Adrien Wahil RADAJ
Senior Operations & Maintenance Manager @ Mosanada FMS
-
Qatar
Mechanical Or Industrial Engineering
Maintenance Management, Quality Management, Energy Efficiency
Experience

HVAC Division Maintenance Manager
Burj Khalifa Tower
• Maintenance Contracts start up and ramp up following constractors hand-over. • Conditional Snagging/De-snagging downstream handover stage. • As built drawing verification and update. • Built up Assets register database. • Maintenance plan set up, cooperation for migration to CMMS (IBM Maximo). • Functional tests on equipments. • Sequence of Operation verification and report. • Technical inspection rounds circuit creation: Migration to Maximo (barcode on asset to check). • Spare parts and consumables stock evaluation. • Assets Identification Card creation with criticism classification. • Standard Operation and Maintenance Procedure creation on Assets. • Staff Deployment as per zones requisitions, war room creation with training manuals, as built drawing, SOP • Staff permanent assessment and training on assigned systems. • On site interventions quality verification, live tests. • Troubleshoot assistance and Incident report. • Work orders and Interventions follow up on CMMS. • Energy consumption monitoring (LPG, BTU, Electrical meter reading) .

Maintenance Manager
Dalkia France
Région de Lyon, France
• Key contact with the clients, ensure that their expectations match with our services. • Technical Consulting / Advisory. • Setup and running maintenance plans • Reducing energy consumption • Costs saving incentives. • Contribution in equipments and employee safety: creating and enforcing intervention procedures. • Monthly activity reports delivered to the client and regular site meetings.

Maintenance R&D Engineer
Fonderies de Vénissieux SAS Renault Powertrain
Venissieux
• Maintenance costs/time reduction on the production line (“first aids” workshop) • Maintenance budget reduced by 4%. • Repairing time improved by 7%. (TPM) • New Warehouse Spare Part sorting inventory, Tagging and Tracking on Steel flow production line (casting step). • Costly Mechanical parts design modification: set up of shock-proof buffers for molds lifting points. • Call for bid with defined part specs toward Machining suppliers, Mounting and Testing of modified prototypes. • Drawings update of on the modified approved mechanics assemblies. • Standardization of the Electric and pneumatic parts, removal of the obsolete references. • Suppliers and Spare parts providers consultation for costs review. Tasks: • Electromechanical improvement for Safety specs on machine tools. • Investigations and observation of the production line and incident reports to spot weak and costly points of the production line. • Drawings and technical manuals sorting • Third Party Audit (APAVE) follow up on lifting equipments with approved companies. • Industrial Waste Management: policy setup to sort waste by type with informations sheet and colored containers.

Intern Maintenance and Production Engineer
Saint Maurice de Beynost
Intern Maintenance Engineer on Petrochemical Plant: - 8 Months as Preventive Electro-mechanical Technician. - 8 Months as Reactive Electro-mechanical Technician in rolling 3 shifts. - 17 months: Deputy Line Maintenance Engineer (Continuous improvement) Duties and achievement: Production Line Deputy Maintenance Manager. Dissertation subject: Definition and application of Total Productive Maintenance (TPM) on Polymer Plastic Film production Line. • Increase the production rate by reducing Maintenance Breakdown rate. • Production Operator shift management: Conditional preventive technical inspections and critical instruments value readings. • Line Operators assigned to perform basic preventive tasks on breakdowns. • Creation of standard operating procedures for Operators on production campaigns transitions. • Maintenance plan improvement on Polymer film production line. • Display of TPM dashboard (Total Productive Maintenance) as a reliability indicator on the production line to involve Operators on the quality policy. Tasks: • Electrical and Mechanical devices failure analysis in workshop, curative maintenance supervision. • Preventive Maintenance Supervision and enforcement of preventive work permits on Scheduled shutdown. • Instrumentations value match verification between SCADA and return signal measured, calibration. • Setup Safety procedures for sub-contractors’ works on site during Scheduled shutdowns. • Incident, breakdowns or quality failure report on SAP CMMS. • Exploitation of the CMMS history to spot weakness and highest or redundant breakdown. • Maintenance Plan optimization on Polyester Plastic film production line.
Adrien Wahil RADAJ's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.


