electrical Design, Electrical Engineering, Primavera P6, ETAP Power System Analysys, Dialux, Relux, AutoCAD, Microsoft Office, MATLAB, Oil & Gas Industry, EPCM, API Standard, Explosion Proof, NEC Standard, IEC Standard, ANSI, NEMA, IEEE Standard
Experience

Electrical Engineer
Star Petroleum Refining Public Company Limited(SPRC)
Map Ta Phut Industrial Estate, Map Ta Phut, Muang Rayong Thailand
• Leader and Supervision of electrical installation shall be in accordance with the Refinery, oil & Gas Plant Standard, follow explosion proof standard and API Standard requirement. • Inspection the functional tests (Field Tests/Pre-test) of electrical equipment in the EP project. • The test system was designed to meet the requirements of the principles of electrical engineering. • Review the specifications to equipment installation to API standards (CHEVRON USA) and be approved by the appropriate vendor. • Check the electrical specifications before installation to the EP project. • Check the documentation for the installation of electrical equipment and the installation procedure of electrical equipment in EP projects. • Check validity of document delivery and implementation plans for all types of electrical installation in EP projects. • Approved contractors to install electrical equipment as requested by the application and the documents are authentic. • Inspection the installation of the electrical contractor to install the correct electrical standards and as agreed in the contract of the EP projects. • Inspection the system tests (Pre-commissioning/Commissioning test) of electrical equipment in the EP project. • Reported to a manager every time, if the problem is not installed correctly. To find a solution together. • Prepare reports on time and ensure that all records are maintained up to date at all times. • Attendance problems and summarize the progress of the EP project. • Support the promotion of the destination without incident, the campaign for zero accidents. • Coordinate with all parties to achieve the objectives. • Control is installed according to the extent and within the time limit. • Handover, contractor delivery, with a summary of the problems and solutions before delivery to the maintenance department. • Review and document the installation of the fuel system clean them properly. Before handover/delivery to the maintenance department.

Senior Electrical Design Engineer
Thai Woo Ree Engineering Company Limited (SK E&C)
Huaypong, Muang Rayong Thailand
• Responsible for planning the project in order to accomplish its goals within constraints such as time, cost and agreed quality standards. • Creates and executes project work plans and revises as appropriate to meet changing needs and requirements. • Maintain the project budget for delivering the project within the budget defined. • Responsible for producing and maintaining detailed project plans, critical path analysis, weekly and monthly progress reports. • Identify resources needed and assigns individual responsibilities. • Ability to provide sufficient input into the technical analysis of the project • Manage day-to-day operational aspects of projects and scope. • Review deliverables prepared by team before passing to client. • Prepare for engagement reviews and quality assurance procedures. • Minimizes our exposure, risk on project and enforce Co.’s methodology & project standards. • Ensures project documents are complete, current, and stored appropriately. • Determines appropriate revenue recognition, ensures timely and accurate invoicing and monitor receivables for project. • Follow up with clients, when necessary, regarding unpaid invoices. • Analyzes project profitability, revenue, margins, bill rates and utilization. • Communicate and develops lasting relationships with client personnel to foster client ties. • Continuously monitor progress in terms of the status of the plan and the budget. • Maintain and implement Company’s HSE Policies and Procedures in the project. • Responsible for the project’s commitment to quality standards.

E&I Project Manager
Amata B.Grimm Power Rayong1, 2 Project (ABPR#1&2)
Amata City Industrial Estate, Pluakdaeng, Rayong Thailand
• Responsible for planning the project in order to accomplish its goals within constraints such as time, cost and agreed quality standards. • Creates and executes project work plans and revises as appropriate to meet changing needs and requirements. • Maintain the project budget for delivering the project within the budget defined. • Responsible for producing and maintaining detailed project plans, critical path analysis, weekly and monthly progress reports. • Identify resources needed and assigns individual responsibilities. • Ability to provide sufficient input into the technical analysis of the project • Manage day-to-day operational aspects of projects and scope. • Review deliverables prepared by team before passing to client. • Prepare for engagement reviews and quality assurance procedures. • Minimizes our exposure, risk on project and enforce Co.’s methodology & project standards. • Ensures project documents are complete, current, and stored appropriately. • Determines appropriate revenue recognition, ensures timely and accurate invoicing and monitor receivables for project. • Follow up with clients, when necessary, regarding unpaid invoices. • Analyzes project profitability, revenue, margins, bill rates and utilization. • Communicate and develops lasting relationships with client personnel to foster client ties. • Continuously monitor progress in terms of the status of the plan and the budget. • Maintain and implement Company’s HSE Policies and Procedures in the project. • Responsible for the project’s commitment to quality standards.

