
brian partridge
engineering project manager
About
Dynamic leader looking for a challenging career with a progressive company in the consumer packaged goods industry. Key strengths and experience in operations and project management. Many years of demonstrated performance of leading teams and driving change in the areas of Safety, Quality, and Productivity performance. Utilizes a LEAN management approach to develop and implement successful continuous improvement and capital expenditure projects from conception to implementation.
united states
elkhorn
consumer goods
continuous improvement, manufacturing, process improvement, management, lean manufacturing, operations management, food industry, supply chain, production planning, haccp, food safety, supply chain management, business process improvement, food manufacturing, food processing, six sigma, ingredients, root cause analysis, process engineering, cross functional team leadership
Experience

2nd shift supervisor
land o'lakes, inc.

project engineer
james skinner baking company
* Planned and implemented capital improvement projects aimed to build capacity, increase throughput, reduce cost, and maintenance and repair projects. * Managed projects to ensure on time delivery and controlled costs to achieve budget. * Provided engineering support to process modifications involving packaging line layouts, equipment modifications, and packaging material selection. * Coordinated internal fabricators, outside contractors, and equipment suppliers to meet scheduled project deliverables.

engineering project manager
warren distribution
* Utilized project management methodologies to implement multiple packaging line capital expenditure projects to package new product configurations. * Responsible for projects through all stages of the management process: initiation, planning, execution, and closing. * Engaged key stakeholders to develop scope and design requirements. Performed all project planning tasks including: project scope development, design, budgeting, equipment / contractor selection, purchasing, and timeline creation. * Coordinated installation resources (internal/external) to ensure project met expected deliverables. * Led project team meetings throughout the project to ensure minimal impacts to ongoing production operations. * Reported project activity progress and spending to Sr Leadership team throughout the project.

summer intern
national steel corporation
* o Assisted Maintenance Engineering Manager with daily management functions. * o Performed primary functions for a capital expenditure project: planning, purchasing, estimating, labor tracking, and scheduling logistics. * o Set up a department-wide tracking system to ensure compliance with OSHA regulations.

audio video technician
best buy
* o Restored customer confidence in products to prevent return of merchandise. * o Diagnosed problems and performed preventative maintenance on consumer electronic devices. * o Received training in operation and installation of home electronics.

production manager
land o'lakes, inc.
* o Led a team of 20 hourly plant operators and addressed any production problems. * o Production scheduling, labor allocation, and material requirements planning. * o Tracked production results and goals and reported to plant manager * o Directed process improvement teams that analyzed various manufacturing processes. * o Developed job certification program and training program for hourly operators.

plant management trainee
land o'lakes, inc.
o Learned all facets of the different manufacturing processes at a feed mill (blending, pelleting, packaging) o Assisted the Plant Manager with various capital and special projects.

plant manager
land o'lakes, inc.
* o Coordinated manufacturing and distribution operations of cooked cattle tubs and bagged cattle mineral, at a non-union feed manufacturing facility operating 24/7, with direct supervision of 5 supervisors and 45 hourly production employees. * o Ensured plant compliance with company and regulatory standards in the areas of safety (OSHA), quality (FDA), cost, and productivity. * o Implemented maintenance and repair & profit adding capital projects from cradle to grave. * o Responsible for meeting company expectations for plant P&L and operating budget. * o Worked closely with production management team to reduce barriers for growth; to realize increased YOY manufacturing production output, increased line efficiencies (OEE), and reduced labor cost per ton.
Education
university of nebraska at omaha
project management
rockwood summit high school
university of nebraska at omaha
missouri university of science and technology
management
Course Work including: Total Quality Management Operations and Production Management Statistical Process Control (6-Sigma) Methods of Industrial Engineering Automation in Manufacturing Business Accounting Inventory Management & Logistics Project Management Human Factors / Work Design EIT Certification - June 03
missouri university of science and technology
management
Activities and Societies: Lambda Chi Alpha, St.Pats Celebration Committee, Student Newspaper (photographer)
brian partridge's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

