Ayman Shebl

Ayman Shebl

Construction Manager @ Hassan Allam Technologies (HAT)

About

A highly accomplished Project, Quality, and Construction Management Professional with over 22 years of experience leading large-scale infrastructure and building projects across all phases — from planning and execution to quality assurance and final delivery. My background integrates Project Execution, Quality Control (QA/QC), and Site Management, allowing me to ensure technical precision, schedule adherence, and full compliance with contractual and safety standards. Proven ability to manage multidisciplinary teams, implement ISO 9001-based Quality Systems, conduct audits, and enhance operational efficiency through process optimization and performance monitoring. Skilled in resolving on-site challenges, coordinating with clients, consultants, and subcontractors, and ensuring successful handover of projects within cost, quality, and time targets. Core Expertise: Project & Construction Management Quality Control / Assurance (QA/QC) Project Execution & Site Supervision ISO 9001 Implementation & Internal Auditing Contract & Technical Documentation Review Risk Analysis & Corrective Actions Leadership & Team Development Stakeholder & Client Coordination Health & Safety Compliance

Country

Egypt

City

Cairo

Industry

Utilities

Skill

Quality Management, Construction Safety, Electric Power, Petroleum Engineering, Quality Control, Risk Assessment, Construction Management, Power Generation, Power Plants, Electrical Engineering, Commissioning, Project Engineering, Pipelines, Electricity, Petrochemical, Construction, Gas, Gas Turbines, Electricians, Power Systems

Experience

Hassan Allam Technologies (HAT)

Construction Manager

Hassan Allam Technologies (HAT)

LinkedIn
2018-10 - Present · 8 yrs

Egypt

Responsibilities: 1- Supervising, leading subcontractors and self employed for electrical site activities in substations and buldings: - Installation of MV/LVSWGR. - Installation of Transformers, Bus Duct. - Distribution Panels & Cubicles. - Installation of the Electrical works at the buildings (Lighting, Small Power, Telecom, Fire alarm system and cable pulling and termination). - Installation of cable Trays. 2- Review of electrical wiring diagrams and manufacturing documents. 3- Managing site activities including minutes of meeting with customer, check all Submittals, handling daily activities to customer. 4- Organize the work in accordance with method statement. 5- Following up the material purchasing and expedite it. 6- Determine manpower, tools, equipment, and material requirements for each activity. 7- Review work rate and activities to achieve the schedule dates. 8- Proactively evaluate, solve design and construction problems arise from the field. 9- Preparing the Project Schedule (3months-Monthly-weekly) & Monthly Progress Reports. 10- Review and check subcontractor invoices. 11- Implement the electrical safety precautions and testing control measures during the pre- Commissioning and commissioning phases. 12- Coordinate with the client representatives for the plan activities. 13- Conduct work in a safe manner and follow company work practices.

GS E&C

Functional Construction Manager

GS E&C

LinkedIn
2015-7 - 2018-10 · 3 yrs 4 mos

Egypt

Project: ERC Refinery Project, (Gas & Oil project in Mostorod) Client : ERC (Egyptian Refining Company) Consultant: Worley Parsons Responsibilities: Supervising and leading subcontractor team in all electrical activities in site: - Substation, GIS Buildings: Installation of MV/LVSWGR, Transformers, Bus Duct, Distribution Panels & Cubicles. Installation of the Electrical works at the buildings (Earthing, Lighting, Small Power, Telecom, Fire alarm system and cable pulling and termination). - Process field (VDU, HCU, DCU, HPU, SWS, SRU) units. Under Ground activities (Earthling, Duct banks and trenches, ELP conduit), Cathodic Protection for Underground piping, Electrical Equipment installation, A/G Raceway, Cable installation and termination, Lighting system, Electrical Heat Tracing, telecommunication & Fire alarm system.

ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

Electrical QC Site Manager

ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

LinkedIn
2015-2 - 2015-7 · 6 mos

Egypt

Project: ATTAQA Power Plant Project, Arab Republic of Egypt. Responsibilities: 1- Apply procedures/specification relating to quality processes and standards. 2- Review and approve sub-contractors Quality plan and ITP. 3- Review the drawing and technical submittals. 4- Vendor Shop Inspection and verification of the” FAT” Factory acceptance Test for the local and Overseas Vendors. 5- Inspection of Receiving Materials. 6- Raising NCRs for non-fulfillment of specified requirements in completed works. 7- Control of non-conformance product and corrective action follow up. 8- Inspection of electrical installation in power block and buildings as following: - Power Transformers with isolated phase bus duct. - Generator circuit breakers. - Low-voltage, medium-voltage switchgears and MCCs. - UPS, Battery charger and Batteries. - Cable Trays. - Pulling and Termination Cables (Power, Control, Instrument). - Lighting, small power system and distribution boards. - Earthing and Lightning system. - Cathodic protection system. - Telecommunication and fire alarm systems. - Emergency Diesel Generators. 9- Control of measuring and testing equipment’s. 10- Scheduling inspections of works to match progress. 11- Issue of the TOPs from Construction to commissioning and preparation of the Test package. 12- Fulfillment of the final quality dossier and issue the protocols of the completion certificates.

Kharafi National

Lead Electrical Engineer

Kharafi National

LinkedIn
2012-7 - 2015-2 · 2 yrs 8 mos

Kuwait

Project 1 - Installation of Low Sulphur Fuel Oil, Fuel Gas and Gas Oil Pipeline from Mina Al-Ahmadi to Sabiya and Doha Power Stations. Project 2 - Installation of Fuel Gas & Gas Oil Pipelines and Pumping stations from MAA to Azzour & Shuaiba Power Station. Project 3 - Dohaa North Power station Responsibilities: 1- Installation of following activities in Process units, Substation and Buildings: - Aux. Power transformers with Isolated phase bus duct. - Assembly of panel boards (MV SWG, MCC, and Local Panels). - Fire & Gas Detection Panels. - Pulling and termination Cables (Power, Control, Instrument). - Earthing, Lightning systems. - Lighting and small power. - Cable trays. - Batteries, battery chargers and UPS. - Telecommunication and fire alarm system. - Cathodic Protection system for Underground piping. 2- Determine manpower, tools, and equipment and material required for each activity. 3- Organize the work in accordance with method statement. 4- Review work rate and activities to achieve the schedule dates. 5- Prepare materials requisition for all missing & shortage of delivery construction materials. 6- Following up the material purchasing and expedite it. 7- Preparing the Project Schedule (3months-Monthly-weekly) & Monthly Progress Reports. 8- Coordinate with mechanical, steel structure, piping and civil departments. 9- Site Inspection and Testing of the electrical Installation to comply with project specifications. 10- Ensure that LOTO system is implemented with PTW and review the risk assessment. 11- Conduct work in a safe manner and follow company work practices. 12- Proactively evaluate, solve design and construction problems arise from the field. 13- Prepare the red line and as-built drawings. 14- Release of punch list items for electrical activities. 15- Coordinate with the client representatives for the plan activities. 16- Maintenance and testing of MV switchgear and transformers.

Kharafi National

Team Leader QC Engineer.

Kharafi National

LinkedIn
2011-1 - 2012-7 · 1 yr 7 mos

Egypt

Project-1 AL SHABAB SIMPLE CYCLE POWER PLANT (8 x 125 MW) GE Frame 9E. 1000 MW GE. GAS TURBINE PROJECT Project-2 West Damietta SIMPLE CYCLE POWER PLANT (4 x 125 MW) GE Frame 9E. 500 MW GE. GAS TURBINE PROJECT Responsibilities: - Apply procedures/specification relating to quality processes and standards. - Review and approve sub contractors Quality plan and ITP. - Review the drawing and technical submittals. - Vendor Shop Inspection and Expediting. - Inspection of Receiving Materials. - Control of non-conformance product and corrective action follow up. Inspection of an electrical installation activities:. - Main Transformer 15KV/220KV and Aux. transformer 15KV/6.9KV. - Isolated Phase Bus Duct. - Emergency Diesel Generator sets. - MV Switchgears, Load Center, MCC Panels and Distribution Boards. - Batteries and battery chargers. - Cables (Power, Control, Instrument), Cable Trays. - Earthing and Lightning. - Control of measuring and testing equipments. - Review and approve of site quality records and test Packages. - Prepare and compile the final dossiers.

