Arun kumar PMP®,
Construction Manager @ Cylingas Company LLC
About
Construction Manager 20+ Years’ Experience | ADNOC, SHELL & Dubai Municipality Approved | Oil & Gas EPC Specialist Highly experienced and result-driven Construction Manager with over 20 years of proven success in the Oil & Gas industry, specializing in piping, mechanical works, furnace erection, tank fabrication, and complete turnaround and maintenance projects. Adept at managing site activities in line with project specifications, international codes, and client requirements. Approved by ADNOC, SHELL, and Dubai Municipality (DM) for leadership roles in major infrastructure and industrial construction projects. Current Engagement Company: CYLINGAS / ADC, Abu Dhabi – UAE Position: Construction Manager Projects:BOROUGE4,& MAINTENANCE TA (EU 1&2) ADNOC Borouge 4 – Ethylene Storage Tank (Technimont) ADNOC Tank Construction – Al Nouf, Dhabbiya (Robtstone)
United Arab Emirates
Dubai
Construction
Project Management, Furnace, Piping, EPC, Engineering, Petrochemical, AutoCAD, Refinery, Power Plants, Factory, Pipelines, Construction, Metal Fabrication, Oil/Gas, Petroleum, Quality Management, Project Engineering, Tanks, Refineries, Progress Monitoring
Experience

FURNACE ENGINEER
RUWAIS ,UAE
All the equipment (Radiant panel, convection modules, exchanger’s, steam drum, ID fan) structure and piping erection activities in furnaces. All the chemical cleaning activities for the steam systems . Temporary de-min water, natural gas systems pigging activity. All the pre commissioning activities in furnace systems. Responsible to follow all systems from construction up to handover systems. Monitoring selected systems for Pre-commissioning activities (Air Blowing, Steam Blowing and Chemical Cleaning). Coordinator between LINDE / Vendor to follow up the damaged valves for repairing. Participating in Client/Partner construction coordination meetings on the CM/ senior control level. Coordination with the plant department regarding all equipment is used in my section. Assuring adequately timed material supply to site through proper look ahead and communication between both internal departments and partner procurement. Schedule follow up and updating according to site conditions.

Senior Site Engineer
Qatar
Qatargas 3 & 4 Onshore Project (QCS)- LNG Trains no. 6 & 7 Utilities, Off-site and Off-plot Areas Civil and Electromechanical Works, Ras Laffan - Qatar Qatar National Cement Company (QNCC) Cement Factory No.3 (4000 ton/day capacity). Umm Bab, Qatar Precedes the fabrication and erection of piping spools . Material arrangements as per isometric drawing from client stores. Work schedule preparation and approval from client. As per work schedule required manpower engaging in the job Material traceability checking as per isometric with client Spool erection arrangements to be made Pipe spools field joints welding arrangements. Pipe support fabrication and erection as per pipe support drawing Mechanical clearance arrangements to be done as per P & ID After getting Loop Clearance, arrangements for Hydro testing Box – up arrangements. Revised isometric for support point, double pipe joints. Execution of manpower control. Documents preparing of completed joints &spools. Clearing for punch list (piping)
Arun kumar PMP®,'s Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