Electrical Engineer
Star Petroleum Refining Public Company Limited(SPRC)
Map Ta Phut Industrial Estate, Map Ta Phut, Muang Rayong Thailand
• Leader and Supervision of electrical installation shall be in accordance with the Refinery, oil & Gas Plant Standard, follow explosion proof standard and API Standard requirement. • Inspection the functional tests (Field Tests/Pre-test) of electrical equipment in the clean fuel project. • The test system was designed to meet the requirements of the principles of electrical engineering. • Review the specifications to equipment installation to API standards (CHEVRON USA) and be approved by the appropriate vendor. • Check the electrical specifications before installation to the clean fuel project. • Check the documentation for the installation of electrical equipment and the installation procedure of electrical equipment in clean fuel projects. • Check validity of document delivery and implementation plans for all types of electrical installation in clean fuel projects. • Approved contractors to install electrical equipment as requested by the application and the documents are authentic. • Inspection the installation of the electrical contractor to install the correct electrical standards and as agreed in the contract of the clean fuel projects. • Inspection the system tests (Pre-commissioning/Commissioning test) of electrical equipment in the clean fuel project. • Reported to a manager every time, if the problem is not installed correctly. To find a solution together. • Prepare reports on time and ensure that all records are maintained up to date at all times. • Attendance problems and summarize the progress of the clean fuel project. • Support the promotion of the destination without incident, the campaign for zero accidents. • Coordinate with all parties to achieve the objectives. • Control is installed according to the extent and within the time limit. • Handover, contractor delivery, with a summary of the problems and solutions before delivery to the maintenance department.

Technical Support Engineer
Royaltec International Company Limited
Map Ta Phut, Muang Rayong Thailand
• Provide technical services, solutions and knowledge of electrical explosion proof equipment to customers • Product demonstration and presentation to customers for pre-sales approach. • Handle technical complaint and develop & train skills of sales forces. • Responsible for selling an explosion proof product to existing & potential customers. • Responsible for maintaining & visit both existing & potential customers. • Support our sales team nation-wide to present our products to our clients and prospects. • Perform technical presentations to engineering companies and EPC contractors. • Ensure technical specifications of our products are referenced and approved by engineering companies. • Identify large projects upstream and lead tenders preparation and submission. • Provide “Value-added” services to our customers. • Overall technical backup for our Sales force on the ground. • Launch and development of new product lines.

E&I Project Manager
Lekatech Limited
Map Ta Phut, Muang Rayong Thailand
Establish the procurement procedure and instruction for award or approve sub-contractor, approve vender list and approve material procedure, electrical & instrument specification and technical standard. • Establish the tender instruction, bidding instruction, technical bid evaluation, bidding tabulation. • Planning the progress for the construction project such as field electrical, instrument and communication system project. • Setup document control for all phase of the construction project improvement to ISO9001/ISO14001. • Budgetary plan for all phase of the construction project such as field electrical & instrument system and communication system project. • Review and understand all relevant documentation pertaining to the project including scope of services, project execution plan, proposal/project schedule (including manpower projection plan), condition of contract. • Work within the stand planning/scheduling procedures. • Ensure that these procedures fulfill client’s requirements and develop additional project specific procedures where necessary. • Prepare activity plans to accomplish all work required by the procedures and to ensure that sufficient planning resources are provided • Write job descriptions for planning engineers assigned to the project. • Direct and control the work of all planning engineers assigned to the project. • Chief planning engineer with performance appraisals of assigned planning engineers. • Liaise with client project control personnel as necessary • Ensure that all involved parties participate in preparation of items described above and that they agree to their respective elements and approve documents where necessary. • Produce current physical progress reports and final job statistics. • Prepare and issue project action reports to senior project manager/senior project control manager. • Maintain accurate schedule and control curves in an updates condition.

E&I Project Manager
Global Engineering & Supply Company Limited
Map Ta Phut, Muang Rayong Thailand
• Establish the procurement procedure and instruction for award or approve sub-contractor, approve vender list and approve material procedure, electrical & instrument specification and technical standard. • Establish the tender instruction, bidding instruction, technical bid evaluation, bidding tabulation. • Planning the progress for the construction project such as field electrical, instrument and communication system project. • Setup document control for all phase of the construction project improvement to ISO9001/ISO14001. • Budgetary plan for all phase of the construction project such as field electrical & instrument system and communication system project. • Review and understand all relevant documentation pertaining to the project including scope of services, project execution plan, proposal/project schedule (including manpower projection plan), condition of contract. • Work within the stand planning/scheduling procedures. • Ensure that these procedures fulfill client’s requirements and develop additional project specific procedures where necessary. • Prepare activity plans to accomplish all work required by the procedures and to ensure that sufficient planning resources are provided • Write job descriptions for planning engineers assigned to the project. • Direct and control the work of all planning engineers assigned to the project. • Chief planning engineer with performance appraisals of assigned planning engineers. • Liaise with client project control personnel as necessary • Ensure that all involved parties participate in preparation of items described above and that they agree to their respective elements and approve documents where necessary. • Produce current physical progress reports and final job statistics. • Prepare and issue project action reports to senior project manager/senior project control manager. • Maintain accurate schedule and control curves in an updates condition.