Iberdrola Engineering and Construction

Project Electrical Engineer

Iberdrola Engineering and Construction

LinkedIn
2009-9 - 2010-9 · 1 yr 1 mo

Egypt

Project: ISCC KURAYMAT Integrated Solar Combined Cycle (1*125 MW GE Frame 9E + 1*125 MW Siemens steam turbine + Boiler) Responsibilities: Installation of electrical activities: - Main and Aux. Power transformers. - Isolated phase bus duct. - Assembly boards (MV SWG, MCC, Distribution Panels) - Installation of cable trays. - Pulling and termination Cables (Power, Control, Instrument). - Earthing, Lightning y systems. - Lighting and small power. - Telecommunication system. - Batteries, battery chargers and UPS. - Cathodic Protection.

Consolidated Contractors Company

Lead Electrical Engineer

Consolidated Contractors Company

LinkedIn
2007-3 - 2009-7 · 2 yrs 5 mos

Saudi Arabia

Project: KHURSANIYAH GAS PLANT PROJECT (KGP) In consortium with “BECHTEL & TECHNIP Joint Venture (BTJV)” Responsibilities: 1- Review project scope of work, drawings, technical specifications & relevant documents. 2- Installation and Pre- commissioning of Electrical Activities for Substation: - Transformers ranging from 500 KVA to 67MVA. - Low-voltage, medium-voltage switchgears and MCCs. - UPS, Battery charger and Batteries. - Pulling and Termination Cables (Power, Control, Instrument). - Lighting, small power system and distribution boards. - Earthing and Lightning system. - Telecommunication system. - Catholic protection system. 3- Prepare material requisition for all missing & shortage of delivery construction materials. 4- Determine manpower, tools, equipment, and material requirements for each activity. 5- Review work rate and activities to achieve the schedule dates. 6- Preparing the Project Schedule (Monthly-weekly) & Monthly Progress Reports. 7- Conduct work in a safe manner and follow company work practices. 8- Site Inspection and Testing of the electrical Installation to comply with project specifications. 9- Ensure that LOTO system is implemented with PTW and review the risk assessment. 10- Release of punch list items for electrical activities. 11- Managing site activities including minutes of meeting with customer, handling daily activities to customer. 12- Proactively evaluate, solve design and construction problems arise from the field. 13- Prepare as-built drawings.

kahromika

Electrical QC Site Manager

kahromika

LinkedIn
2004-1 - 2007-3 · 3 yrs 3 mos

Egypt

Project-1 Nubaria Power Station 2x750 MW Combined Cycle. Project-2 Cairo North Power Station II -750 MW Combined Cycle. Project-3 Cairo West Thermal Power Plant (unit 7&8) 2x350 MW Gas Oil Responsibilities: 1- Follow the QC procedures, contract specifications and applicable standards. 2- Prepare Project Quality Plan in accordance with the contract and applicable quality standards. 3- Review and approve sub-contractors Quality plan and ITP. 4- Responsible for the quality performance of the project. 5- Ensure that site inspection controls are enforced. 6- Visit of supplier’s site to ensure that quality in fabrication and maintained the required standards. 7- Inspection of electrical installation activities. 8- Material Receiving Inspection. 9- Control of measuring and testing equipments. 10- Coordinate nonconformance identification. 11- Review and approve of test package records. 12- Compile quality documentation.

Education

Helwan University Cairo

Helwan University Cairo

LinkedIn

electrical power

1997 - 2002 · 5 yrs

Ayman Shebl's Contact Information

Email

******@***.com

Phone

(**) *** ****

Find the Right Leads
Find Verified Contact Data

Try with: Jensen Huang @ nvidia.com Click to autofill
LeadContact awards, five-star ratings, and GDPR compliance badges

What LeadContact does well

Find verified emails, phone numbers, and decision-makers with 98% accuracy.

Find Leads

Find Leads

Find the right people by company, role, industry, location, and more.

925M+ professional profiles

Find Leads
Find Emails

Find Emails

Access verified email addresses for your target contacts.

657M+ emails

Find Emails
Find Phone Numbers

Find Phone Numbers

Get cross-validated phone data from multiple top sources.

239M+ phone numbers

Find Phone Numbers

More Accurate. Lower Cost.

Find contact data in 1 tool with 98% accuracy

LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.

LeadContact Logo
Competitor Tools

All these = $289 per month

Great conversations start with the right contact.

It’s time to find yours.