
brian njenga
About
I attended the University of Arizona, where I earned a B.Sc in Mining Engineering with a focus on mine operations. I have since worked in various roles, both in strategic and short range planning for Freeport McMoran. My aspiration is to develop international experience, through a company characterized by safe practice, and earn a leadership role where I can leave a longstanding legacy.
united states
phoenix
mining & metals
mining, mining engineering, minerals, geology, microsoft office, mineral exploration, minesight, engineering, microsoft excel, gold, structural geology, team leadership, copper, geological mapping, powerpoint, long range planning, mineral processing, geotechnical engineering
Experience

mine engineer ii
cmoc international
* Life of Mine Planning * Reserves auditing and reporting * Pit optimization * Design, evaluate and schedule pushbacks * Process integration and training expat support for Tenke Fungurume Mining * Key contributor during transition from $2.00 FCX reserves to $2.88 CMOC reserves (evaluate strategies to maximize and transition into incremental pushbacks where possible) * Provide mine planning guidance to corporate Social & Environmental team for permit reviews, and resettlement action plans

minesight testing engineer
mintec
This internship reinforced my technical skills by exposing me to different functionality and enhancing my ability to derive practical solutions to real challenges. Component testing was a major focus of my internship, and as a result, my experience in technical writing and critical thinking has diversified my skill-set as an engineer.

senior mine engineer
freeport-mcmoran
* Mid-Range Mine Planner * Create quarterly forecast plans using MSAtlas, MSSO * Audit weekly and monthly plans * Liaison with short range, long range planning, and operations to ensure plan compliance * Continuous improvement projects * Develop contingencies to honor quarterly forecast, evaluate impacts to longer term plans * Improved forecast process by consolidating workflow into one scheduling tool, removing multiple hand offs between various mine planning groups, decreasing lead time for completing plans and improved scenario management by: * 1) Improving block model material binning strategy to accommodate streamlined setup in MSSO, allowing more robust routing and dynamic cutoff changes during scheduling process * 2) Changing cut design criteria, implementing digline sequencing method, giving the ability to optimize shorter scheduling periods without manual cut digitization and scheduling
Education
university of arizona
mining engineering
Activities and Societies: The Society for Mining, Metallurgy and Exploration
brian njenga's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

