Berk Senyigit, MBA
Supply Chain Project Planning Leader Engineer @ ROKETSAN
About
Bilkent University Industrial Engineering program and Bilkent University MBA program graduate, currently working at ROKETSAN A.Ş. as a Leader Supply Chain Project Planning Engineer who seeks to develop a critical set of managerial skills and business knowledge. My main objective is to improve myself by utilizing analytical thinking and working in a well-disciplined way.
Türkiye
Ankara
Defense & Space
ERP (Kurumsal Kaynak Planlaması), Tableau, Material Requirements Planning (MRP), Analytical Skills, Communication, Creative Problem Solving, Production Planning, Enterprise Resource Planning (ERP), Supply Chain Management, Microsoft Office, Project Management, Strategic Planning, Research, Musical Instruments
Experience

Supply Chain Project Planning Senior Engineer
- Production, Material and Inventory Planning of two R&D projects and one space project - Planning and coordinating the production activities in a project based planning environment, monitoring the execution of production plan, procurement process of supply goods - Being responsible for entire production and workshop plans of three projects -Managing complex bills of materials of three projects - Utilizing Oracle MES (Manufacturing Execution System) which is a real-time production following project, Oracle ASCP (Advanced Supply Chain Planning) Module which helps material planning and resource planning according to time constraint, Tableau Software so as to construct and analyze the entire supply chain functions and Oracle ERP Modules - Preparing executive reports indicating the current state of the projects and informing the high level managers and stakeholders of the projects.

Production Planning Intern
- Developing a method to evaluate KPIs of supply chain management engineers - Being responsible for planning the production tasks and schedules of a launcher system - Analyzing Oracle ERP modules, Oracle ASCP (Advanced Supply Chain Planning) Module

Intern
Eczacıbaşı Lincoln Electric Askaynak
- Developing value stream mapping of the current state of the welding wire production line - Establishing advanced value stream mapping project by increasing the ratio of the value-added time to the production flow time

Graduation Project
The aim of this project is to reduce cycle time of the manufacturing of the wind turbine blades by utilizing the optimization software and algorithms along with Kitting method for deciding right locations, optimal numbers of feeding points, and reducing the travel distances of operators. As a solution, flowchart description of major elements in the company is constructed and a mathematical model is developed in order to minimize the total distance between feeding points and process points so as to drive down the cycle time.

Intern
5N1K Gelişim Akademisi

Production Intern
Ankara, Turkey
As an intern, I did my internship at the Production Department. During my internship I had a chance to observe the several departments along with the production department such as quality, procurement, production planning departments and analyze the processes for manufacturing, raw material supply, quality control steps. I also had an opportunity to embrace the principles of lean manufacturing during this period.
Berk Senyigit, MBA's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.