Electrical Engineer
Rayong Bulk Terminal Co., Ltd.(SCG-Group)
Map Ta Phut Industrial Estate, Map Ta Phut, Muang Rayong Thailand
• Management of the plant assets that includes: building, ancillaries, utilities, machinery, parts, tools and any other assets involved in the operation of the plant. • Maintain facilities and machine capacity in its maximum efficiency. • Lead and drive a team, foster teamwork, motivate other, coach and develop other, champion change. • Supporting others functions by providing technical expertise, answering queries and provide useful information related to equipment operation. • To support organization and standard by maintain electrical power system, high voltage substation and large motor. • Manage all projects, monitor and update project status to achieve project objective. • Provide, create and control spending to support organization activities and target. • Do preventive maintenance, plant electric power supply and large scale motor. • Maintain facilities system (electric part). • Support jobs that relate in safety, quality, ISO and energy to meet regulation and global standard. • Establish the preventive maintenance program for all phases such as field electrical & instrument system, lighting system, communication system. • Procurement and spare parts inventory setup for all phases of electrical equipment such as centrifugal pumps, electrical device, tool and control system, etc. • Establish the master plan and procedure for preventive maintenance, reliability control and management, shutdown and turn around, TPM, TQM, 5S and ISO 9000/ ISO 14001 system. • Budgetary plan for capital expense, operating expense of the electrical and all maintenance departments.

Electrical Engineer
Rayong Bulk Terminal Co., Ltd.(SCG-Group)
Map Ta Phut Industrial Estate, Map Ta Phut, Muang Rayong Thailand
• Planning the progress for the construction project such as field electrical, instrument and communication system project. • Review and understand all relevant documentation pertaining to the project including scope of services, project execution plan, proposal/project schedule (including manpower projection plan), condition of contract. • Work within the stand planning/scheduling procedures. • Ensure that these procedures fulfill client’s requirements and develop additional project specific procedures where necessary. • Prepare activity plans to accomplish all work required by the procedures and to ensure that sufficient planning resources are provided • Liaise with client project control personnel as necessary • Ensure that all involved parties participate in preparation of items described above and that they agree to their respective elements and approve documents where necessary. • Produce current physical progress reports and final job statistics. • Prepare and issue project action reports to project manager/project control manager. • Maintain accurate schedule and control curves in an updates condition. • Analyses schedule trends and produce regular forecasts of schedule performance and issues for project review. • Maintain awareness and understanding of relevant systems operated by other departments. • Monitor document for conformance to contract requirements.

Electrical Engineer
CP Complex Nikhompatthana, Rayong Thailand
• Site engineer to manage, supervise and co-ordinate maintenance team and sub-contractors on site for maintenance and service system to ensure the works result follow with action plan and client need. • Ensure facility preserves a high-level maintenance and appearance. • Look for potential new works that may be required on site. • Adhere to occupational health and safety and injury management regulations. • Provide site-specific standard operation procedures and ensure all staff follow these procedures thus reducing risk to our employees and our customer’s employees. • Understand contractual obligations and meet customer expectations under the agreement. • Manage the account so that we follow all budget plans on a monthly basis. • On a weekly and monthly or as needs basis, report to the chief engineer relating to the qualitative, PM and CM work order are completed and outstanding. • Attend weekly/monthly meetings with chief engineer and supervisors to assess current progress. • Manage and cooperate the energy saving project and monitor energy consumption in customer site. • Reducing maintenance turnaround periods and downtime of plant and equipment. • Mentoring of staff. • To estimate cost of renovation work for presentation with client. • Other duties as reasonably requested from time to time. • Design for all phase such as field electrical and instrument system. • Coordinated team setup document such as ISO9001/14000. • Develops the programmable logic controller(PLC) for all phase projects.

Electrical Engineer
Meditop Company Limited
Ladprao 71, Wangthonglang, Bangkapi, Bangkok Thailand
• Manage of after sales service with customer satisfaction. • Manage of customer complaint. • Controlling of service peoples to maintain of good condition for service Medical Equipment and measuring tools. • Monitor document control for customer data, customer history, service report and spare parts. • Service mind creation and support to the service staffs. • Installation, commissioning and repair the medical equipment. • Establish the schedule plan for maintenance medical equipment.
Chalermsak Sangkamanee's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

