
adam kiecke
project manager
About
May 2011 – July 2012 (1 year 3 months)Houston, Texas Area ... The Society of Naval Architects and Marine Engineers was organized in 1893, to advance the...
united states
brenham
consumer goods
orcaflex, project engineering, finite element analysis, matlab, offshore drilling, engineering, oil/gas, autocad, ansys, deepriser, aqwa, commissioning, engineering management, instrumentation, naval architecture, simulations, subsea engineering, upstream, engineering design, oil, petroleum, oil and gas, energy
Experience

naval architect | marine engineer
ensco plc
As a naval architect for Ensco I performed Mooring and DP analysis for deepwater floating drillships, Jackup site assessments, lashing assessments for rig moves and served as the corporate lead on site for incline experiments and deadweight surveys. I performed theater specific drift off and riser analysis. Investigated expected results for possible upgrades and/or required upgrades for new theaters. In one years time acquired enough knowledge on the subject that I receive a charter to revise the company standard/process documentation.

project manager|technical lead
bmt scientific marine services, inc,
My primary role at BMT is Project Engineer in which I lead Scedule, Scope and Quality for long-term and large-scale deepwater riser monitoring systems. These systems generally comprise of subsea strain sensors with numerous options for additional water column and field instrumentation all channeled to a single HMI in the clients control room. I was also the Project Manager and Project Engineer of a first of its kind (for the company) real time drilling riser installation and operations monitor.

ocean engineer and data analyst
bmt scientific marine services, inc,
Monthly response reports of floaters to environment for asset QA/QC. Participated in tanker sea trials and model tests for production platforms.

naval architect|research specialist
horton wison deepwater
Horton Wison Deepwater was a boutique Offshore Engineering, Procurement, Construction and Installation Firm. The high point of the firm was the design and installaltion inf the BPZ Buoyant Tower. My primary role for my time with HWD was the design, procurement, installation and training for an automated ballast system. Also, performed structural, hydrodynamic and hydrostatic analysis on many different HWD patented offshore concepts to showcase the functionality and advantages of our approach.

project manager
blue bell creameries
Education
texas a&m university
engineering
texas a&m university
engineering
Activities and Societies: Human Powered Submarine, SNAME/MTS, Omega Epsilon, Young Life
adam kiecke's Contact Information
Phone
Find the Right Leads
Find Verified Contact Data
What LeadContact does well
Find verified emails, phone numbers, and decision-makers with 98% accuracy.
Find Leads
Find the right people by company, role, industry, location, and more.
925M+ professional profiles

Find Emails
Access verified email addresses for your target contacts.
657M+ emails

Find Phone Numbers
Get cross-validated phone data from multiple top sources.
239M+ phone numbers

More Accurate. Lower Cost.
Find contact data in 1 tool with 98% accuracy
LeadContact integrates leading enrichment tools to deliver more accurate contact data—without paying for each one.
Great conversations start with the right contact.
It’s time to find yours.

