Brendan Strum
Vice President Operations @ Nexar Inc.
About
At Lyft, my focus lies in managing complex operations, establishing foundational tools, and steering strategic initiatives that enable business growth while maintaining our customer obsessed mindset. Previously, as Chief of Staff, I contributed to pivotal decisions alongside the Chief Business Officer with regard to org health/design, budget management and high profile projects.
United States
San Jose
Transportation/Trucking/Railroad
Strategic Partnerships, Business Analytics, Operations Management, Field Operations, Sales Operations, Six Sigma, Supply Chain Management, Process Improvement, Continuous Improvement, Lean Transformation, Kaizen, Supply Chain Optimization, Business Process Improvement, Procurement, Logistics, Lean Manufacturing, Strategy, Manufacturing, Supply Chain Operations, Supply Management
Experience

Group Manager, Supply Chain Management
Cupertino, CA
- Leading a team responsible for supply, cost, NPI and contracts for Watch, Mac Touch Bar & New Technologies - Manage a supplier portfolio of $1.7B in annual spend. Report cost savings and deal structures to Procurement & Finance VPs on a monthly basis - Successfully expanded OLED capacity by 2x in the past 18 months through shared capex investments and the bring-up of a second strategic partner in order to support Apple’s Wearables growth - Collaborate with Engineering & Marketing to evaluate product strategy and influence Apple’s new tech roadmap - Responsible for executing complex, multi-billion dollar contracts which transition projects from technology investigations to mass production. Agreements include vendor obligations tied to capacity, supply, cost and project risk

Global Supply Manager
Cupertino, California
Display: - Responsible for managing the iPhone XR Display supply chain - Co-managed $2B in spend across 3 industry known LCD suppliers, consistently delivering 3%+ QoQ - Supported early engagement with Engineering/Product Design to reduce LCD supply chain costs by over 20% through multi-sourcing and design optimization Interconnect: - Managed ~$1B in spend across 12 suppliers within the Flex/PCB industry - Own quarterly negotiations, consistently achieving savings with a range of 3.5-12% - Collaborated cross-functionally to successfully ramp ~90 Interconnect PN’s per year that fed into 3 iPhone models (iPhone 6+, 7, 8) - DRI for the supplier selection, capacity bring-up and overall manufacturing readiness for 3 brownfield flex factories in SE Asia that supported 3D Touch technology for iPhone

Analyst, Corporate Strategy - Global Operations & Footprint
Greater Philadelphia Area
• Project management and advisory function that supports TE’s businesses with global footprint and strategic projects • Project Manager for $50M, 660k SQ FT Multi-Business Manufacturing Greenfield Project in Hermosillo, Mexico • Develop and implement consistent footprint strategies and standard processes across TE’s 16 business units • Evaluate manufacturing climates, assess industry trends / environments and support in business case development • Liaison between regional businesses and corporate support functions to ensure sound evaluations and successful projects • Utilize FlexSim to simulate operations in order to evaluate and justify investment in automation and lean manufacturing

Rotational Associate, Global Operations
Winston-Salem, NC
Global Procurement – Resins • Implemented a global resins consolidation and complexity reduction strategy resulting in 2% or $10M in savings - Developed a strategy to move from 5000 to 500 grades over 2 years - Interfaced with Engineering and Strategic Suppliers to align efforts and execute the reductions • Managed $20M of PBT FR – executed a global PBT FR RFQ resulting in 7% or $1.5M in savings Lean Manufacturing & Process Improvement - Aerospace and Automotive Segments • AD&M – contactors and relays value stream kaizen: - Exercised competitive bids and supply base consolidation for hermetic connectors - $46k in savings - Leverage QCPC to eliminate 100% of dielectric failures through heat shrink tubing substitution - In-sourced secondary machining process of actuator plates – 28% savings per unit • AUTO – mechatronics value stream kaizen: - Relocation of inspection station and de-coupling of molding from assembly – increase OEE by 13% and $21k saving - Recommended a heat cured silicone material alternative- potential for 38% or $108k savings Global Logistics – Operations & Network Design • Led a package labeling improvement project for the US DC Network – savings of $160k • Supported development of outsourcing RFQ for TE’s US DC Network to strategic 3PL providers • Utilize SC Guru to model and evaluate supply chains and identify improvement opportunities • Leverage FlexSim to simulate operations including production, replenishment and distribution
Brendan Strum's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.






