
Aman Oberoi, P.Eng.
Project Manager @ Ledcor
About
An organized, goal oriented, highly motivated, multi skilled professional, with a diverse background that includes more than 18 years of extensive experience in project management, engineering, contracts management, project planning, and project control. During my career I have experienced managing various medium and large scale industrial, infrastructure and commercial projects which include but not limited to; construction of oil and gas processing facilities, pipelines, mining, civil projects, LEED certified commercial buildings, commercial and process buildings, refining and upgrading projects, maintenance facilities, infrastructure projects, civil utilities, roads, piling, electrical and communication distribution, storage tanks, pump house, electrical substation, waste water treatment plant and telecom towers. With a degree in Civil Engineering and working towards a Certification in Construction Management from B.C.I.T., I possess a diverse background and experience in design, construction management, regulatory and compliance, site supervision and quality control. Specialties: Project Management, Construction Management, Project Engineering, Project Planning, Project Controls, Regulatory and Compliance.
Canada
Surrey
Construction
Project Management, Construction, Construction Management, Concrete, Pre-construction, Subcontracting, Project Estimation, Civil Engineering, Project Coordination, Contract Management, Value Engineering, Coordination, CPM Scheduling, Process Scheduler, Primavera P6, Road, Constructability, Engineering, Project Planning, Inspection
Experience

Project Manager
Vancouver, British Columbia, Canada
Tank Hill Alliance Project: The project involves the design and construction of the permanent grade-separated bridge crossing by re-aligning and elevating Highway 1. The bridge will be constructed adjacent to the existing temporary at-grade crossing that was built after the November 2021 flood event that washed out the highway underpass.

Project Manager II (Regulatory, Compliance and Program Manager)
Vancouver, British Columbia, Canada
Trans Mountain Expansion Project: 4.5 Billion EPCM project for the Lower Mainland Project of Trans Mountain Expansion Project which includes: construction of 18 Km long 36 inch dia: pipeline through densely populated urban areas, construction of 2.6 Km of tunnel through Burnaby Mountain, expansion of Burnaby Terminal to include 14 new tanks and associated civil works, expansion of Westridge Marine Terminal to include three new oil tanker loading berths, expansion of Sumas Terminal to include 1 new tank.

Planning Manager and Project Engineer
JV Driver Projects Inc
Leduc, Alberta
Jacos Hangingstone Expansion Project: $400 Million Cost Plus Project for expansion of SAGD facility to increase the bitumen production by 30,000 BPD, which includes, construction of Central Processing Facility including, Process Buildings, Production and Oil treating area, Stream Generation plant, Oil Storage tanks, Water treatment plants, Flare Stack and Process and Storm Water pond construction. Client: Japan Canada Oil Sands

Project Engineer
Logan Lake, British Columbia
Highland Valley Mill Optimization Project: $400 Million design build (EPCM) project, which includes up-gradation of their existing Grinding mill operation lines to increase mill through put, construct new Pebble Crusher and Floatation facilities. Tie-in to the upgraded existing grinding mill lines, roads, underground utilities, pipelines, electrical substations, and foundations. Client: Teck Resources.

Project Lead/Area Manager
Alberta, Canada
Suncor Voyageur Early Works, Fort McMurray, Alberta: $110 Million Unit price contract to validate and complete early works for their previously shutdown project. Scope of work was to complete piling, foundations, deep and shallow underground utilities, underground process piping and earthworks for Coker and Sulphur plant areas. Client: Suncor Energy

Project Coordinator
Alberta, Canada
Suncor Firebag Village and Core Building Project: $147 million design-built Suncor Firebag Village Core Building Project which includes the design and construction of a 75000 square foot LEED certified commercial building, associated electrical power grid, sanitation processing, water treatment plant, underground utilities, fire water pump house and interconnecting roadways. Client: Suncor Energy Kearl Lake Telecom tower and Buildings: $4 Million fixed price contract for Construction and Commissioning of 300 ft high telecom tower and facilities. Client: Imperial Oil Kearl Lake OPP Plant Foundations: $46 Million Unit price contract which includes Cast in place piling, foundation, grounding and Earth work for Ore Prep Plant at Kearl Lake Project. Client: Imperial Oil Suncor Millennium Mine Truck Shop Expansion: $37 Million fixed price contract for 6 Bay expansion of an existing mine truck maintenance facility. Client: Suncor Energy

Project Coordinator
RKC Engineering

Site Engineer
Sant Construction Company
Aman Oberoi, P.Eng.'s Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.




